SLB Synchronization in H4 Beam (LIP - Lisbon)

Slides:



Advertisements
Similar presentations
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
Advertisements

J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
CMS Trigger Coordinator
CMS Trigger System J. Varela LIP/IST-Lisbon & CERN

O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, UPO Meeting, July 6, 2012 Trigger Performance and Strategy Working Group Trigger Performance.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
The CMS Level-1 Trigger: System and Operation Christian Hartl (CERN) on behalf of CMS SPG-ÖPG, Lausanne, 15 June 2011.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
The Run Control and Monitoring System of the CMS Experiment Presented by Andrea Petrucci INFN, Laboratori Nazionali di Legnaro, Italy On behalf of the.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
UCL Seminar, 16/2/07Costas Foudas, Imperial College London 1 Overview of the CMS Trigger and Plans for LHC Start-up Overview of this talk: Trigger Challenges.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
Collisions… … with “non-stable beams” maybe on Thursday –Got experts to converge on goal and how to do it … to check timing, using L1 = zero-bias seeding.
CMS101 Introduction to the CMS Trigger Darin Acosta University of Florida.
Motivation General rule for muon triggers: Never neglect a possible backup reduction factor. It will always come back to you. Even if RPC trigger works.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
W. Smith, U. Wisconsin, CMS SLHC EMU Upgrade Workshop, Jan. 8, 2008Introduction to CMS SLHC Triggers - 1 CMS Trig & DAQ for LHC Overall Trigger & DAQ Architecture:
P. Klabbers, U. Wisconsin, LECC September 2006 CMS Regional Calorimeter Trigger - 1 Integration of the CMS Regional Calorimeter Trigger into the Level-1.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
CMS Week Sept '07Leonard Apanasevich (UIC) Pedrame Bargassa (Rice) 1 Physics Priorities for Trigger Development Leonard Apanasevich (UIC) Pedrame Bargessa.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
First CMS Results with LHC Beam
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
RPC Simulation software Raffaello Trentadue. RPC Digi producer RPC Digitizer RPC Synchronizer RPC Simulation model Average model Parametrized model Parametrized.
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
W. Smith, U. Wisconsin, ATLAS-CMS SLHC Workshop March 21, 2007 CMS SLHC Trigger - 1 CMS SLHC Trigger Wesley H. Smith U. Wisconsin - Madison ATLAS-CMS SLHC.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
TWEPP, Prague, Costas Foudas, Imperial College London 1 The CMS Global Calorimeter Trigger Test Results and Commissioning Overview: Brief Description.
AHCAL Beam Interface (BIF)
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Preparation of LHCb for data taking
CMS Trigger Coordinator
CMS SLHC Calorimeter Trigger Upgrade,
Calorimeter Trigger Synchronization in CMS,
Regional Cal. Trigger Milestone: Major Production Complete
ATLAS-CMS SLHC Workshop This talk is available on:
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
Project Presentations August 5th, 2004
The CMS muon system performance
Global Trigger and Global Muon Trigger
Global Trigger Finds Correct BX
Plans for the 2004 CSC Beam Test
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

SLB Synchronization in H4 Beam (LIP - Lisbon) 55 () 60 62 () 56 54 63 64 59 58 TT SPS beam intensity histogram SLB bunch crossing occupancy histogram Validated!

Trigger in MTCC Major success! 25 million events at a trigger rate of ~ 200 Hz Mixture of DT, CSC, RBC, RPC-TB, HCAL-RCT trigs. Trigger requirements easily configurable Stable operation Stable run uptime > 1 hr many runs > 500K L1A. All subsystems synchronized Tracker, ECAL, HCAL*, RPC*, DT*, CSC* Readout & Trigger* Trig. throttling worked Even when trigger problems or noise > 1 kHz Impressive teamwork!

Results from MTCC Phase 2 HCAL-RCT Trigger in time w/DT Drift Tube Trigger vs. Calorimeter Trigger time in 25 ns bunch crossings (coincidence = 0 bx)

Selected MTTC Muon Trigger Results: Extrapolation of DT to CSC Validated! & Relative CSC  DT timing checked

Event display of DT & RPC

Trigger Installation in USC55 Regional Calorimeter Trigger: 18 crates RCT Crates installed in 10 Racks 10 crates have all tested cards installed 6 Global Cal. Trig. Crates also installed Cables connected to ECAL, HCAL, GCT Most other trigger systems have crates & cards installed Integration “pattern tests” underway

Global Calorimeter Trigger: First Phase Trigger installed in USC55 3 Jets Leafs Wheel Concentrator Wheel 3 Jets Leafs e/ Leafs Source Card Source Card Leaf Card Source Card Source Card Concentrator Card GTI Source Card Source Card Leaf Card Source Card Source Card 18/63 Source cards 1/8 Leaf cards 0/2 Wheel cards Proto/1 Concentrator Source Card Source Card 31 Source Cards 32 Source Cards