Compressor Station at the Georgian-Azerbaijani Border

Slides:



Advertisements
Similar presentations
Trans Anatolian Natural Gas Pipeline Project
Advertisements

Energy Conservation Energy Management.
TRACECA Poti–Constanta (section towards Odessa), Poti-Istambul or/and Poti-Rise International fiber-optic sub-marine cable backbones.
Book 2: Chapter 2 Economic Planning for New Pipelines.
1 The Bulgarian Natural Gas Market: The TSO’s point of view Angel Semerdjiev, Executive Officer, Bulgartransgaz EAD 30 January 2009, Sofia.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
TEMPUS in Azerbaijan “ Country report TEMPUS in Azerbaijan “Documentation for quality assurance of study programmes” project Country report Genoa 3-4 November.
Bulgartransgaz EAD: Perspectives for Investments and Developing of the Gas Infrastructure Southeast Europe Business Forum; 22 – 23 November 2012, Istanbul.
WATER ISSUES IN THE EASTERN EUROPE:
Chapter 8 - Interval Estimation
Lina Murauskaitė New Challenges in the European Area: Young Scientist’s 1st International Baku Forum May 20-25, 2013, Azerbaijan, Baku Integration of Renewable.
An investment project Creation of a demonstration object of energy effective office building.
Xero Energy Limited ∙ Tel: +44 (0) ∙ Registered as No. SC in Scotland, at 2/1A, 2 Parkgrove Terrace, Glasgow G3.
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
Several problems in implementation of the investment programs in power industry Speaker: A.Y.Kopsov, Member of the “Nice Club”, Doctor of Technical Science,
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
1 Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services.
INVEST IN THE FUTURE! INVEST IN YALUTOROVSK!. Yalutorovsk is a town of new perspectives! The area of the territory is ha. Supply of labor resources.
Overview of the Cooperation and Major Schemes Bok-Jae Lee Senior Research Fellow.
Diaspora, external trade and FDI in South Caucasus countries Pavel Chistyakov, Russia (Centre for Strategic Research; Geographic department of Moscow State.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Mr. Michael Sidamonidze, Head of New Energy Complexes Department Georgian National Oil Company “Saknavtobi” The role of Georgia in the new gas streams.
1 June 8, 2008 Vienna Economic Forum Tirana – The European Priorities in the Energy Sector for the Development of the Region Drs. Erik Regter.
January 28, A new power station, privately owned, is established in the Gaza Strip The Israel Electric Company receives a concession.
1 «BM SAKHALIN» OJSC Sakhalin oblast Complex woodworking operation in the Sakhalin oblast CONSTANTINE EDUARDOVICH BEZNOSYUK General Director at “BM SAKHALIN”
CENTER OF ENERGY SAVING AND INNOVATIVE TECHNOLOGIES 89, Taganskaya street, office 8, Ekaterinburg, Russia Tel/fax +7 (343) ,
How the PCIs are developed Céline Heidrecheid System Development Business Area Manager TYNDP perspective on project progress Copenhagen – 24 June 2016.
GSE - Gas Storage Europe1 GSE Investment Workshop “ Role of gas storage in the market place” Brussels, 24 May 2007.
Energy Management and Planning MSJ0210 Energy generation Eduard Latõšov.
Turbocompressor Market Opportunities and Forecasts,
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
Kenya’s INDC: Actions in the Energy Sector
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
ME444 ENGINEERING PIPING SYSTEM DESIGN
Interconnection between the ROMANIAN and the BULGARIAN
Presentation On Potentiality of Wind Power Generation in Bangladesh
Kamleshwar Khelawan, Senior Energy Specialist,
Alternative delivery models in public services
Assist Gas for Laser Cutting
Development of The SF6 Circuit Breakers
GEORGIAN ELECTRICITY MARKET OPERATOR
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
CREATION OF ENERGY EFFICIENCY FUND
Prof. Joan Iliopoulou - Georgudaki
Modern Russia’s Approach to Energy Cooperation in Northeast Asia
PRIORITY NATIONAL PROJECT
Massachusetts Electric Restructuring Roundtable
Presentation to the Enron Corp. Finance Committee
Cross-border Infrastructure Projects
Presentation to the MA Electric Restructuring Roundtable
Liana Jervalidze Expert on Energy and Regional Issues
Trading in Oil, Gold and Other Commodities
Why study man’s impact on the environment?
CONSTRUCTION PROJECT IN YAGOTYN DISTRICT, KIEV REGION
Transparency Project GRI NW Region.
Construction of Balkhashskaya TPS
New England Resource Adequacy
Long-term Capacity Market
Energy Sector Overview
Energy Strategy Center of Scientific Research Institute of Energy
INSTITUTE OF ECONOMIC FORECASTING RUSSIAN ACADEMY OF SCIENCES
The Collapse of Gaza's Electricity System – Well-Planned and
Wholesale Electricity Costs
Energy supplys in Germany
Strengthening Conflict Prevention: Recommendations for the EU
Perspectives on The Future of the Energy Sector
How does the CO2 quality impact on geological storage of CO2?
Synergies between NDCs & SDGs; Integration into National Planning
Presentation transcript:

Compressor Station at the Georgian-Azerbaijani Border Georgian Oil and Gas Corporation Vienna 23.10.2017

Project Overview Maximum pressure of gas provided from Azerbaijan to Georgia at the border is not more than 23-24 bar, that makes impossible to increase daily volume more than 6-6,5 mcm. It is necessary to discuss parameters In order to solve complex problem of guaranteed gas delivery to the Georgian consumers more effectively it is recommended arrangement of compressor station at the border with Azerbaijan. CS is considered to increase pressures of incoming gas up to 29-37 bar in order to satisfy pic demand of Georgia in long term perspective. An estimated cost of 8-10 mcm per day capacity and up to 37 bar pressure, approximately 7-10 MW capacity compressor station is 15-20 mln $. Investment costs include all, including equipment and materials, permits, construction and exploitation costs for the gas drawing compressor (It is established by the rough proximity of the European source data and may contain a significant margin of error). Besides, it is necessary to arrange the measuring unit corresponding to the modern, international standards at the borde and clean gas supplied from Azerbaijan.

KS at Georgia-Azerbaijan Border – Candidate for PMI Status Project Area Project of CS at the Georgia-Azerbaijani border, can be granted the status of a joint project of regional significance - PMI (Project of Mutual Interests) and supported by the European Energy Community.

Thank you for your interest Contacts www.gogc.ge public@gogc.ge