User Manual for Extracting Interest report from SAP
Interest Report Enter T-code ZINT_TDS
Enter the required fields viz. RSG(Sub-division), Category , Date range.
Enter the Date Range from 01.04.2017 to till date.
Background Execution: On the menu bar, go to Program ---> Execute in Background or Press F9
Background Execution – 1: Selection of scheduling the job
Background Execution – 1: Selection of scheduling the job
Background Execution – 2: Executing the scheduling of job
Background Execution – 3: Fetching the Spool of completed Job Using T-Code “SP01”, spool of the completed job can be extracted as shown in the adjoining screenshot.
Background Execution – 3: Fetching the Spool of completed Job
By default the spool displays the 10 pages By default the spool displays the 10 pages . For the whole list to be displayed click on settings.
Specify the page range as per the requirement
Output Screen