SA Capstone Requirements and Design Week 1- Part 2

Slides:



Advertisements
Similar presentations
Chapter 2 Analyzing the Business Case.
Advertisements

Data Flow Diagram Purpose – visually depict how data moves and changes through a top-down, logical model Logical model – requirements and the relationship.
How to : Data Flow Diagrams (DFDs)
Systems Analysis and Design 9th Edition
Chapter 2.
Systems Development Life Cycle
Analyzing the Business Case
Fact-Finding Fact-Finding Overview
Systems Analysis and Design in a Changing World, 6th Edition
7M822 Software Requirements Introduction 7 September 2010.
Data Flow Diagrams "Business process flow" not a Flow Chart.
1 Structured Analysis Techniques. 2 Data Flow Diagrams.
Chapter 10 Systems Planning, Analysis, and Design.
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 3 Requirements Models.
Data Flow Diagrams (DFDs). Data flow diagram (DFD) is a picture of the movement of data between external entities and the processes and data stores within.
1 SA Capstone Requirements and Design Week 1 SYST36367 Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Systems Analysis and Design in a Changing World, Fifth Edition
Data Flow Diagrams A structured analysis technique that employs a set of visual representations of the data that moves through the organization, the paths.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
Data Flow Diagrams Objectives:
Data Flow Diagram A method used to analyze a system in a structured way Used during: Analysis stage: to describe the current system Design stage: to describe.
System Analysis System Analysis - Mr. Ahmad Al-Ghoul System Analysis and Design.
Investigating System Requirements
Sheridancollege.ca SA Capstone Requirements and Design Week 1 1.
1 Data Flow Diagrams. 2 Identifying Data Flows During the analysis stage of a project it is important to find out how data flows through a system:  Where.
System Planning (Preliminary Investigation Overview)
Systems Analysis and Design
BEST GROUP CONSULTANTS Lesson Department Information System.
Feasibility study A feasibility study is a preliminary investigation of a problem. It is used to decide whether a solution is possible and what effects.
1 Chapter 4 Analyzing End-to-End Business Processes.
3/5/2009Computer systems1 Using Data flow Diagrams Computer System: 1. Input 2. Data Processing 3. Output.
Data Flow Diagrams (DFDs)
1Lecture 8 Introduction to Systems Analysis l Objectives –Explain how systems analysis relates to business needs, problems, and opportunities –List and.
GCSE ICT 3 rd Edition The system life cycle 18 The system life cycle is a series of stages that are worked through during the development of a new information.
1 Systems Analysis & Design 7 th Edition Chapter 2.
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
ACC 542 Entire Course For more classes visit ACC 542 Week 1 Individual Assignment Computer Information System Brief ACC 542 Week.
Public Management Information Systems System Analysis & Design Saturday, June 11, 2016 Hun Myoung Park, Ph.D. Public Management & Policy Analysis Program.
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
Systems Analysis & Design 7 th Edition Chapter 2.
Phase 1 Systems Planning
Slide 1 Systems Analysis and Design with UML Version 2.0 An Object-Oriented Approach, Second Edition Chapter 3: Project Initiation.
Is 581 assist Inspiring Minds/is581assistdotcom FOR MORE CLASSES VISIT
Scope of Systems Requirements: Definition o f Requirements Not to define the full system Not to define the full system Describe or define the essential.
BSA 385 Week 3 Individual Assignment Frequent Shopper Program Part 2 Check this A+ tutorial guideline at
Systems Development Life Cycle
Investigating System Requirements
Project Planning: Scope and the Work Breakdown Structure
Systems Analysis and Design in a Changing World, Fourth Edition
Fundamentals of Information Systems, Sixth Edition
Information Technology Project Management – Fourth Edition
Business System Development
DATA FLOW DIAGRAM (PART 2)
DATA FLOW DIAGRAM PART 2.
SYSTEMS ANALYSIS Chapter-2.
Context and Data Flow Diagrams
Business System Development
Data Flow Diagram (DFD) Review
CIS 510 Education for Service-- snaptutorial.com.
CIS 510Competitive Success/tutorialrank.com
CIS 510 Education for Service-- tutorialrank.com.
تحلیل سیستم‌ها مدل‌سازی پردازشی.
Chapter 5 Initiating and Planning Systems Development Projects
Systems Analysis and Design with UML Version 2
Business Analysis DFD Levelling Chris Russell O2.41
Weekly Team + Faculty Meetings
Systems Development Life Cycle
Applied Software Project Management
UNIT No- III- Leverging Information System ( Investing strategy )
Public Management Information Systems System Analysis Thursday, August 01, 2019 Hun Myoung Park, Ph.D. Public Management & Policy Analysis Program Graduate.
Presentation transcript:

SA Capstone Requirements and Design Week 1- Part 2

Existing System Description Visual Paradigm Project Proposal Lesson Objectives System Vision Existing System Description Visual Paradigm Project Proposal Group Meetings

System Vision Before starting detailed Systems Analysis activities, a System Vision document is very helpful to: Confirm that the Systems Request merits further investigation and development Summarize the justification for a system The System Vision document should: Summarize the motivations, scope and benefits of a proposed system Allow readers to decide whether the system warrants a more detailed examination Entice interested individuals to continue reading related documents Serve as the basis for an “elevator pitch” to quickly and effectively inform partners/investors about the merits of the project

Problem Description System Capabilities Business Benefits Identify the Problem Problem Description What is the problem and idea for the solution? System Capabilities What are the capabilities the new system will have? (Helps define the scope) Business Benefits What are the benefits that accrue to the organization? Can they be expressed in Tangible (monetary) and intangible benefits (non-monetary) terms?

System Vision Document RMO CSMS

RMO CSMS Vision Document (1)

RMO CSMS Vision Document (2)

RMO CSMS Vision Document (3)

Existing System Description- Fact Finding To understand the existing system, your group should perform some Fact Finding which includes: Interviewing various stakeholders Collecting and analyzing system artifacts Possibly observing users and/or surveying them Drawing a Context Diagram of the system

Sample artifacts include: Purchase Orders Invoices Reports Existing System Description- Artifacts Request and collect artifacts to better understand the current business processes Sample artifacts include: Purchase Orders Invoices Reports Instruction Manuals Training Materials Current system software or simulation of this software Basically all documentation that they have or use relative for doing their business

Remember that there are only four symbols in DFDs: Existing System Description – Context Diagram Remember that there are only four symbols in DFDs: External Entity (source or sink of data) Process Data Flow Data Stores (not used in a Context Diagram!) Remember that at least one end of the Data Flow must be connected to a Process!

Data Flow Diagrams DFD Symbols *From: Systems Analysis and Design, Ninth Edition, Gary B. Shelly & Harry J. Rosenblatt, Course Technology, CENGAGE Learning, 2012

The keg project example

Habitat project example

Existing System Description – Context Diagram In Class Exercise

Narrative After completing the existing system’s Fact Finding your group should be in a good position to write a Narrative to describe the project. This Narrative can serve as an excellent starting point for subsequent analysis and design activities

Reminder – Capstone Project Proposal Your Capstone Project Proposal is due in two weeks! This means that for the next two weeks you must: Spend time with your client to gather all the information required. Complete your Capstone Proposal One key part of the Capstone Proposal is the System Vision Remember that your proposal and project should look beyond a single customer’s current needs.

Group Meetings Please break into your groups to start on your planning for the first deliverable.