Implementation of CEN/TC 154 standards in Norway Geir Berntsen Norwegian Public Roads Administration Eastern Region
CEN/TC 154 - Aggregates SC 1 SC 2 SC 3 SC 4 SC 5 SC 6 M. Murvold – Standards Norway G. Berntsen - NPRA SC 1 Aggregates for mortar SC 2 Aggregates for concrete.. J. Karlsen Kontrollrådet SC 3 Bituminous bound aggregates N. Uthus NPRA SC 4 Hyd. bound and unbound aggregates S. Frækaland NPRA SC 5 Lightweight aggregates A. Monsen maxit as SC 6 Test methods G. Berntsen NPRA TG 2 Geometry – Requirements K. F. Solbakk, Mesta AS TG 3 Strength and other physical req. I. Horvli, NTNU TG 4 Chemical requirements V. Jensen, NBTL SC 4/WG 1 Armourstone A.Nicander Stema Shipping AS SC 4/WG 2 Railway ballast K. Skoglund Jernbane-verket TG 10 Aggr. from secondary sources (?) TG 13 Dangerous substances TG 11 Test methods for geometrical, strenght and other phsycial properties E. Erichsen/P. R. Neeb, NGU TG 12 Test methods for chemical therminal and weatering properties V. Jensen, NBTL FPC -> I. Jörgensen, Kontrollradet
Standards from TC 154 Aggregates NS-EN 12620 Aggregates for concrete SC2 NS-EN 13043 Aggregate for bituminous... SC3 NS-EN 13055-1 Lightweight aggregates SC5 NS-EN 13055-2 Lightweight aggregates (bit.) SC5 NS-EN 13139 Aggregates for mortar SC1 NS-EN 13242 Aggregates for unbound and.. SC4 NS-EN 13383-1 Armourstone SC4/WG1 NS-EN 13450 Aggregates for railway ballast SC4/WG2 Test standards SC6
New standards Guidelines/requirement specification General and special condition of contracts General and special work specifications Tender document Contract document
NOTIFIED BODY notified body within the product areas reinforced concrete products, cement, reinforcing steels, aggregates, products related to concrete and products for masonry. In addition to the role as notified body Kontrollrådet is also accredited both for product certification, quality system certification and environmental certification.
Aggregates - road construction Important standards: NS-EN 12620 Aggregates for concrete NS-EN 13043 Aggregate for bituminous... NS-EN 13055-1 Lightweight aggregates NS-EN 13242 Aggregates for unbound and.. Test standards (several standards) Attestation of conformity system: Unbound aggregate – module 4 Bound aggregates - module 2+
Revision of the Norwegian design guide for road construction – 01 NS-EN 13242 Aggregates for unbound and hydraulically... NS-EN 13043 Aggregates for bituminous.... NS-EN 12620 Aggregates for concrete
Example – sub-base layer
Example – asphalt base layer (asphalt gravel)
Wearing course (asphalt concrete)
General Specification Design guide - HB 018 General Specification Other requirements and national standards
General Conditions of Contracts Include: Specification and quantity Reference to HB025, 026 and HB018 Special conditions Demands on: CE-documentation Certification Attestation of conformity FPC deadlines
Tender documents Contract
Test standards Translated into Norwegian Layout changed to fit the rest of the described standards Question: relation to official documents? need for this handbook? just a working list? paper or intranet?
NS 3420- Specification texts for building, construction and installations 32 sections Example from section I5 – Roads, railroads and airports:
Standards used in the concrete industry NS-EN 12620 Aggregates for concrete NS-EN 13055-1 Lightweight aggregates NS-EN 13139 Aggregates for mortar Bound aggregates: Attestation of conformity system – module 2+
Make publication for manufacturing concrete updated according to 12620 The Norwegian Concrete Association (Norsk Betongforening, NB) is a professional society with 914 members (as per June 30, 2004). Make publication for manufacturing concrete updated according to 12620 (and other EN-standards)
NS-EN 13450 Aggregates for railway ballast Jernbaneverket, the Norwegian National Rail Administration, is delayed in the implementation of the EN-standards producers must be certified from next year
NS-EN 13383-1 Armourstone Not implemented
Summarize CEN/TC154 Standards for: concrete industry– implementation OK road construction – partly implemented, but still a lot of work to be done railways – delayed armourstone – not implemented