ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Endcap Muon meeting: FNAL, Oct , 2004 J. Hauser UCLA 1 TMB and RAT Status Report Jay Hauser University of California Los Angeles.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
University of Wisconsin
Timing/Synchronization Status
Update on CSC Endcap Muon Port Card
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
Muon Track-Finder Trigger
University of California, Los Angeles Endcap Muon Purdue
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
TMB, RAT, and ALCT Status Report
CSC Trigger Primitives Test Beam Studies
Analysis of Oct. 04 Test Beam RPC Data
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
University of California Los Angeles
TMB and RAT Status Report
CSC Trigger Meeting Summary
Effect of an ALCT SEU Much-overlooked good stuff
University of California Los Angeles
VCC Hardware Production Status
Sector Processor Status Report
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display Jay Hauser University of California Los Angeles ALCT TMB Periph Crate Event Display

FPGA Mezzanine Boards for ALCT, TMB, MPC, etc 516 boards produced 204 boards assembled 105 XCV1000 for ALCT672 (also TMB, MPC) 99 XCV600 for ALCT384 7 sent to Rice for MPC and evil purposes Found a bad batch of Eproms, working with Xilinx to understand problem Next assembly order of 230 boards – parts will be shipped next Monday Just ordered last baseline batch of FPGAs – 80 XCV600s for ME1/1

ALCT384 Boards 89 boards have been assembled 161 boards to be delivered in next 3 weeks About 50 boards shipped to FAST sites Testing: 2 test setups working, 4 students Testing can go faster than anticipated – net through-put of 3/day possible, including burn-in 1 hole in testing procedure found by FAST sites (short between threshold wires), fixed

ALCT-672 and ALCT–288 (ME4/1 boards not ok’ed for assembly, no FPGAs) Assembly of 6 boards of each type is complete 3 ALCT-672 will be shipped to PNPI in next shipment from FNAL On-chamber testing still not done  due to FAST site situation Proceeding with production of 130 ALCT672 boards (allows ME4/1) Still want to have on-chamber test before assembly (ME4/1 boards not ok’ed for assembly, no FPGAs)

TMB Status 18 boards assembled Overcame severe assembly problems with connectors, etc. 14 boards debugged and working (full set of bench tests) 1 at UF and 1 at UC FAST site, 1 at OSU 2 at Rice = spares for U.S. FAST sites Future: send 2 each to PNPI, IHEP, Dubna, 3 to CERN Would like additional 1 at OSU, 2 at UCLA labs (grand total needs 16) Integrated with ALCT and DMB at UCLA FAST site in April-May VME library finished and released July 9 MPC output/return FIFOs debugged July-Aug Next step for JK: build a TMB clock prototype board to investigate PHOS4 replacement options Upcoming Oct 14-18 tests with OSU and 2 chambers at UCLA

Current TMB Modes Centralized trigger handling added: Source Delay Ext Type Source Delay Ext Description CLCT VPF No N Cathode LCT Pattern Trigger, this is the normal trigger mode (VPF=Valid Pattern Flag) 1 ALCT VPF Adj Y ALCT Trigger acting as Scintillator 2 ADB Test Pulse Anode Test Pulse Trigger 3 DMB Ext Trig DMB Calibration Trigger 4 CLCT Ext Trig FAST Site Scintillator Trigger 5 ALCT Ext Trig ALCT External trigger, force TMB readout if ALCT VPF absent 6 VME Ext Trig VME External trigger, for self-test

TMB Firmware Plans I Top priorities, mainly for FAST sites: Design FMM signal handling - currently “topical” Change the key layer from 3 to 4 for software reasons. Add di-strip and multiple patterns. Di-strip patterns greatly increase (x4 to x16) the flux of cosmic ray CLCTs at the FAST sites. Multiple patterns are included in the ORCA simulation

TMB Firmware Plans II Fancy stuff: Additional possibilities: Basic stuff for CMS operation: Make timing diagrams for the multi-pattern CMS-type design. Improve the timing to the level required for CMS latency. Add DAQ multi-buffer handling capability. Fancy stuff: Add suppression of spurious output caused by radiation upsets by, for instance, a triple-voted detection of continuous unchanging trigger or DAQ output. Add RPC coincidence logic. Additional possibilities: Add trigger mode of L1A*(no LCT). This would require a lot of work on RAM storage of information and may not be supported by OSU for CFEB readout.

Peripheral Crate Layout CMS IN 2000/004 “orientation” note updated ME1/1 information included Chambers to slots: Loveless scheme: cable in sequential chamber order As per Matveev drawings (June 02): T M B D M B T M B D M B T M B D M B T M B D M B T M B D M B M P C C B T M B D M B T M B D M B T M B D M B T M B D M B 1 2 3 4 5 6 7 8 9

ME1 Peripheral Crates No DMB/TMB pair for ME1/A – just last cable to corresponding ME1/1 board pair Chambers 4-12 correspond to DMB/TMB 1-9 in crate:

Periph. Crate Cross-Sections   Full-size and reduced-size (TMB) VME64x cards + front panel (TMB shown) 9U x 100 mm VME transition cards 405 mm 100 mm ~25 mm Backplane region incl. connectors ALCT 1 SCSI-50 ALCT 2 SCSI-50 RPC 1 34-pin ribbon connectors 366.7 mm J1 J2 J3A J3B CFEB1 CFEB2 SCSI-50 CFEB3 CFEB4 SCSI-50 CFEB5 SCSI-50 RPC 2 RPC 3 RPC 4   VME64x cards + front panel (TMB shown) 6U x 100 mm VME transition cards 280 mm 100 mm ~25 mm Backplane region incl. connectors 366.7 mm J1 J2 J3A J3B CFEB1 SCSI-50 CFEB2 SCSI-50 CFEB3 CFEB4 SCSI-50 CFEB5 SCSI-50 RPC 4 RPC 3 RPC 1 RPC 2 34-pin ribbon connectors ALCT 1 SCSI-50 ALCT 2 SCSI-50

Brian Mohr Event Display Tabs for CFEB, Comparator, ALCT data displays Reads FAST site data (raw format) ROOT allows zooming, rotation Will add projections Dumps of Event, CFEB, TMB data for debugging