Ralcorp Frozen Expire Logic September, 2013. Agenda 2 SectionsPresenter BackgroundDavid Friedli Picking Functions Expiration Functions Distressing Functions.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Slide#: 1© GPS Financial Services Revised 02/04/2009 Cougar Mountain Software Professional Version Cms 2 X tm Price: Call $$$ (generous discounts.
Using the Palm Pilot for Data Collection. Overview: These procedures will assist when using the Palm Pilot for: Physical Inventory Counts Bar Code Collection.
Advanced Piloting Cruise Plot.
Inventory Systems for Dependent Demand
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Determine Eligibility Chapter 4. Determine Eligibility 4-2 Objectives Search for Customer on database Enter application signed date and eligibility determination.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year-end Planning Key Changes Accruals Receiving P-Cards Roles/Responsibilities Handout Year-end calendar 1.
Auto Quick-Buy. Overview: Based upon the use of system flags, a complete ordering process will be automated as follows: sales order lines automatically.
Proud Members of the Consulting Group, LLC
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 10 The Order-to- Cash Process: Part I, Marketing and.
Course Objectives After completing this course, you should be able to:
Chapter 6: Integrated Processes
07/30/ ODE, Office for Child Nutrition Completing Commodity Orders.
1 How to Enter Time. 2 Select: Log In Once logged in, Select: Employees.
Chapter 6 Computer Assisted Audit Tools and Techniques
1 CIFTlab1.2 Software for Clinical Diagnostic Laboratories 1.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Housekeeping in Shoper 9 POS February 2010.
Company Confidential © 2012 Eli Lilly and Company Beyond ICH Q1E Opening Remarks Rebecca Elliott Senior Research Scientist Eli Lilly and Company MBSW 2013.
Ultriva Users Conference 2012 RTS And Pick List Presented by Nandu Gopalun.
ABC Technology Project
Weekly ACT Suit Reconciliation Interface ACT User Meeting June 23, 2011.
Inventory and Warehouse Processes. Slide 2 Introduction Inventory and warehouse management are closely related to the fulfillment and production processes.
Chapter 3: The Procurement Process
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
R12 Assets A Look Inside SM. Copyright © 2008 Chi-Star Technology SM -2- High-Level Overview R12 Setups –Subledger Accounting –ADI Templates –XML Reports.
KDE GL UTILITIES FOR THE CHART OF ACCOUNTS MIGRATION Kristin Lambert – OET.
VOORBLAD.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
Unicel DxH 800 & Unicel DxH SLidemaker Stainer Overview
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 How Do I Order From.decimal? Rev 05/04/09 This instructional training document may be updated at anytime. Please visit and check the.
1 RF Physical Inventory A New Method of Counting, Auditing and Reconciling XA Physical Inventory with Materials Management.
GL Interfaces 1 Using General Ledger Interfaces The File Maintenance and Procedures to successfully use the General Ledger Interfaces Jim Simunek, CPIM.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
School Census Summer 2010 Headlines 1 Jim Haywood Product Manager for Statutory Returns Version 1.0.
GaBreeze Employer Website PSR Implementation and April Release Enhancements Flexible Benefits Training for Georgia Benefits Professionals April 2011.
Januar MDMDFSSMDMDFSSS
Week 1.
20&27 May Agenda 1.Highlight the difference between system flow of e- Invoice and paper invoice – 15 minutes 2.Demonstrate the operation procedure.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
12 January 2009SDS batch generation, distribution and web interface 1 ExESS IT tool for SDS batch generation, distribution and web interface ExESS IT tool.
PSSA Preparation.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
QAD Routings Implementation Sheri Forrest – RFBP Nadia Truxell – Logan Consulting.
IntelliTrack ® WMS An Overview and Approach Powerful, Full Featured, Affordable.
Presentation transcript:

Ralcorp Frozen Expire Logic September, 2013

Agenda 2 SectionsPresenter BackgroundDavid Friedli Picking Functions Expiration Functions Distressing Functions Hawk (If time permits) Q & A Discussion

Who is Ralcorp Frozen? A $1.1B Leader in Private Label Frozen Bakery Products –Cookies (#1) –Pancake / Waffle (#1) –Refrigerated Dough (#1) –Bread / Biscuits 3

Environment Overview 4 Lodi Seattle Delta Ogden Louisville 1 & 2 Chicago/ Downers Fridley Brantford Grand Rapids Forest Park Carrollton

