2017 X15 Turbo Compressor Cover V-band Clamp Reorientation

Slides:



Advertisements
Similar presentations
Access Process Timeline and Key Dates Access Impacts resulting from the HE 9.0 Upgrade.
Advertisements

CONFIDENTIAL © 2013 IDA Singapore. All Rights Reserved. 1 Proposal Concept Submission Template 1. Problem Statement 1. Project Scope Target Users Business.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Pipeline and Terminal Reporting Changes Meeting.
Honda Fit Turbo Kit Installation Manual. Take off windshield wiper.
TESTING SERVICES Overview Testing Accommodations is a collaborative process between the DRC student, the Professor, and DRC. COMMUNICATION IS ESSENTIAL.
Atlin/Taku Land Use Planning Update Presentation to Multiparty Workshop #3 March 6, 2009.
Online MSP APR System U. S. Department of Education.
Organization Name Presenter Name Presenter Title.
Group 18: Alejandro Castro Sam Leuthold Andrew Borger 1 GE Sponsor: Todd Hopwood Faculty Advisor: Dr. Van Sciver.
ITIL Project Change Management Workshop 7 February 2007
Single Module Vertical Outlet Tube Change
Aesthetic Devices - Medical Devices Pipeline Assessment, 2015
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
Risk Reduction Strategies Funct. & NF Requirements Summaries
February 12 – 19, 2018.
Pipeline and Terminal Reporting Changes Meeting February 11, 2004
Methane Emission Standards for Crude Oil and Natural Gas Facilities
Name of Small Business location
Governor Pad Location Change on ISC/ISL HT Twin Cylinder WABCO Air Compressor Mahesh Koyyada on behalf of Kimberly Van Selow.
L9 E6 OBD Phase C Product Update
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
CEAF for ISF3.8 soft engaged starter
VPCR CEAF César F. Demarchi March, 22nd 2017.
Information To support CEAF Increase of Thermostat Temperatures on Euro VI Products (EC9108, EC9045, EC9076, EC9080),(D0F3008BX03, D0F3012BX03, D0P3001BX03,
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
LEVEL 1 EFFECTIVE COMMUNICATION
[Project Name] Project Report
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
QSK19 Oil Pan Fillet Change
Implementation of bolt spacers to the oil cooler hardware
Affected Options: BR Option; EB Option; PH Option;
2017 X15 EH Bracket Machining Change
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
Off-Highway Diagnostic Improvement Project
[Project Name] Project Report
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Organisation Name Contact person: Address, Country: Phone n°:
Oil Pans with Full Circumference Clamping Plates for ISB6
Sticker Label Location Change on UL2 Supply Module
Level 3 Advanced Manufacturing Engineering Apprenticeship
EGTS CAL ID Update Cummins Confidential CEAF Type: Change Notification
LEVEL 2 STRESS AWARENESS
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
<Project Name> Milestone Summary Report
LEVEL 1 EFFECTIVE COMMUNICATION
Name of Project Manager Date
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
Organisation Name Contact person: Address, Country: Phone n°:
LEVEL 2 STRESS AWARENESS
Timeline Overview Planned Timescales
Educational Stability Program Review 2019/2020
LEVEL 2 STRESS AWARENESS
[Type Organisation Name Here]
[Type Organisation Name Here]
Presentation transcript:

2017 X15 Turbo Compressor Cover V-band Clamp Reorientation February 2nd 2017 Cummins Confidential

Project Scope Change Summary: Background: Reorient the turbo V-band clamp with the t-bolt on the topside with the bolt angling down. Background: We’ve identified a potential for contact between the V-band clamp and the turbo oil drain line fitting This will move the t-bolt away from the oil drain fitting eliminating the potential contact Implementation Strategy and Date: Within 1 week of CEAF Approval – Estimated at February 24th 2017 Cummins Confidential

Change Summary Current and New Locations: New T-bolt Location Current T-bolt Location Cummins Confidential

Change Summary New Location: New T-bolt Location ~62 deg downward angle Cummins Confidential

Change Overview-Approval Please confirm new turbo compressor V-Band clamp T-bolt location is acceptable and any compressor housing clocking process is not significantly impacted. Cummins Confidential