ATL-IC-ES new version available - approval starts

Slides:



Advertisements
Similar presentations
FDR 10/01 Jason Tarrant CLRC1 SCT EC Thermal Enclosure (TE) l Thermal Enclosure Function: »Make End-cap thermally neutral »Condensation free exterior »Containment.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
A.Nichols CLRC1 SCT HEX PRR ( ) Layout & Installation of Barrel off-detector HEX circuits From barrel cooling loop to PPB1 l Barrel Hex is a plain.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Engineering Technology Division
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Barrel SCT Material Budget By Alessandro Tricoli RAL ATLAS Physics meeting, 18 th March 2008.
Vacuum system.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
LiH Casting & Testing1 Lithium Hydride Disc Casting & Testing Approaches C. M. Lei March 2, 2007.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
ITAR Restricted Data THEMIS Power Subsystem CDR Peer Review 6/14/04 Probe and Probe Carrier Harness Dave Manges (301)
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
ATLAS Pixel Detector September 2003 Services E. Anderssen LBNL Service Connectivity from Module to PP1b Eric Anderssen LBNL Pixel Services Meeting, CERN.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
1 PST Heaters 4 panels per segment along pixel support tube. Each segment is 236mm long at the moment. Copper-on-kapton. Nominal 20 ohms per full panel.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
August 04 Jason Tarrant CCLRC1 SCE EC Design & Manufacture l Progress of SCT EC »Support Structure (Required for Disc Assembly 2004) »Services (Required.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
Grounding the Electrical System Reference: AAVIM “Electrical Wiring” Created May 2007.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
5 November 2002J.Pater - Systemtest Report1 Endcap Systemtest Current Grounding/Shielding status Recent Upgrades to sector Measurements with 6 Modules.
ATLAS Internal ID Service Integration
Grounding the Electrical System
Status of GASPARD mechanics
Double Star: Table of Contents
Double Star: Table of Contents
End-cap Mechanics FDR Overview of the Project
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Cooling pipes and Space for Services
Meeting on Services and Power Supplies
Services Layout – Update
Grounding the Electrical System
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Hybrid Mechanical/Thermal Design ideas
Compilation of Dis-/Advantages of DC-DC Conversion Schemes
CONDUCTING Materials.
Grounding, Power Distribution
Development of Reference Geometry DB of ATLAS Detector Reproduction of Inner Detector Kobakhidze Shota 25/04/2019.
Presentation transcript:

ATL-IC-ES-0011 - new version available - approval starts Grounding of the ID subsystems Jan Kaplon ATL-IC-ES-0011 - new version available - approval starts 11/17/2018

ID GND – connection to ATLAS GND Two connection points on ATLS support structure: IDGNDPA and IDGNDPC Exact location to be confirmed by George Blanchot 11/17/2018

Connection to ATLAS GND system Two connection points: IDGNDPA and IDGNDPC on side A and C respectively 11/17/2018

Grounding principles Subdetectors are electrically independent (floating power supplies) except the IDGND connections All connections to the IDGND from subdetectors are from EM shields (TE) analogue and digital gnd referenced on the detector modules module ground connected to the individual EM shield Routing of ground cables – sector 13A/tile finger gap 51*A and sector 13C/tile finger 51C * Updated in ATL IC ES 0011 recently (to copy with engineering drawings and inventory) 11/17/2018

Pixel detector – connection to IDGND Single point connection to IDGND of PST EM shield at PP1 11/17/2018

SCT – connection to IDGND Cable connected on the heat spreader plate (barrel) Break at ppf1 (EC) 11/17/2018

TRT – connection to IDGND 8 AWG grounding cable is available - ask for sample 11/17/2018

Barrel cable trays and conical plate barrel cable trays are connected to IDGND ring (electrical isolation from support structure sitting on LArg) conical plate elements and trays connected using cable bridges engineering drawing ATLICSPF 0035 11/17/2018

Barrel cable trays and conical plate GND connection of IDGND ring (conical ring) in region of tile finger gap 51A and 51C cable trays connected by conical plates serve as an extra shield for pipes coming to barrel SCT and TRT (electrical breaks on ppb1) 11/17/2018

Routing of the grounding cables 11/17/2018

Grounding of the ID end plate Electrical continuity up to Tile structure – connected to overall ATLAS GND Check the possibility of the RF ground (Litz wires or solid bond connections) of IDEP cover plate to IDGNDPA and IDGNDPC or ATLAS support structure (recent request by N. Spencer) 11/17/2018

Cooling and gas pipes Inside EMI shields of a given subdetectors: grounding of the tubes provided by the sub-detector grounding schemes (electrical breaks before EM shields) Outside the sub-detector systems grounded at platform isolation from barrel cable trays (trays + conical plate connected to IDGND) TRT : kapton isolation for cooling, peek pipe for gas SCT: pipes in thermal isolation (electrical isolation) isolation from End Cap cable trays (trays are part of EM shields) TRT : peek pipes SCT cooling: wrapped by kapton sheet Support structures on LArg ()  isolated from LArg, electrical continuity to Tile structures (ATLAS GND) 11/17/2018

Cooling and gas pipes Details of PPB1 showing grounding of the pipes, location of the electrical break, and the reference point. Detailed grounding scheme of the TRT services. 11/17/2018

Barrel cable tray – isolation techniques Trays connected to conical plate and to IDGND 11/17/2018

EC cable tray – isolation techniques TRT: trays part of the TRT EM shields SCT: trays connected to relevant EM shields on ppf1 TRT and SCT EC cable trays need to be isolated – This includes also the PPF1 boxes (to be checked) Pipes have an electrical breaks before EM shields – need to be isolated 11/17/2018

EC cable tray – isolation techniques 11/17/2018

48V heaters 48V – PP1 connected to SCT base plate (barrel SCT ground) TRT heaters – the same scheme (2 particular SCT base plate connected to TRT ground (to be checked) ) 11/17/2018

110V heaters 110V heaters: grounded on power pack side +-55V cable shield (LEMO connector) bonded to the cooling pipe (heater body and pipe – electrical continuity to ATLAS GND) 11/17/2018

DCS items Readout by ELMB – isolated signal ground for ADC DCS items referenced by cable shields on given SCT PP1 Separate ELMB for the items referenced to different EM shields 11/17/2018

Aluminium-copper connection Tinned Copper Terminal and Jumper Structure Screw or bolt and nut plate Lock-nut Washer A Washer B Washer C Aluminum Alloy Stainless Steel Cadmium Plated Stainless Steel Stainless Steel or Cadmium Plated Stainless Steel Aluminum1 Alloy None 1.Use washers having a conductive finished treated to prevent corrosion (Alodine) Extracted from AC 43.13-1B document (could be found on http://atlas-id-grounding.web.cern.ch/ATLAS-ID-Grounding/ ) 11/17/2018