Causes Of Contractors’ Failure In West Bank

Slides:



Advertisements
Similar presentations
FACTORS AFFECTING CONSTRUCTION COSTS IN SAUDI ARABIA By Yaser Abdulla Al-Juwairah Presented by Shaikh Imran Abdul Qayyum Gani.
Advertisements

1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Sanitation is Business
Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
Presentation for Thesis of Master Degree Done by Ali Abdullah Al Salman CEM – 520 Term Project (Paper Presentation) Assessments of Risk Management Perception&
Overhead Costs in Building Construction in Saudi Arabia Mohammad Al-Shahri Ahmed Al-Ojairi.
Generalised Mean Variance Analysis and Robust Portfolio Construction February 2006 Steve Wright Tel
OAG Office of the Auditor-General Promoting Accountability in the Public Sector Using Audit to Oversee Public Procurement Edward Ouko Auditor-General Kenya.
/ F.B : Lec# 1 Chapter # 1 Introduction to Investment Analysis and Portfolio Management By: Nusrat ullah noori / F.B.
Abdallah M. Al-Mahasheer
Wenxin Zhang Department of Civic Design University of Liverpool
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
1 Construction Claims in Residential Houses in Saudi Arabia Presented by Adel Al Rabee.
CEM 520: Construction Contracting and Administration 03 June 2007
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Eurostat Repeated surveys. Presented by Eva Elvers Statistics Sweden.
IAOS 2014 Da Nang: An agile approach to question testing and satisfying a new data requirement Pete Brodie ONS, UK.
Evaluation methods and tools (Focus on delivery mechanism) Jela Tvrdonova, 2014.
ONLINE VS. FACE-TO-FACE: EDUCATOR OPINIONS ON PROFESSIONAL DEVELOPMENT DELIVERY METHODS BY TERESA SCRUGGS THOMAS Tamar AvineriEMS 792x.
Connolly – International Financial Accounting and Reporting – 4 th Edition CHAPTER 30 JOINT ARRANGEMENTS.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Qualitative and Quantitative Research Quantitative Deductive: transforms general theory into hypothesis suitable for testing Deductive: transforms general.
Specification & Quantities Estimating
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
NATIONAL LOAN GUARANTEE FUND FOR SMEs GUARANTEES OF NLGFSME – A WAY FOR FACILITATING THE ACCESS OF SMEs TO FINANCING International Forum for Investments.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
Head Office Hannay House 39 Clarendon Road Watford Hertfordshire WD17 1JA UK Telephone: +44 (0) Facsimile: +44 (0)
BEST PROCUREMENT PRACTICES AND REDRESSING THE MAJOR CONSTRAINT OF PROCUREMENT FOR EFFECTIVE RESEARCH WORK IMRAN CONTEH PROCUREMENT OFFICER, SLARI.
FINCA Bank GEORGIA Customer satisfaction Survey and satisfaction Index (CSI)
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Industry Dialogue on xoserve Services 14 th September 2007.
Occupational safety and health of different industrial sectors in Khartoum State, Sudan–II- Analysis of occupational accidents and injuries.
Module 6: Business Application Software Audit Chapter 1: Business Application Software Audit 1.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
NCHCA Relationship Self-Audit Results
Claims in Construction Projects
FINANCIAL REPORTING FOR COOPERATIVE SOCIETIES
Causes of Disputes Prepared by : Ali Jamous Jasser Dwiekat
Bell Ringer List five reasons why you think that some new businesses have almost immediate success while others fail miserably.
Feasibility Study for Thermoforming Production Plant
2nd Global Procurement Conference | 4-5 July 2017
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
2) Methodology Research instrument:
UNDG Coordination Toolkit
Causes of Contractors’ Failure “ North West Bank” Graduation Project
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Implementing Mystery Shopper Technique on the Bank of Palestine
Factors influencing customer behavior
MODULE 2 INTRODUCTION TO GOVERNANCE AUDIT
The Impact of Gender Difference Between Employees and their Management on Employee’s Job Satisfaction in Islamic Banking Sector in Kingdom of Bahrain Prepared.
Chapter 3: risk measurement
Under supervision of: Eng. Reema Nassar
9/18/2018 Bids CONTRACTING Khamis…..
Bernhard Hulla, Executive Partner Human Dynamics
Chapter 4: Statement of Cash Flows
2016 Procurement Framework Contract Management
in Construction Industry
Difference of comments perception between men and
An - Najah national university Civil engineering department
Procurement Planning Effectiveness in Ethiopia: The Case of Minister of Urban Development, Housing and Construction /MUDHCo/ Anteneh Getahun EMBA EMBA.
ESCL – ANNUAL CONFERENCE 25 OCTOBER 2018 EDWINA UDRESCU, FCIArb Lawyer
The Tax Avoidance in Bulgaria: the Human Capital Approach
Supervisor: Eng. Mohammad abu neama
Contractual Indemnity 101
Faculty of Industrial Management CONCLUSIONS AND RECOMMENDATION
Agenda • Introductions • Project Objectives • Project Steps
Factors Affecting Bid/No Bid Decision Making IN The West Bank
‘ Causes of Delay During Construction Phase at Palestine ’
Fuelling the need of WA’s SMBs October, WA has more than xx million SMEs contributing significantly to the country’s GDP, exports and employment.
Presentation transcript:

