Production Activity Control

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Scheduling.
Air Traffic Control School Case Presentation – Dec. 2, 2010 Stephen Damian, Frank Trudo, Andrew Zuroski.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Production Activity Control
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
1 Forecasting, Planning and Scheduling
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Production Activity Control
Chapter 15 Scheduling McGraw-Hill/Irwin
Inputs and Outputs to Aggregate Production Planning
PRODUCTION ACTIVITY CONTROL (PAC)
CHAPTER 8 Operations Scheduling
FACILITY LAYOUT Facility layout means:
PRODUCTION ACTIVITY CONTROL (PAC)
Short-Term Scheduling
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Production Activity Control

Techniques for scheduling different for various manufacturing systems: When the plan has been developed, the next step is execution of the plan Production Activity Control (or often called Shop Floor Control) is to have activities performed as planned Techniques for scheduling different for various manufacturing systems: Project Job shop Batch Flow shop

Scheduling Batch Flow Line A group of similar items is manufactured on the batch line The focus is to minimize changeover time The smaller the changeover time, the greater the scheduling flexibility It is becoming very complicated when you have sequence-dependent setup

How much to produce? Or How long the run time will be? Depends on: Available on hand Demand rate The changeover time Production rate The sequence, if any, in which items should be run When the setup times are relatively small and independent of the sequence  produce first the item with smallest runout time Runout time is the period existing inventory will last given forecast usage (= units in inventory / demand rate)

Example Item Inventory Demand (units per day) R (in days) Scheduling priority) A 80 20 4.0 1 B 100 10 10.0 2 C 150 12 12.5 3 D 60 4 15.0

Economic Production Time (in days) Another Example Item Inventory Demand (Units per day) R (in days) EPQ Economic Production Time (in days) A 80 1.0 400 2.0 B 150 75 C 60 30 300 1.5 Do you see any problem here? What would be the solution?

Job Shop Scheduling Job shop production is characterized by: Process layout Many orders with different sequence of processes Scheduling is assigning of starting and completion times to orders (jobs) and frequently includes the time when orders are to arrive and leave each department. Sequencing is the assigning of the sequence in which orders are to be processed.

Priority Control To determine the sequence in which orders should be processed Common Priority Rules: First come first served (FCFS) Short processing time (SPT) : results in lowest WIP, lowest MLT, and lowest average job lateness EDD (Earliest due date): works well when processing times are approximately the same Slack time (ST): supports the achievement of due date objectives Critical ratio (CR)

Example Day 125 (all times are in days) Order Due Date Current Operation Time Total Operation Time Remaining MLT Remaining # Operations Remaining Slack Time Critical Ratio A 130 1.5 3.0 6.0 3 2.0 0.83 B 132 1.0 4.5 9.5 5 2.5 0.74 C 136 4.0 8.0 4 7.0 1.38 D 138 3.5 9.0 2 1.44 ST = Due Date – Present Date – Total Operations Time Remaining Due Date – Present Date CR = ------------------------------------------- CR = 1 means the order is on schedule MLT Remaining

Sequencing Results EDD : A – B – C – D SPT : B – A – C – D ST : A – B – D – C CR : B – A – C – D Observation: A and B always scheduled earlier than C and D Important: The status of WC to which each order goes next should be considered. (If A will go to a work center overloaded with high priority orders, there is little point of scheduling it first in the current WC)

Queue Length Management Affect WIP and manufacturing lead times Queues are planned to compensate uneven flow of incoming work and the variations in work center processing times The objective of QLM: To reduce WIP To shorten MLT To better utilize bottleneck resources

Operations Overlapping Dividing a lot into two or more batches Used to reduce MLT SU1 1 Run 2 Run SU2 1 Run 2 Run To avoid idle of operation B, SU2+TAB+Q1PB>=Q2PA+TAB Where Q = Q1+Q2

Savings in Lead Time SU1 1 Run 2 Run SU2 1 Run 2 Run SU1 1 Run 2 Run Without overlapping SU1 1 Run 2 Run SU2 1 Run 2 Run With overlapping SU1 1 Run 2 Run SU2 1 Run 2 Run Lead time savings

INPUT/OUTPUT CONTROL Short-range control technique (normally daily) Compare scheduled input and output to actual input and output Effective for controlling queue, WIP, and MLT Enable the planner to determine the actions necessary to achieve the desired output , WIP, and MLT

Single Work Center Processes

Input / Output Control Day 25 26 27 28 29 30 Input Planned (PI) 16 Actual (AI) 12 19 22 10 15 Cumulative Deviation (ICD) -4 -1 5 -2 Output Planned (PO) Actual (AO) 17 18 Cumulative Deviation (OCD) 1 3 2 WIP (Ending) Planned (PWIP) 32 Actual (AWIP) 31 36

Normal Situation (Under Control) PWIP is less than 3 or 4 times of std of the ending WIP Acceptable deviation is about twice the standard deviation Typical out of control situations: Queues exceed upper limit due to equipment failure, inefficient processing, and excessive input. Solution: decreasing input or increasing process output. Output is below the lower limit due to equipment failure, inefficient processing, inadequate input, or wrong input at assembly work centers.

WIP Reduction Day 25 26 27 28 29 30 Input Planned (PI) 14 13 Actual (AI) 12 17 16 9 Cumulative Deviation (ICD) -2 1 3 -1 Output Planned (PO) Actual (AO) 15 18 Cumulative Deviation (OCD) -3 WIP (Ending) Planned (PWIP) 23 20 Actual (AWIP) 32 21

Inadequate Input Day 25 26 27 28 29 30 Input Planned (PI) 16 Actual (AI) 12 13 Cumulative Deviation (ICD) -4 -8 -11 -15 Output Planned (PO) Actual (AO) 15 Cumulative Deviation (OCD) -1 -2 -5 WIP (Ending) Planned (PWIP) 20 Actual (AWIP) 17 14