November 2008 doc.: IEEE /1437r1 July 2010

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0872r2 Submission July 2010 S. McCann (RIM), B.Kraemer (Marvell) Slide 1 P802.11u report to EC on request for conditional approval.
Advertisements

Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0775r0 Submission July 2009 Bruce Kraemer, MarvellSlide 1 TGn Closing Report - July 16 ‘09 Date: 2009-July-09 Authors: 5488 Marvell.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z conditional approval report to ExCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
TGn Editor Report Jan 2009 Date: Authors:
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
TGn Closing Report Los Angeles, CA, US 802 Interim
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
Mar 2010 Closing Plenary Motions
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
July 2009 Closing Plenary Motions
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
January 2012 doc.: IEEE /0179r1 Jan 2012
Presentation transcript:

November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 P802.11z report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-12 Authors: Name Company Address Phone Email Menzo Wentink Qualcomm Straatweg 66, Breukelen, the Netherlands +31 65 283 6231 mwentink@qualcomm.com Bruce Kraemer Marvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11z to RevCom. This document (11-10/0854r1) was approved during the closing plenary session of the 802.11 working group on July 16, 2009. Passed in the Working Group 11-0-0 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

IEEE 802 Sponsor Ballot Results – P802.11z November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 IEEE 802 Sponsor Ballot Results – P802.11z Draft Opened Closed Days Ballot Type Pool Approve Disapprove Abstain Return D6.0 2009-10-07 2009-11-06 30 Initial 144 103 87% 15 13% 7 5% 125 86% D7.0 2010-02-12 2010-02-27 Recirc 1 105 16 14% 9 6% 130 90% D8.0 2010-04-19 2010-05-04 Recirc 2 121 93% 8 7% 136 94% D9.0 2010-05-26 2010-06-10 Recirc 3 123 95% 6 D9.0a Recirc 3a 97% 4 3% D9.0a includes post ballot vote changes received via email. M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Comments by Ballot – P802.11z July 2010 November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Comments by Ballot – P802.11z Draft Ballot Not Required Satisfied Known Unsatisfied Assumed Unsatisfied Total D6.0 Initial 44 150 1 (Trainin) 16 (Roy) 4 (Palm) 4 (Epstein) 218 D7.0 Recirc 1 12 38 50 D8.0 Recirc 2 3 2 (Palm) 17 D9.0 Recirc 3 9 77 194 1 26 297 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments by Commenter November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Unsatisfied Comments by Commenter Commenter D6.0 D7.0 D8.0 D9.0 Total R. Roy (SRA) 16* S. Palm (Broadcom) 4* 2* 6* J. Epstein (Interdigital) S. Trainin (Intel) 1 25 2 27 *Assumed unsatisfied, no response to repeated e-mails to commenter M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Mandatory coordination June 2009 November 2008 doc.: IEEE 802.11-09/0674r0 doc.: IEEE 802.11-08/1437r1 July 2010 Mandatory coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D6.0 July 09 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 6 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

Unsatisfied Comments – Topics November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Unsatisfied Comments – Topics Topic #Comments Editorial 14 Power save 1 Security Frame routing 2 Off-channel 7 Frame priority Encapsulation Total 27 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

TGz Timeline Open Close Clean recirculation (TGz draft 10.0) November 2008 doc.: IEEE 802.11-08/1437r1 July 2010 TGz Timeline Open Close Clean recirculation (TGz draft 10.0) 2010-08-01 2010-08-11 M. Wentink (Qualcomm), B.Kraemer (Marvell) Bruce Kraemer, Marvell

802.11 EC Motion – Conditional Approval to send P802.11z to RevCom June 2009 November 2008 doc.: IEEE 802.11-09/0674r0 doc.: IEEE 802.11-08/1437r1 July 2010 802.11 EC Motion – Conditional Approval to send P802.11z to RevCom Request the IEEE 802 Executive Committee for conditional approval to forward P802.11z D10.0 to RevCom. P802.11z had a 97% approval on the last Recirculation Sponsor Ballot, including post ballot vote changes. There are 4 disapprove voters, and 27 unsatisfied comments. CRC vote on the Motion Passed: 12 y, 0 n, 0 a Moved: Bruce Kraemer Second: <tbd> Yes No Abstain M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 10 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel

Key July 2010 June 2009 November 2008 doc.: IEEE 802.11-09/0674r0 Coordination: comment supplied by a Mandatory coordination entity Not Required: comment indicated as not required to satisfy voter Satisfied: comment required to satisfy voter that is indicated as satisfied either by the voter indicating satisfaction with the specific comment, or by voting yes in a subsequent ballot Known Unsatisfied: a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has indicated they are unsatisfied with the comment resolution. Assumed Unsatisfied: comment not meeting any of the above criteria – i.e., a comment that is indicated to be “required” by the voter, and the voter is maintaining a “no” vote, and the voter has not responded when asked about their satisfaction with the comment resolution. M. Wentink (Qualcomm), B.Kraemer (Marvell) Page 11 Bruce Kraemer, Marvell Bruce Kraemer, Marvell; Adrian Stephens, Intel