EVLA NSF Mid-Project Review System / Antenna Status

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
R. HaywardEVLA Front-End CDR – EVLA Front-End Schedule 24 April EVLA Front-End CDR EVLA Front-End Schedule.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Q, Ka, K, Ku & X-Band Receivers
SJDAdvisory Committee May Production & Maintenance Steven J. Durand May 2006.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
ELENA installation progress F. Butin / ELENA collaboration.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
Future LBO Developments
Cosmic Microwave Technology, Inc.
Software Overview Sonja Vrcic
EVLA Availability - or - When Can I Use It?
Redundancy Switching Components
EVLA Front-End CDR – EVLA Front-End Schedule
EVLA Project Peter Napier
WP02 PRR: Master Oscillator and RF Reference Distribution
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Production & Maintenance
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting System Status
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Racks Bins and Modules PDR
Data Transmission System Digital Design Chris Langley NRAO
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Rack installation and local tests for the MEBT Chopper Rack
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

EVLA NSF Mid-Project Review System / Antenna Status Jim Jackson, Hardware Systems Engineer 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Electronics System Antenna VLA Site 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Electronics currently in (or ready for) production D301-4 DTS Module – excluding 3-bit digitizer PCB D351 DTS De-formatter F320 Front End Transition Module L300 Synthesizer Reference Generator L301 12-20 GHz Synthesizer L304 LO Reference Receiver L305 / L350 Reference Generators L351 Offset Generator L354 LO Driver L355 Digital Timing Distributor M304 Module ID P301/302 DC/DC Power Supplies T302 LSC Converter T303 UX Converter T305 Baseband Converter - Digital -48 VDC Power System Front End Card Cage Main Shielded Equipment Racks Represents: 68% of Antenna Electronics 80% of Central Electronics 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Modules in final design – ready for production by 1 July 2006 F317 Front End Controller – In final testing L353 LO Transmitter – PCB Revision Motherboard to integrate design M301 Converter Interface – In final testing M302/M303 Utility Modules – In final testing P350/P351 DC/DC power supply – PCB Revision PCB Mod to support N+1 redundancy Power Dist. Board for Central LO – New PCB Design T301 4/P Converter – PCB Revision Corrects 1024 MHz Isolation Issue on RF PCB Solar Attenuator PCB to be developed module can be produced without this PCB 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Electronics Modules in final design – ready for production by 1 July 2006 T304 Baseband Converter – In final testing New Total Power Detectors New Filter Arrangement L302 10.8-14.8 GHz Synthesizer – In final testing New MIB / DDS FPGA firmware developed Updated units being tested in Antenna 18 Represents: 27% of antenna electronics, 20% of central electronics 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Front-Ends 4 Band Complete – Using existing VLA receiver P-Band Mostly complete – Using existing VLA receiver Modification required to stop LNA oscillations in S,C and X-Bands L-Band Horn complete and in production Prototype OMT and receiver in lab testing – issues as mentioned Balanced amps from CDL in use on existing and prototype receivers S-Band Half scale feed horn built and currently being tested Receiver to be developed, CDL wideband amps now available Wideband OMT awaiting L-Band results – S-Band will use scaled down version C-Band Interim receiver in production (final receiver minus wideband OMT) OMT design complete - Awaiting L-Band results – C-Band will use scaled down version 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Front-Ends X Band Currently using existing VLA receiver New X-Band will be last to be developed – funding permitting Ku-Band New feed Horn to be developed New Receiver to be developed – will be based on K-Band design K-Band Using Existing VLA Feed and Receiver Added block converter and modified LO/IF chain In production Ka-Band Horn in production Receiver development underway Q-Band Using Existing VLA feed and receiver New MIMIC post amp and block converter 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Test Racks EVLA Integration Lab in AOC Two complete LO systems Antenna electronics racks Identical Infrastructure to site Fiber Ethernet switches 8/14/22Km fiber spools -48 VDC power supply system with batteries LO Reference from Maser Lab Test Capabilities All Antenna LO/IF/Fiber modules Antenna M&C system Facilities for connection of operational front-ends (including cryogenics) Actual simulation of LO round trip phase Can actually run simulated observations using EVLA software 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Central LO Racks 5 DoD “Tempest” certified RFI shielded equipment racks Located in VLA Electronics Room -48 VDC N+1 redundant power supply with batteries (1 Rack) Central LO electronics common to all EVLA antennas (1 Rack) Generates all reference signals for antennas and WIDAR correlator Synchronizes EVLA system to VLA system during transition Second redundant system not yet implemented Antenna LO distribution and round-trip-phase monitoring (3 Racks) Transmits LO and timing signals to 28 antennas Measures LO round-trip-phase to each antenna 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Antenna Retrofits Mechanical refit procedures Site personnel have procedures established Last two refits (antennas 18 & 24) have proceeded smoothly New antenna component designs proven and in use New upper feed cone assembly Feed / receiver mounting systems Electrical / HVAC upgrades Cryogenic upgrades – new compressor & platform, Scott-T boxes, etc… Shielded equipment racks Fiber optic cable wraps No adverse effects on antenna structure or performance Remaining antenna issue Feed moisture control Several options exist Low cost options being explored first 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Antennas 13, 14 and 16 Have received full EVLA refit Turned over to operations for initial scientific use Using 2Gsps 8-Bit digitizers for transition L,C,X,K and Q bands available with 4 IF channels 4 and P bands available on antenna 14 Total power detectors and ALC to be added shortly Antennas 14 and 16 have prototype LO hardware Software compatible, retrofit Mid CY 2007 Antennas 13 has production LO hardware Tests and evaluation on-going Scientists being encouraged to use antennas in observations 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Operating since Mid-March w/ 2 IF’s at X-band Fringes obtained within minutes of first power-up X band now available w/ 4 IF’s 4,P,L,C and K bands available mid May Mostly production hardware Temporary test bed for updated hardware New L302 10.8-14.8 GHz synthesizer firmware M301 converter interface for band switching T301 with updated RF Board T304 baseband converter with ALC Caused minor delay in outfitting Turn over to operations likely in early June 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Antennas Mechanical refit complete late March Outfitting electronics now First fringes at X-Band expected mid May New M302/M303 utility modules First Antenna with no copper wire communication All communications and safety thru Ethernet fiber Antenna 26 Currently in barn for azimuth bearing change VLA electronics stripped early April EVLA refit to begin by 1 June 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status Correlator Room New Screen Room for WIDAR Correlator 48’ x 47’ 100dB shielded room Power and cooling to support 250KW load of correlator & back-end Room installed, RFI tested and accepted from manufacturer Electric panels, fire alarm and fire suppression systems installed Raised flooring currently being installed Fiber/RF coax penetrations installed On schedule - will be ready well in advance of WIDAR arrival Old correlator room Deformatter and fiber racks installed and in use Location of fiber optics and DTS deformatters during VLA to EVLA transition Equipment to be moved into WIDAR correlator system when commissioned Deformatters feed into VLA D-racks during transition Location of new EVLA computing and networking equipment 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

System Status VLA Site Infrastructure Fiber Optics All underground cable installed Antenna pad boxes installed as needed Most control building fiber infrastructure in place Fiber lab in place Full suite of test and assembly equipment Fabrication of cables and assemblies Full capability & training for testing, maintenance and repair Power / HVAC Upgraded to support new EVLA systems Buildings New cold storage building built to support EVLA project 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006

EVLA Advisor Committee Questions? 11/17/2018 Jim Jackson EVLA Advisor Committee 8-9 May 2006