Environment Overview MfgPro eb2.1 service pack 5.Net 2011 MSW/PSW vs Eagle Barcoding since 2009 Both Lot/Serial and Reference number is populated for FG and RM pallets 5

Personal Overview My Experience –12 years in Automotive with QAD –4 years in Food with QAD –30 years with ERP systems 6

Picking Function 7 We are having Customers reject shipments due to insufficient remaining shelf life Each customer can have different requirements Cant rely on fork lift drivers to pick qualified pallets and memorize all the rules Customer Service being impacted

Picking Function 8 Very first thing, smart lot numbers –YYJJJSPLN (132101A01) –Production Reporting application modified

Picking Function 9 Next modified Eagles PPK pallet pick option –Gen Codes Generated to restrict age of product being shipped By ship-to/product line By ship-to/marketing group By part number

Picking Function 10 –Modified PPK so the find function would only show pallets that qualify for the customer –Modified PPK so the find function by Lot –Also added warnings

Expiration Functions 11 So we have individual customers satisfied now How do we prevent shipping out of date product? We have: Dated Lot Code Shelf life in a custom table Want to use as much standard QAD logic as possible (item status, inventory status)

Expiration Functions 12 Two New Applications Run Nightly Looks at all ld_det records that are missing an Expire or Distress Date For Expire dates, we turn the Lot number into a date and add the shelf life. FYI, for distress dates, go thru the logic in the Eagle pick program and add the lowest MaxLife value to the Lot number.

Expire Functions 13 Run Nightly after Expire Date Calc Setup in batch for each sites needs Able to update the status of the inventory based upon a horizon (e.g. Expire all material with an expire date within the next 7 days) Able to enter a Reason Code and Comment into the ld_det table so can see why it is on Hold also updated so QA can manage reason code and comment for QA reasons. Ran for inventory with a Current status and changes ld_det to the new status (RCT-CHL created) (Runs thru CIM).

Expire Function 14 Plant has two primary ways to look at inventory

Expire Function 15

Distress Function Distress Function is for the material that can no longer be shipped to a standard customer Handle two ways –Have Distress date in the ld_det table, run Auto Expire Utility on this date (GOOD > HOLD-DIS) –Have Expire date, run Auto Expire Utility for all items that do not have a distress date (e.g. 30 days before expire) 16

Interface - DS1 (Data Source One) 17 Purpose –Home-grown tool for centralized maintenance of Raw, WIP, and Packaging items (QAD BPM handles FG items) –Centralized maintenance of Customers/Suppliers –Data flows from QAD thru Pro2SQL to SQL Data Warehouse to DS1 application back to QAD –CIM loads into QAD with auto- ing and auto-reprocessing of errors Frequency –Every 30 minutes Mechanism –SQL ODBCs to custom staging table in QAD along with an automated Cron job to load into QAD

HAWK 18 Purpose –Home-grown efficiency tool used for FG reporting and inventory transactions to avoid manual QAD data entry and other slow processes –Data flows from QAD thru Pro2SQL to SQL Data Warehouse to HAWK application back to QAD –CIM loads into QAD with mass auto- ing and auto-reprocessing of errors –To date, 5.0 million loads completed in QAD (now averaging 170k QAD loads per month) –9 transaction types: BKF (backflush), WOR (work order receipt), PDL (pallet delete), PMV (pallet move), POR (purchase order receipt), CYC (cycle count)

HAWK 19 Production Reporting –Hawk (7 Plants) Runs regionally on SQL servers Reports Sub Assemblies and Finished Goods –Can be used with Repetitive and Discrete Orders –Collects/Uploads production within seconds to QAD –Creates Pallet Labels for Eagle/Inventory If QAD is down, still collects production and prints

Hawk – Front End 20

Hawk – Back End Back End is in QAD Custom Table and Utilities Upto 10 transactions/second capability Sends s on errors Serves as interface to multiple external applications –Hawk –PO receipts at external sites –Cycle Counts by external sites 21

Hawk – Back End 22

Hawk – Back End 23 Used in batch for each site Each site has its own processing queue Runs every 20 seconds Can setup to run all transaction types, or only specific ones if needed Each transaction type has a pre-cim validation If an issue, do not want to submit thru CIM, it will just delay 20 seconds Each transaction creates an (can be setup for P or E)

Hawk – Back End 24

Hawk – Back End 25

Hawk – Back End Reprocesses Errors Runs every hour Can run manually Can run for a single record Can run for entire site Can cancel a single record 26

Hawk – Back End Runs every 8 hours Does send out that errors still exist Purges old records based upon GenCode settings 27

Questions? 28