EFCOG Startup and commissioning task team introduction

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

Not to be Considered as a Regulatory Submittal Pre-Decisional DRAFT 19438_1 Preferred Alternative Recommended by Core Team Environmental Impact Statement.
Project Scope Management
Roadmap for Sourcing Decision Review Board (DRB)
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
ESTATES SERVICES Soft Landings – An Introduction 2013.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
© Grant Thornton UK LLP. All rights reserved. Review of Sickness Absence Vale of Glamorgan Council Final Report- November 2009.
BIM Sarah Birchall and Jo Harris 25 th September 2014.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Presentation on recent IAEA activities on RWM Y. Kumano WES / NSRW
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Heat Network Partnership
S/W Project Management
Magnox Swarf Storage Silos Programme Decommissioning Delivery Partnership Requirements February 2014 Gavin Askew.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
ISO OPERATIONAL CONTROL
Tom MAZOUR IAEA, Division of Nuclear Power
IAEA - Department of Nuclear Safety & Security
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
THERMODYNAMICS What the high school science student should know to better understand nuclear energy Fred Gunnerson, Ph.D. University of Idaho
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
How the NCSX Project Does Business
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
Project Delivery Working Group FY2016 EFCOG Annual Meeting Robert P. Miklos Idaho National Laboratory Battelle Energy Alliance Working Group Chair June.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
EFCOG Startup and Commissioning Task Team Introduction
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Software Quality Control and Quality Assurance: Introduction
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Bradley Smith February 28, 2017
Data Architecture World Class Operations - Impact Workshop.
Readiness Review Course
Software Configuration Management
The EM/HQ Perspective on Readiness Review
Software and Systems Integration
EFCOG Startup and Commissioning Task Team Introduction
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Enterprise Content Management Owners Representative Contract Approval
Management Breakout: MREFC Budget Summary Victor L
Advanced Design Activities in US
Controlling Project Cost and Schedule
Preliminary Project Execution Plan
Presentation transcript:

EFCOG Startup and commissioning task team introduction Allan Exley February 28 ,2017

Education and Experience Electrical and Electronic Engineering – Sheffield Polytechnic - 1982 Strachan and Henshaw – 5 Years Lead commissioning Engineer Fuel Handling Machines, Fuel Handling Facility, Sellafield, UK, Lead Commissioning Engineer, Torness NPS, Fuel Charge Machine, Torness, UK British Nuclear Fuels – 13 Years Area Project Manager, South Dissolver Refurbishment Project, Sellafield, UK. Role included control systems commissioning lead. Client Project Manager, Waste Treatment Complex, Sellafield, UK. Also served as the Commissioning Manager and role evolved into Plant Manager during hot commissioning phase into steady state operations.

Education and Experience BNG America – 5 Years Commissioning Manager, Advanced Mixed Waste, Treatment facility, INL, Idaho. Managed Construction completion and closeout Responsible for Plant, Personnel and Paper ORR’s in Retrieval, Characterization and Main Processing Facilities’ Ground breaking to hot operations in 4 years, no DOE pre-start findings. BBWI Advanced Mixed waste Facility – 2 years Production Operations Manager, Senior Technical Advisor, Strategic Planning and Integration Ramp up from Authorization to operate to full production in one year

Education and Experience Energy Solutions/Atkins/WRPS – 9 Years Project Director - GNEP, Light water Recycling Centre, Conceptual design Manager Developed conceptual design for the recycling Facility, High and Low Level solid and liquid waste treatment, MOX fuel fabrication and all supporting facilities WRPS Design and Operability Review Team Manager Managed DOE Team Reviewing Design and Operability of WTP HLW and LAW facilities WRPS One System Commissioning Integration Manager Develop Documents and processes to support integration across contractor Interfaces LAWPS Commissioning Plan, Operational Readiness Support Plan, Common CRADS. Development of operations research models

Potential Gaps, Needs, Concerns. Lack of developmental guidance for commissioning documentation e.g. commissioning plan. DOE O 413.3B - specifies requirement but does not prescribe scope or content, refers to 1189-2008 which does not address either the need for or scope of a commissioning plan or process DOE G 413.3-16A – Provides overview discussion but references Portland Energy Conservation Inc. model, which lacks context for Nuclear Facility Commissioning. DOE-EM-SRP-2010 – Provides performance objectives and review criteria but lacks developmental guidance, can be used in reverse to help guide content. Limited guidance on Pre-operations scope and when operating funds can/should be used prior to CD4. No agreed authoritative source of definitions exists for Commissioning activities Startup, Cold Commissioning, Hot Commissioning Active Commissioning Hot Operations

Potential Gaps, Needs, Concerns. DOE O 425.1 identifies core requirements but readiness would be more appropriately achieved and validated by functional area Availability of benchmarking information on past project, including cost, resource requirements and schedule for, discrete commissioning activities, rework, commissioning documentation preparation etc. Guidance on commissioning process is absent e.g., with no analogues to USACE UFGS-01 91 00.15 Total Building Commissioning, ASHRAE standards and guides Guidance on Commissioning/Readiness throughout the project beginning at conceptual design is lacking Some DOE guidance appears to consider achieving and validating readiness as a separate effort rather than an integral part of commissioning.