Causes Of Contractors’ Failure In West Bank Prepared by : Abd elhay Tanbouz Jehad Ayoub Mohammed Qushtom Yousef Assaf

Presentation Outline Introduction Objective of the project Research Methodology Questionnaire Data analysis Results & conclusion Recommendations

INTRODUCTION The construction industry is one of the main sectors of the Palestinian economy. It is the tool through which a society achieves its goals of urban and rural development. However, it is becoming more complex because the complexity of the construction process itself and the large number of parties involved including clients, users, designers, regulators, contractors, suppliers and others.

objectives The main objective of this project is to understand the reasons behind failure of contractors and identify the most important factors contributing to their failure. This project will be in two main parts.

Project Failure A project is considered a failure when it has not delivered what was required, in line with expectations. There are many definitions of failure mentioned in literatures. According to Dun and Bradstreet According to Storey According to Watson & Everett

Research Methodology Research Strategy There are two types of research strategies, namely quantitative research and qualitative research. Quantitative Qualitative

Questionnaire

Name of organization : ………………………………………………… 2. Major type of work involved : Building  Roads  Water and Sewage  Electro mechanics. 3. Respondents designation :  Owner of organization  Project manager  Contractor  Secretary 4. Relevant working experience (Years): 1-3  3-5  5-10  > 10 5. Average of project executed per year($): Less than 1 million 1-2 million  2-3 million  More than million 6. No. of constant employees:  Less than 10 10-15 15-20 more than 20

The followings are causes for contractors failure in West Bank The followings are causes for contractors failure in West Bank. We need to choose one of the number from 1 to 5.   The numbers represent : 1  Strongly agree 2  Agree 3  Neutral 4  Disagree 5  Strongly disagree

Questionnaire Strategy Our sample size did not need to apply statistical laws because the sample is less than 30 -our sample was 26. However, if the sample is greater than 30, we must apply the statistical laws.

( 10 in Nablus , 4 in Tulkarem ) The questionnaires was distributed through 7 contractors companies classified second class in Nablus and Tulkarem (4 in Nablus and 3 in Tulkarem ) . The questionnaires was distributed through 14 consulting office in Nablus , and Tulkarem . ( 10 in Nablus , 4 in Tulkarem ) The questionnaires was distributed through 5 owners ( 3 in Nablus , and 2 in Tulkarem ).

Data analysis The data collected were analyzed using (SPSS-17) to provide answers to the questions of the study. Means, frequencies, standard deviations two independent sample T-test , One Way ANOVA test and post hoc test .

Results, Discussion & Conclusion

Recommendations After we analyzed the results and explained the reasons for the failure, we can now make some recommendations that can help contractors, in the future to overcome the problems of failure.

* Contractors should improve the practices of Recommendations * Contractors should improve the practices of calculating the project cost. * Contractor should appreciate the importance of having skilful project leader . * Contractor should not neglect any of the owner requests. * It is recommended that contractor should evaluate risk involved with each type of contract before entering into a contractual agreement with the owner.

* about limitation of importing , this issue remains out of control. Recommendations * It is recommended that contractors should use information systems to manage the cash flow effectively and analyze the investments’ opportunities. * The Contractor shall be obliged to pay the due installments on time, and he shall receive payments from the Owner in the allotted time. * the contractor must try to avoid relying on the banks for funding and not to resort to banks. * about limitation of importing , this issue remains out of control.