Newbury Safety Services Facility June 2017 Public Forum

Slides:



Advertisements
Similar presentations
SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Advertisements

Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
New Elementary School Project Overview of Dept. of Ed Role  Project Review/Approval Cycle Project applications submitted to DOE – June 2004 DOE construction.
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Lincoln Park Community Listening Session- Welcome!
Review of Town Building Needs Ad-Hoc Building Study Group.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
North East Study Area Staff Recommendation Thursday, June 25, 2009.
Transportation Services Report and TCCAP Update March 5, 2014.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
City of Leon Valley Town Hall Meeting. Background Since 1972, when the original City Hall was built, the City of Leon Valley has grown by over 8,900 residents.
Planning Integration Team for Community Health (PITCH) Progress Report to the Contra Costa County Board of Supervisors May 7, 2013.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Amherst County Comprehensive Plan (Update)
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Board of Selectmen Meeting April 14, Outline  Overview of problems  Overview of original plan  Overview of new plan Highlights Cost Timeline.
WELCOME OPEN HOUSE POSSIBLE ANNEXATION JULY 23, 2015 RECREATION CENTER AND NATATORIUM PEARLAND.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Developing a Plan for Accessibility The City of Brandon Accessibility Plan 2016.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Board of Commissioners Meeting
Site Planning & Power Supply
EMERGENCY OPERATIONS PLANS
Oregon Parks and Recreation Department Grant Presentation
Governmental Maintenance Division, Department of General Affairs
SUTTON POLICE DEPARTMENT
Process Layout Chapter #6.
Montgomery County Capital & Operating Budget Process Briefing
Newtown Square Fire Company No. 1
VCSD Capital Project Community Forum
Measure “o” FY Proposed Budget Presentation
E Properties & Development Holy Family Project Community Report Back Meeting August 7, 2012 St. Mary’s Lyceum – 6pm.
Healthy Neighborhoods Learning Collaborative Meeting
Valley & Third Streets Redevelopment
Fire Department Truth or Consequences Fire Department built a new complex in 2001 at 310 East 9th Street. This complex was setup to house an EOC/Dispatch.
TOWN OF CHESTER PROPOSED BUDGET
Fifth Standard Solar Project Complex
John Wood John Reed Mark Purple (Town Admin)
Town of Newbury Proposed New Fire Station
Washoe County Board of Adjustment
City of Saginaw Curb Side Leaf Collection Update
SEQRA as a Tool to Review Energy Projects
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
Planning Commission Meeting: August 3, 2016
NYSERDA Overview of the Town of Ashford’s Proposal for a Solar Facility on the Retained Premises July 25, 2018.
Recreation and Park Commission
Public Information Session
Neighborhood Traffic Management Program Greenbrook Drive South
City of Bayport Flood Public Information Meeting
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
WELCOME WELCOME.
Establish New Park Space in the Central District & Appropriate Funds to Acquire a Portion of an Existing Parking Lot for Conversion to Park Space March.
Project timeline: January 1st 2019 – fall of 2019
Article XIII – Form Districts Community Meeting
WADMIN (Community Pancake Breakfast)
Bannock County Comprehensive Plan
Black Mountain Parking & Circulation Study
Presentation transcript:

Newbury Safety Services Facility June 2017 Public Forum

Agenda: Welcome and introductions Our assignment in 2017 Recap of previous efforts Recap of available information Feedback from Saturday Questions and feedback Next steps

