Explanation to Participants about this template and final presentation

Slides:



Advertisements
Similar presentations
Title Slide – Technology or Company Name
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Lean Six Sigma Project Presentation Template
Project Storyboard Template
Project quality management Cody Ronning 3/23/2015.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Project Plan Development
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Everyone Has A Role and Responsibility
11 Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This.
7 th Continual Improvement & Innovation Symposium 2015 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CIS 499 Senior Seminar Introduction to IT project management.
Continuous Improvement Story Cover Page The cover page is the title page Rapid Process Improvement Story Template O Graphics are optional This CI Story.
1 Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Session 2: Developing a Comprehensive M&E Work Plan.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
Analyze Wrap Up and Action Items
Project Management PTM721S
CPI Event / Project Tollgate Template
TM 720: Statistical Process Control DMAIC Problem Solving

Lean Six Sigma Road Map Improvement Process Road Map
Six Sigma.
LEAN SIX SIGMA PROJECT TEMPLATE
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Continuous Improvement Projects
Principles of Information Systems Eighth Edition
Questioning: Foundation for an Effective Champion …
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
QUALITY IMPROVEMENT FINAL QUARTERLY COLLABORATIVE WORKSHOP
Chapter 5 :The Business Plan (Creating and Starting The) Venture
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Please highlight one choice only
MGT 498 Education for Service-- snaptutorial.com.
MGT 498 Teaching Effectively-- snaptutorial.com
Lean Six Sigma DMAIC Improvement Story
Chapter 5 :The Business Plan (Creating and Starting The) Venture
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
BPT 2423 – STATISTICAL PROCESS CONTROL
Improve Phase Wrap Up and Action Items
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Problem Solving.
DMAIC STANDARD WORK TEMPLATE
Please highlight one choice only
Advanced Leadership Course Monday, AM, Part 2 Project Initiation
DMAIC STANDARD WORK TEMPLATE
Technology innovation
Measure Phase Wrap Up and Action Items
Entry Guideline Template
Selected Topics in Project Management Project Initiation
Strategic Planning.
Sepsis Program Development
QMS, ISO and Six Sigma It’s all related…..
8th Continual Improvement & Innovation Symposium 2016 CASE STUDY COMPETITION: INNOVATION TEMPLATE [ Name of the Organization ] [ Innovation Title ]
Six Sigma Introduction 1 1.
Lean-Green belt six sigma program
APMP Professional Certification
Practical Assessment Project Template – DMADV
Presentation transcript:

Explanation to Participants about this template and final presentation This template is meant as a Six Sigma / Re engineering Submission Template This template gives guidelines. The Paper is expected to have evidence that the project was carried out using the principles of the six sigma /re engineering. 1

Introduction Give a brief summary about your organization Products and services Markets / customer No. of employees Location Size of business maximum number of pages 1 2

Project Charter The Charter should cover the following elements: The Business Case: The rational behind initiating the Six Sigma / Re engineering project from the business perspective. This part should answer why the project is important to the business and if it is addressing Short/Medium or long term challenges/Objectives. 3

Project Charter The Problem Statement: The description of the issue the way the team stated it in the project. Process mapping and how it was done. Identify Critical to Quality and to Process Indicators , please indicate how these indicators were recognized. 4

Project Charter The Goal Statement. The teams involved: Description of the set objective. The teams involved: Please indicate team and Organizational roles. Stakeholders model: Describe the relations and interests. The project timelines. Need to describe original set time limits for the various parts of the project vs actual completion dates. Quick Win opportunities (If any) 5

Measure Measurement Plan listing and description plus the rational behind it. Measurement system Analysis for the above if needed Gauge R&R or measurement system limitations or reliability Determine Process Capability 6

Analyze Problem Statement Validation of the Root Cause: Identification of factors contributing to the issue/problem. This is done through data stratification methods Validation of the Root Cause: Please indicate how this was carried out utilizing tools such as Design of Experiments or any other Statistical Methods. 7

Improve How were potential solution alternatives developed? Indicate Solution Criteria that was set by the team Show Evidence of Solution Evaluation D. Show Solution Selection Process (For Example this could be the ranking method) E. How was implementation planned, carried out and monitored? F. Process performance before and after implementation G. Improvement results – Cost saving/ revenue addition results verified by Finance deptt. H. Intangible improvements, if any . 8

Control Controls put in place to ensure that the gains are locked in and that the process is stable. (Describe the control system elements) B. Describe the roles of the stakeholders in this process How long the stability of the process was monitored? What was the result of monitoring (e.g. process capability, control chart limits etc.). 9

Project Closure Learnings from the project D. Team recognition. Plan Do Check Action Learnings from the project B. Where there any horizontal deployment opportunities. C. Plan for further refinement of the process D. Team recognition. Indicate how the team was recognized. 10

Finally Please use DAMAIC/DMADV or process re engineering(not only the limited examples covered in this guideline) Please indicate why this project is an excellent improvement example. 11