Raw Materials For Precast Concete Pipe and Box Culverts

Slides:



Advertisements
Similar presentations
Materials Auditing on LPA Projects Experiences of one district.
Advertisements

Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
Concrete Specification and Roadway Standard Revisions Bill Miller, PE Bureau of Construction and Materials Mark Burkhead, PE Bureau.
Buy America Montana Department of Transportation Pat Ernst & Anson Moffett Construction Engineering Services Materials.
Amendments to the Specifications Discussion of Changes to the Concrete Materials Specifications.
PIPE INSPECTION AND REPAIR
Concrete Pre Cast Panel By Peter Spence ID:
First Article Inspection Report
Break Down of Concrete Components. Mineral Admixtures: Pozzolans & Cementitious Fly Ash Slag Cement Silica Fume – Benefits Higher strengths at later age.
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
District QA Findings Summary Aggregate – Documentation: While reviewing the delivery tickets for aggregate being shipped to the project it was.
Concrete Tanks and Distribution Boxes: Watertightness and Corrosion Claude Goguen, PE Director of Technical Services National Precast Concrete Association.
VOLUMETRIC MIXED CONCRETE MOBILE VOLUMETRIC MIXERS.
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
First Article Inspection
ECheck Requisition System Updated 12/29/2008https://enet.miami.edu/
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
Presented at the City of Milwaukee Small Business Week Sustainability Conference June 3, 2014.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
1) Complete all steps of the verification process Two webinars available on the Verification Process: Verification Process – What is involved?
Biosolids Annual Report A Step by Step Guide to Submittal.
Sign Structures Updates: Helpful Tips for Inspectors
Concrete Weight Coating Plant “Aladja”
Precast Concrete Septic Tanks
INTERNATIONAL BUILDING CODE 2012
Installation and Inspection of Concrete Pipe Joining / Joints
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Structural Works Assessment
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Third Party Activities for FH1 Project
B2B E-Commerce Chapter 2.
Acceptance Process for Manufactured Products by Certification:
First Article Inspection
ACPA QCAST PLANT CERTIFICATION
UTILITY VAULTS: THE PRECAST ADVANTAGE
Construction Management
Navigating FDOT Specifications and Standards
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Leo Associates Services
Please call for pricing
Quality Control Personnel Training
REPAIR and FINISHING.
QC Personnel Responsibilities
Precast Concrete Pipe and Box Culvert Equipment Calibration
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Quality Assurance for Emulsified Asphalt Surface Treatments
Working Session on American Iron and Steel (AIS) Requirements for the Clean Water and Drinking Water State Revolving Funds WWEMA 109th Annual Meeting.
Fasset Briefing Session
Installation Binder / IRR – an example
ETID has a Scrap Module to create and submit ETIDs for Scrap Property.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
PIPE TESTING
Prime Factors for Successful Preservation Treatments
Aramco e-Marketplace Supplier Quick Reference Guide
Hurdles - Production
Table 1. The most important aspect applied in MIVES
Radiopharmaceutical Production
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

Raw Materials For Precast Concete Pipe and Box Culverts FDOT Certification Requirements

Material Certification is Important Producer Statement of Product Quality FDOT Requirement FDOT Section 6 FDOT Materials Manual ASTM Specification Requirements

FDOT Section 6 6-1.3 Certification: 6-1.3.1 Producer Certification: Ensure completeness and correlate certification(s) of materials provided. Furnish to the Engineer for approval, certification from the producer for all products listed on the Department’s Qualified Products List (QPL) and when required by the applicable material Specification(s). Do not incorporate any manufactured product(s) or material(s) into the project without approval from the Engineer. Materials will not be considered for payment when not accompanied by Producer Certification. Producers may obtain sample certification forms through the Department’s website. Ensure that the certification is provided on the producer’s letterhead and is signed by a legally responsible person from the producer.

