Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
An LHCb general-purpose acquisition board for beam and background monitoring at the LHC F. Alessio, R. Jacobsson, CERN, Switzerland Z. Guzik, IPJ Swierk,
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
02/02/ S. Baron RF-Experiments Timing Meeting - Feb RF CMS ATLAS ALICE LHCb BTPX Status.
COGGING MEETING Cogging Semi-Fine Adjust without collisions? Fine Adjust When? Cogging Meeting – Sophie BARON.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
BLM update procedure: - Updated the RT software - Updated the BLETC firmware (ver _A) - Changed the firware version in the MASTER tables and generated.
22 March 2010 DCS workshop C. Bortolin, g. de cataldo and A. Franco INFN it/CERN CH 1 Progress on LHC data exchange LHC-ALI_DCS project overview Future.
CERN R. Jacobsson Between LHC and the Grid - Aspects of Operating the LHC Experiments – T. Camporesi, C.Clement, C. Garabatos Cuadrado, L. Malgeri, T.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
ALICE sensitivity to background and injection failures with the smaller aperture A. Di Mauro TREX meeting, 31/07/2014.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
Fabio Follin Delphine Jacquet For the LHC operation team
Luminosity monitor and LHC operation
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Wednesday
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of first LHC logging DB meeting
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday 21st January & night
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
LHC Injection and Dump Protection
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Summary Thursday h21: Stable beams fill #1303.
CTP offline meeting 16/03/2009 A.Jusko and R.Lietava
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
LHC Fast Timing Commissioning
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
ACR display works in progress Claudio Bortolin – Università di Udine
DCS for LHC IF Peter Chochula 28 june 2019.
Beam instrumentation and background monitoring
Beam Phase and Intensity Monitor for LHCb
Presentation transcript:

Update on ALICE-LHC interfaces & BCM Technical Forum, 25/03/10 Antonello Di Mauro Status of data exchange Cogging with BPTX and BPIM FW upgrade BCM response and thresholds studies Outlook

Status of data exchange List of parameters to be published via DIP to LHC fully reviewed (EDMS LHC-OP-ES-0018), some data are also displayed in the LHC_Config and LHC_Operation Vistar pages DIP directory name Description Source dip/ALICE/LHC/ExptStatus State of experiment (STANDBY, PHYSICS, ...) DCS dip/ALICE/LHC/BKGD Background monitoring BCM, SPD, V0 dip/ALICE/LHC/IntensitiesPerBunch Arrays of bunch intensities BPTX/BPIM dip/ALICE/LHC/Luminosity Total instantaneous lumi. [cm-2s-1] + coll. rate V0-AND dip/ALICE/LHC/LumiPerBunch Instantaneous b-by-b lumi. [cm-2s-1] dip/ALICE/LHC/LumiScan Coll. rate, errors, integration time SPD, V0-AND, ZDC dip/ALICE/LHC/FillLumi Total delivered and recorded lumi / Fill [cm-2] dip/ALICE/LHC/LuminousRegion H, V and centroid, tilt angles HLT, SPD dip/ALICE/LHC/AbortGap No. of protons in the abort gap in each beam dip/ALICE/LHC/Handshake Injection, Adjust and Beam-Dump HS states dip/ALICE/LHC/Timing/BPTX1 or 2 Phase, wrongBucket-flag and wrongBucket-array dip/ALICE/LHC/Timing/BPTX DeltaT of colliding bunches (shift from IP=0) 25/03/10 ALICE-LHC Interfaces

Status of data exchange All selected data from LHC subsystems and instrumentation published over DIP (machine configuration parameters and status, BLM, BPM, BCT, collimators, vacuum gauges) retrieved, treated and transferred by DCS to OCDB Treatment (smoothing) of data necessary to reduce memory load but also to fulfill other requirements (correlations between ALICE and LHC data,…) New project for online data analysis tool (G. De Cataldo) 25/03/10 ALICE-LHC Interfaces

Status of data exchange PVSS Distrib. Sys. OFFLINE HLT LOCAL archive OCDB FXS DIM LHC-ALI_DCS LHC ECS DIP DIM BPTX V0 T0 ZDC SPD PIT BCM PM ……. PVSS Distrib. Sys. V0_DCS V0_DCS DIM V0_DCS ACR-DISPLAY CTP From G. De Cataldo 25/03/10 ALICE-LHC Interfaces

