A. Kaminskiy, CMS Tracker week , Apr 2004

Slides:



Advertisements
Similar presentations
TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Manuel FahrerCMS Week TB Meeting /6 1-Shot Test Beam CERN CMS: M.Huhtinen, R.Hammarstrom, A.Macpherson CERN ATLAS, PS, Karlsruhe CMS  Overview.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
UCSB Hybrid Bonding & Testing
UCSB Testing Status Anthony Affolder
Hybrid & Module Testing Status
UCSB Testing Status Anthony Affolder
Executive summary from Bonding WG Meeting 21 Oct 2003
UCSB Short-term Testing Plan
Hamburg Bonding Report
Results from module testing
Unexpected Failures of Modules on Rods
Overview Time structure of leakage currents
UCSB Testing Status Anthony Affolder
Module Failures on RODs
FNAL Module Testing Status
Module Production Status in Florence
On behalf of the US TOB testing group
CMS Perugia Modules Production Review
First Assembled Rod in US
STAR TOF MRPC Mass Production & Q.C. (USTC)
Module production in Italy
UCSB Short-term Testing Plan
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
Hybrid & Module Electrical Testing
CMS Perugia Gantry Status Report
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
Anthony Affolder UC Santa Barbara
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
US Module Testing Progress Report
Status of 44 ARCS tested TOB modules, June 24, 2004
A. Kaminskiy, CMS Tracker week , Apr 2004
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
US Module Testing Progress Report
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

A. Kaminskiy, CMS Tracker week , Apr 2004 Current status 110 modules received from Gantry center (Perugia) 66 L34 and 48 L12 Phi see http://sirad.pd.infn.it/CMS/modprod +18modules just arrived 2 ARC setups ARC+DEPP+LED for module qualification ARC+DEP for arrival test LT setup CAEN 1527crate, 12chn HV board with 2na current resolution UPS, Torino interlock board, dry air Independent HV and Temperature/Humidity monitoring, online data are at http://sirad.pd.infn.it/CMS/modtest/logs A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Website A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Bonding Bonding Machine – K&S8090 In very beginning we suffered from the bad module carriers, then the carrier quality was improved. No problems bonding L34 modules First 10 modules L12 have loop higher then specified, but still acceptable We are still optimizing bonding parameters for L12 modules We can bond easily microbond 10 mods/week as well as 20 mods/week if all the modules if the modules are similar one to another. A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 L34 modules (4 chips) Received 66 Bonded and ARC tested 65 64 good modules 1 module goes to breakdown (some lithographic defect which almost shorts BiasBing with GuardRing). 1 module is unbondable (PA pads are contaminated) 2 Modules draw ~2uA, but without CM noise LT tested modules: 40 All LT tests before ~1st of March are cancelled No module related “surprises” from LT test Few modules has some defects on the surface caused by the peak-up tool. A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Mod#33162(L34) Chan# Peak Off Peak On Dec Off Dec On 9 ???? ????2 NOIS NOIS 276 SHT+ SHT+ SHT+ SHT+ 277 SHT+ SHT+ SHT+ SHT+ 278 ???? ???? ???? PHL- 279 ???? ???? ???? ???? 280 SHT+ SHT+ SHT+ SHT+ 281 SHT+ SHT+ SHT+ SHT+ 385 NOIS NOIS A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 L12 modules (6chips) L12 Modules Received 48 Completely bonded and ARC tested 28 LT tested 6 IV problems: 2 modules 1 module have avalanche breakdown at 380V-420V 1 module drew 10uA at 30V, but it improved after conditioning, now it draws 4uA @400V Several modules with “Resistive” IV Several modules with “unexpected” pinholes A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 IV (Mod #33261 #33230) A. Kaminskiy, CMS Tracker week , Apr 2004

Mod #33232: unexpected pinhole A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 LT test : noise jumping In consecutive measurements the noise of coupled chips jumps up and down A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 Leakage current at 450V A. Kaminskiy, CMS Tracker week , Apr 2004

Bad channels per module Overall satistics for 92 modules OPEN+ 12 OPEN- 15 NOIS 43 SHORTS 6 PHs- 4 ???? 10 ---------------- Total 90 VPSP not always optimal If chn is open, the neighbor(s) are probably noisy A. Kaminskiy, CMS Tracker week , Apr 2004

About 100 modules are bonded/tested. Conclusions About 100 modules are bonded/tested. Module assembling quality have been improving Planned production rate (20 modules/week) has never been achieved. Since 15 Jan we produce 8-10 modules per week Microbonding is not very time consuming Only if modules are perfect But it was at very beginning, while we did many intermediate tests 2 ARC systems are enough 1 ARC frontend board was broken. It took 3 days to substitute it, thanks to Aachen people. LT test seems to be a bottleneck, if we continue to test 72h/6modules . We have now all necessary software tools. A. Kaminskiy, CMS Tracker week , Apr 2004

A. Kaminskiy, CMS Tracker week , Apr 2004 P.S. Online root browser Open http://sirad.pd.infn.it/CMS/modprod/cms_prod.php Click on module ID Click on button on the right of the root file Follow the links A. Kaminskiy, CMS Tracker week , Apr 2004