FDOT Materials Manual Volume II 6.2.7.4 Quality Control of Certified Materials 6.2.7.4.1 General Ensure that all materials used to manufacture of Pipe are from Department approved sources and comply with all requirements as specified herein. Concrete Pipe 6.3.7.4 Quality Control of Certified Materials 6.3.7.4.1 General Ensure that all materials used to manufacture of Structures are from Department approved sources and comply with requirements as specified herein. Box Culverts

Materials Certifications Department Approved Sources Source Codes Qualified Products List (QPL) All materials used to manufacture RCP and RCB must be from FDOT approved sources.

What Materials Need Certification? Steel and Welded Wire Reinforcement ASTM / AASHTO / Section 415 Coarse and Fine Aggregates Sections 901 and 902 Cement Section 921 Pozzolans / Slag / Fly Ash Section 929 Water Section 923

What Materials Need Certification? Gasket Material and Lubricant Section 942 Round and Profile Rubber Gaskets Cold Adhesive Preformed Plastic Material Geotextile Fabrics Section 985 Standard Index 199, Type D-3 Curing Materials Burlap / Waterproof Paper / PE Sheets Section 925

Materials From The Qualified Products List (QPL) http://www.dot.state.fl.us/specificationsoffice/QPLindex.htm Concrete Patching Materials Section 926 Epoxy Compounds Section 930 Materials for Concrete Repair Non-shrink Grout Plug Lifting Holes /Repair Defects Section 942

Materials From The Qualified Products List (QPL) Admixtures Section 924 Plastic Chairs / Spacers / Bolsters Section 415 Steel Reinforcement Resilient Connectors Connects Pipe to Structures Section 934

Be Aware of Contract Documents Note that steel is not in the QPL Steel certifications must meet contract documents (e.g., standard specifications) Not all materials may be listed in FDOT QPL or FDOT Approved Source list Always understand material requirements of contract documents

How To Check For Certification Material supplier provides plant with a certification statement/delivery ticket Check FDOT Materials Office Web Site Approved Sources http://www.dot.state.fl.us/statematerialsoffice/quality/programs/qualitycontrol/materialslistings/index.htm Check QPL Web Site http://www.dot.state.fl.us/specificationsoffice/QPLindex.htm

Want to know the FDOT Source Codes that correspond to aggregate gradations and types? The FDOT document, “Instructions for Coding of Aggregate Test Data for Computerization”, lists all FDOT aggregate sources codes and describes the corresponding aggregate type and gradations.

Approved Material Producer Web Site Approved Pipe and Box Producers Click Link to View Producer Approval Status http://www.dot.state.fl.us/statematerialsoffice/quality/programs/qualitycontrol/materialslistings/index.htm

Sample Certification for Profile Rubber Gasket Company Info Redacted

Gasket Lubricant Certification 12.4.1 The lubricant manufacturer shall supply the purchaser written certification that the gasket lubricant has met all test requirements specified to the gasket samples supplied. 12.4.2 Tests shall be performed each year on a gasket lubricant for certification, which shall be valid for one year provided there are no changes in the materials or process used in the manufacture of either the gaskets or the lubricant. 12.4.3 No gasket lubricant shall be used on concrete pipe joints meeting this specification without valid certification provided to the concrete pipe manufacturer. Source: ASTM C 497 Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile

Sample Certification from Fly Ash Supplier to Plant.

RCP and Precast RCB Products Need Certification Too Plant QC Plans Certified Material Certification Form 206 Notarized and Submitted with 1st Delivery Each Delivery Ticket is QC Stamped Applies to Pipe and Precast Box Culverts Applies to Incidental Precast http://www.dot.state.fl.us/statematerialsoffice/administration/resources/library/publications/certifications/sampleforms.htm

Sample Certification Form to be used for first delivery of pipe or precast box culvert to FDOT project. Subsequent delivery tickets shall have a QC stamp and will not require notarization.

Material Certification Summary Applies to all raw materials Applies to finished RCP or RCB Certifies compliance with FDOT and applicable ASTM / AASHTO criteria Adhere to certification requirements in FDOT Materials Manual Volume II, Section 6.2.7.4 (RCP) Volume II, Section 6.3.7.4 (Precast Box Culverts)