Cogging with BPTX and BPIM FW upgrade Using scope and BPIM boards (from LHCb) to readout BPTX signal BPIM FW developed by E. Scapparone, only for triggering in 2009, phase measurements (BPTX1-BC1, BPTX2-BC1, …) done with scope BPTX arrival time difference used to calculate collision coordinate, LHC RF adjusted to set Z~0 BPTX-1 – IP2 = 146085.5 mm BPTX-2 – IP2 = 145361.5 mm (DTOF = 2.922 ns) BPTX-1 cable delay = 800.4 ns BPTX-2 cable delay = 670.8 ns Estimated offset DT(B1-B2)= 126.678 ± 0.200 ns BPTX-C (on beam-2) BPTX-A (on beam-1) 25/03/10 ALICE-LHC Interfaces

Cogging with BPTX and BPIM FW upgrade 23 Nov 2009 Beam-1 bucket 1 Beam-2 bucket 8911 Without cable+ beam TOF estimated delay correction 126.678 ns -> Measured Vertex Z = -1.3 cm 25/03/10 ALICE-LHC Interfaces

Cogging with BPTX and BPIM FW upgrade ATLAS CMS Measured vertex Z used to x-check/calibrate DT offset, corrected value: 126.820 ns 25/03/10 ALICE-LHC Interfaces

Cogging with BPTX and BPIM FW upgrade New FW (from LHCb, adapted by E.Scapparone) installed in BPIM readout boards, producing: bunch-by-bunch intensity filling scheme check (ghost bunches, wrong bucket) abort gap phase shift (B1-BC1, B2-BC2) DT(B1-B2) (z coordinate of IP) Commissioning in progress (in collaboration with LHCb), triggering working as usual, publication of bunch-by-bunch to be optimized 25/03/10 ALICE-LHC Interfaces

BCM response and thresholds studies MKI injection failures can produce TDI grazing resulting in large splashes reaching ALICE TDI grazing events produced by TDI setting up (jaws scan) or MKI delay scan have been used to check BCM response and estimate fluxes in ALICE 68,6 m 78,1 m 25/03/10 ALICE-LHC Interfaces

BCM response and thresholds studies BCM-A 8 sensors z = + 6 m, r = 10 cm BLM-MWBMD BCM C 7 sensors z = -18.5 m, r=10 cm

BCM response and thresholds studies Beam dump logic: Fast abort on RS1 (integration over 40 ms) or RS2 (integration over 80 ms) coincidences: dump the beam if 3 adjacent diamond sensors out of 4 show a current > thrRS1 or thrRS2 , respectively Slow abort on RS32-Sum (1.28 ms): Sorting out the two highest and the lowest of 8 sensors, dump the beam if RS32-Sum > thrRS32 Doses from misinjected beam were presented in ALI-INT-2001-003, updated by B. Pastircak in 2008 providing fluences in subdetectors. For BCM-A grazing on pilot bunch, fluence ~ 104-105 /cm2 25/03/10 ALICE-LHC Interfaces

BCM response and thresholds studies MKI delay scan BCM threshold 4000 nA Beam dump in 3 turns 200 nA 25/03/10 ALICE-LHC Interfaces

BCM response and thresholds studies BCM response: 100 part/cm2 ~ RS2: 1 nA Fluence from FLUKA simulation: 2 x 10-5 /p 1 pilot bunch (5x109 p)-> 105 part/cm2 ~ 1000 nA, as observed during the MKI delay scan, consistent with BLM response RS1 ~ 0.5 Gy/s (using conversion factors: 5.4x10-6 C/Gy , 2x10-15 C/part, 60 cm2 area) 4x72 bunches of 2x1011 -> 109 part/cm2 ~ 10 mA Proposed thresholds: RS1: 1500 nA, RS2: 750 nA -> ~ 5-7 x 105 part/cm2 RS32: 200 nA -> background ~ 500 part/cm2 25/03/10 ALICE-LHC Interfaces 13

Outlook BCM system instability on Post-Mortem events thoroughly checked, fixed with patches in PVSS and new simple procedure for shifter; further improvements to be discussed Implementation of BLM dedicated panel for shifter HW emergency buttons (ALICE-> SAFE, Beam-Abort) Implementation of Safe-Machine Flags from GMT (HW signals, not via DIP) to control transitions SAFE <-> NOT-SAFE Background monitoring (online and offline) dedicated effort 25/03/10 ALICE-LHC Interfaces