WLTP - Validation Phase 2 - Analysis of results

Slides:



Advertisements
Similar presentations
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
Advertisements

Software Quality Assurance Plan
The Value of a Project Management Office Copyright: Kathy J. Lang, 2004.
Ch-11 Project Execution and Termination. System Testing This involves two different phases with two different outputs First phase is system test planning.
WLTP-DTP DTP Meeting 1 Wrap-up Reviewed general considerations, methodology and timing Reviewed proposals Created initial working subgroups Preparations.
How to Document A Business Management System
WLTP GTR 15 WLTP-10-34e Report by Drafting Coordinator, Serge Dubuc
SE 555 Software Requirements & Specification Requirements Validation.
Systems Development Life Cycle
Web-site Design Strategy.  For P5, learners need to draw up plans for the evaluation of the website design.  The plans should include consideration.
PROJECT MANAGEMENT FUNDAMENTALS Page 2 Course Overview 1. Introduction to Project Management 2. Project Roles and Expectations 3. Project Management.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Output and User Interface Design
Validation of Non-formal Adult Education courses REACTION No CP LT-GRUNDTVIG-G1.
NIEM Domain Awareness June 2011 Establishing a Domain within NIEM.
SacProNet An Overview of Project Management Techniques.
Procedures for managing workflow components Workflow components: A workflow can usually be described using formal or informal flow diagramming techniques,
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
WLTP-DTP Test Procedure Development Methodology The DTP subgroup will undertake the following tasks: –Devise a methodology for the development of.
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
WLTP Informal document No. GRPE (62nd GRPE, 6-10 June 2011, agenda item 3(a) 62nd GRPE agenda item 3 (a) WLTP WLTP secretary – Noriyuki Ichikawa.
The Role of the Internal and External Evaluators in Student Assessment Arthur Brown Advisor to the Quality Assurance and Accreditation Project Republic.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN DTP12 Report to GRPE 17th January.
Summary of 3 rd Informal Group on WLTP 11 June 2009 Palais des Nations, Geneva Informal document No. GRPE (58th GRPE, 9-12 June 2009, agenda item.
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office for the Environment FOEN Welcome to the 7th Meeting of.
WLTP-DTP Results from DTP Session 1. WLTP-DTP First Test Procedure Meeting Overview  Hosted by USEPA in Ann Arbor on the 13 th, 14th, and.
2013 年 6 月 12 日 所内フォーラム nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half1 st half2 nd half WLTP-gtr.
Vice – Ministry of Environment Climate Change Mitigation Group The role and functions of DNA CDM Methodologies and Project Design Workshop República de.
CJA 354 Week 2 Individual Criminal Defense Case Analysis NEW Check this A+ tutorial guideline at Week-2-Individual-Criminal-Defense-Case-Analysis-NEW.
COMM 400 Week 1 Individual Communications Evaluation and Analysis Check this A+ tutorial guideline at
CPMGT 300 Week 3 Learning Team Planning Process Groups and Developing the Scope Check this A+ tutorial guideline at
DBM 265 Week 3 Individual Assignment Preparing to Install a Database Choose an installation that is appropriate for a DBMS environment. Gain the approval.
BSHS 332 Week 4 DQ 1 In assessing risk to benefit, on what basis do you make the ultimate determination of how much risk is acceptable and how much benefit.
BSHS 401 Week 1 DQ 2 Check this A+ tutorial guideline at 401/BSHS-401-Week-1-DQ-2 Define two of the following case.
Systems Development Life Cycle
WLTP - Validation Phase 2 (acceptability of the new test procedure)
WLTP GTR 15 WLTP-15-10e Report by Drafting Coordinator, Serge M. Dubuc
WLTP Phase 2 Durability Task Force Update
IT Steering Committee 6/9/2018 BEGIN - CONTINGENCY.
Drafting Coordinator Reports
Electric Vehicles and the Environment (EVE IWG)
DTP12 Report to GRPE 17th January 2013 Palais des Nations
Air Pollution Control and NIR Division
Welcome to the 10th Meeting of WLTP DTP 6th June 2012 UNOG Geneva
Guidelines for Self-Assessment at Program Level
مفاهیم بهره وري.
DTP 7th meeting – Bern September 2011
Air Pollution Control and NIR Division
مدل زنجیره ای در برنامه های سلامت
Positions on open points WLTP DTP subgroup LabProcICE
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
WLTP GTR 15 WLTP-09-18e Report by Drafting Coordinator, Serge Dubuc
GRPE/WLTP-IG/ DHC subgroup
Drafting Group: Final Meeting Drafting Group: 1st Meeting
A.1 to 3: Statement of technical rational and justification
Systems Development Life Cycle
Air Pollution Control and NIR Division
Mode Construction during Validation2
WLTP-DTC Air Pollution Control and NIR Division
Status Report Cop Taskforce
GRPE/WLTP-IG/ DHC subgroup
Discussion paper on Applicable Test Cycle and Mode Construction
Discussion paper on Applicable Test Cycle and Mode Construction
Establishment of Subgroup “Drafting”
Working Paper No. WLTP-05-10e
Palais des Nations, Geneva
HUD’s Coordinated Entry Data & Management Guide
WLTP - Validation Phase 2 - Analysis of results
GRPE/WLTP-IG/ DHC subgroup
Presentation transcript:

WLTP - Validation Phase 2 - Analysis of results (excerpt from the VTF terms of reference) 8. Data format and analysis of results   The format of input data for test execution and the data format of the test results will be described in the Technical Guidelines. The results will be uploaded on JRC ftp server by each participating lab. Instructions on how to access and upload/download data to JRC ftp server will be provided in the Technical Guidelines. A consistency and plausibility check will be performed as a first step of the analysis (Japan/EU). The analysis of the results will be carried out by each DTP subgroup, and DHC if necessary, under the coordination of the VTF. The outcome of this analysis will be put together by VTF and presented at a DTP/DHC combined working group with an initial assessment of the acceptability of the new test procedure. The WLTP steering committee will review this initial assessment before formal submission to GRPE for approval.