Our assignment in 2017: Review the work of the previous committees Facilitate community conversations to better understand the need, questions, and concerns related to future safety service structures. To address our Town Center land constraints - in 2005 the Town purchased 1.8 acre parcel adjacent to and to the East of the Library which is called Bald Sunapee. Then in 2007 another parcel that is 1.6 acres and is adjacent to and East of the Bald Sunapee parcel called Camacho - Last March during Town Meeting the residents asked the Selectmen to prepare and present a Plan at the 2012 Town Meeting for Town Center land use. The existing Newbury Fire and Police Station is a wood-framed building approximately 6400 square feet in size. The fire station uses approximately 5000 square feet and the police station uses approximately 1400 square feet. There are multiple areas of concern regarding the existing building including: The size allotted to the fire department is inadequate for today’s needs. The size allotted to the police department is inadequate for today’s needs. The present building is no longer up to current code requirements in the following areas: Structural capacity Electrical systems Heating and ventilating systems Energy conservation requirements There is inadequate storage space in both the police and fire departments for handling equipment and apparatus presently used on an ongoing basis. The existing police department layout is (aside from being too small) inefficient for the operations of the department. The existing police department layout presents areas of concern for the secure handling and storage of evidence and data, and affording privacy in the police officers’ work areas. The existing fire department ceiling is too low for the needs of today’s equipment. The existing fire department truck bay doors are too small for the needs of today’s equipment. There are inadequate space/facilities in the fire department to address the cleaning and maintenance of today’s emergency response equipment. There is inadequate turning space for fire department apparatus in front of the bay doors, necessitating maneuvering and backing up on NH Rt. 103 in a potentially dangerous manner. There is inadequate on-site parking.   The Newbury Fire and Police Station is currently located on a parcel of land at the intersection of NH Route 103 and Route 103A. The buildable portion of the parcel is relatively flat with embankments dropping down to abutting water bodies to the southeast and southwest. With the existing building and the parking lot, the parcel is fully developed. The Bald Sunapee/Camacho property is a land parcel that consists of two contiguous properties purchased by the Town of Newbury. There are wetlands on the site that have been mapped and located. A playground has been developed on the site. The present town library abuts the site to the northwest. The majority of the Bald Sunapee/Camacho property parcel is flat. The Camacho parcel, which is the east-most parcel, has some flat area along Route 103. However, more than three quarters of the Camacho parcel is a hill, rising approximately 40 feet above street level.

Recap of Previous Efforts: Newbury Town Center Committee 2011-2012 Safety Services Building Committee 2015 -2016 To address our Town Center land constraints - in 2005 the Town purchased 1.8 acre parcel adjacent to and to the East of the Library which is called Bald Sunapee. Then in 2007 another parcel that is 1.6 acres and is adjacent to and East of the Bald Sunapee parcel called Camacho A few years later at Town Meeting the residents asked the Selectmen to prepare and present a Plan at the 2012 Town Meeting for Town Center land use. The existing Newbury Fire and Police Station is a wood-framed building approximately 6400 square feet in size. The fire station uses approximately 5000 square feet and the police station uses approximately 1400 square feet. There are multiple areas of concern regarding the existing building including:

Identified Deficiencies & Needs The size allotted to the fire department is inadequate for today’s needs. The size allotted to the police department is inadequate for today’s needs. Prior to our tour this evening… From the documentation completed by the Town Center Committee – with documented participation by both departments to identify the deficiencies and need…

Identified Deficiencies & Needs • The present building is no longer up to current code requirements in the following areas: • Structural capacity • Electrical systems • Heating and ventilating systems • Energy conservation requirements

Identified Deficiencies & Needs There is inadequate storage space in both departments for handling equipment and apparatus presently used on an ongoing basis.

Identified Deficiencies & Needs The existing police department layout is (aside from being too small) inefficient for the operations of the department. The existing police department layout presents areas of concern for the secure handling and storage of evidence and data, and affording privacy in the police officers’ work areas.

Identified Deficiencies & Needs The existing fire department ceiling is too low for the needs of today’s equipment. The existing fire department truck bay doors are too small for the needs of today’s equipment. There are inadequate space/facilities in the fire department to address the cleaning and maintenance of today’s emergency response equipment.

Identified Deficiencies & Needs There is inadequate turning space for fire department apparatus in front of the bay doors, necessitating maneuvering and backing up on NH Rt. 103 in a potentially dangerous manner. There is inadequate on-site parking. You will notice that one of the posters reflects these deficiencies and needs, and the other represents some additional detail on these deficiencies and needs related to the Fire Department. This is an effort to clarify questions received during the previous committee’s effort to identify building alternatives.

Safety Services Building Committee 2015 -2016 Delivered a series of building and site related concepts for consideration We know that the recommendations from this committee received a negative response and was not supported at Town Meeting. That is Newbury has taken a step back this year. We do not think it is helpful to analyze the merits of the different design alternatives yet, but instead to see where there is consensus on the problems with the existing facility for both departments, and How best to proceed as a community.

Feedback Received Saturday The Majority of participants understand the need. Need to communicate and accept feedback throughout process. Concern remains over the cost. Questions about the future use of existing site. More examples from other communities needed. Refer to notes from Saturday…. Highlight findings

Questions and Feedback

Next steps: August meeting with Selectboard Online feedback form open: https://www.surveymonkey.com/r/NewburySafety September 12th Forum at 6pm