OUTLINE Questions? Midterm Results Go over Midterm Go over Homework

Slides:



Advertisements
Similar presentations
Optimization problems using excel solver
Advertisements

BU Decision Models Integer_LP1 Integer Optimization Summer 2013.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Operations Management Dr. Ron Lembke
Aggregate Planning in a Supply Chain
Aggregate Planning.
Ardavan Asef-Vaziri Systems and Operations Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
SOLVING LINEAR PROGRAMS USING EXCEL Dr. Ron Lembke.
Aggregate Planning.
Linear Programming Using the Excel Solver
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
Copyright 2009 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Sales and Operations Planning Operations Management - 6 th Edition.
Ardavan Asef-Vaziri Systems and Operations Management
Product Mix & Master Production Scheduling
Operations Management Aggregate Planning
Example 15.1 Daily Scheduling of Postal Employees Workforce Scheduling Models.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Planning Demand and Supply in a Supply Chain
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
DAY 10: EXCEL CHAPTER 8, 9, 10 Tazin Afrin September 23,
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Contents Introduction Aggregate planning problem
8-1 Aggregate Planning in the Supply Chain Supply Chain Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Chapter 4 Linear Programming Models. Example 4.1 – Advertising Model General Flakes Company advertises a low-fat breakfast cereal in a variety of 30 second.
Session 3 University of Southern California ISE514 September 1, 2015 Geza P. Bottlik Page 1 Outline Questions? Sales and Operations Planning Examples Qualifiers.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Linear Programming II. George Dantzig 1947 Narendra Karmarkar Pioneers of LP.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
AGGREGATE PLANNING BY GRAPHICAL APPROACH Particularly for high volume, standardized product system & closed job shop systems, the concepts & methods of.
AGGREGATE PLANNING IN A SUPPLY CHAIN MEMBERS SAMSON AKYOO 1100 ERNEST MBEZI 1129 GLADYS G. YAMBESI 1151 MWETE AMISI ALI 1152 ANZURUNI B. MALISAWA 1153.
Supply Chain Management By Dr. Asif Mahmood Chapter 9: Aggregate Planning.
Sales and Operations Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
A Multiperiod Production Problem
Aggregate Sales and Operations Planning
Problem 1 Demand Total There are 20 full time employees, each can produce 10.
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
Operations Management
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 8 Aggregate Planning in the Supply Chain
OUTLINE Questions? Go over Midterm Go over Homework New homework
Dr Sh Salleh bin Sh Ahmad
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Production Planning (APP)
Presentation transcript:

OUTLINE Questions? Midterm Results Go over Midterm Go over Homework New homework Production planning Quiz on 10/04

Midterm Results

Midterm Results

Aggregate Planning Demand enters as units of products We convert these to common units such as machine hours, labor hours, earned hours, pounds of material, etc. to create an aggregate schedule The master schedule details how many of each product are to be built in each period The major variables are the costs of changing the level of resources such as: labor machinery inventory impact of lot sizes

Example Note that definitions of variables are different in each book. Our objective is to minimize the total cost by: Varying labor levels Varying Inventory Varying lot sizes t periods (length of the horizon) n products m resources Inventory carrying cost Hiring and layoff costs Off loading (subcontracting) costs Overtime costs

Example (continued) We are usually subject to a number of constraints: Hours or shifts per day (a shift is usually 8 hours) Workdays per month (range from 19 to 31, usually use 20) Machine capacities (units made per hour) Overtime limits (how long can a person work per day?) Hours required per product (x.xxxx hrs/unit) Whether or not shortages are allowed Non-negativity constraints (all variables >=0)

Example (continued) Things that need to be balanced in each period Inventory Work Work Force Balance total demand with total production

Methods for solving Aggregate Planning Problems Spreadsheet trial end error Linear Programming (Simplex method, Dantzig 1947 – see the link on the links page) Excel Solver Other LP programs Non linear optimization methods (ISE520)

LP example

LP Example (see spreadsheet)

Using the Solver in Excel The solver is located under the “Tools” menu. The dialog box looks like this:

Using the Solver in Excel (continued) The dialog box for the constraints look like this: