SENIOR DESIGN PROJECT SELECTION TOPICS: Draft Team Formation

Slides:



Advertisements
Similar presentations
RESEARCH PROPOSAL DR.URJA MANKAD.
Advertisements

IMS Systems Analysis and Design Communication and Documentation: Additional Notes on Written Reports.
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Technical Writing II Acknowledgement: –This lecture notes are based on many on-line documents. –I would like to thank these authors who make the documents.
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition Final Report – An Overview Week 4 Day 2.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2005 Final Report – An Overview Week 4 Day 2.
Report Writing Format.
9/8/ IENG 464 / 465 Senior Design Engineering Notebook Maintenance.
1 KEY PERSONNEL SUGGESTING FORMAT FELIX E.O OPATA MBA (STRATEGIC PLANNING & MGT.) BSC.HONS.(BIOMEDICAL SCIENCES) DIPLOMA MANAGEMENT (CAMB).
IENG 471 Facilities Planning
Designing Written Reports Presentation for Senior Design Classes by Dr. George Hayhoe Professor, Technical Communication Mercer University School of Engineering.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
1 Hair, Babin, Money & Samouel, Essentials of Business Research, Wiley, REPORTING AND PRESENTING RESEARCH Chapter 12 Learning Objectives: 1.Convey.
Efficient Meetings Cassandra Groen BSCE ‘09 MSCE ‘11 Research Engineer II Industrial Engineering South Dakota School of Mines and Technology Thursday,
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Work Day Check Robot Against Budget Work on Oral Report Work.
Lab Report Guidelines ELEC 302 Spring Basic Requirements Succinct and clearly written. Sufficient description to enable an engineer familiar with.
6/3/2016 IENG 471 Facilities Planning 1 IENG 465 – Final Design Project Report & Presentation Requirements.
Introduction To Engineering Bike Lab 1 – 4 Report Agenda: Lab Report Format Team Writing Outline Lab 1 Report.
Project Documentation Presentation Fall Outline Purpose Types of Documentation Individual Documentation Project Documentation Team Documentation.
INTERNATIONAL MARKETING PLAN 1. Title page: author(s), course name and number, date, and author’s address and phone number. 2. Research project checklist.
Community Resources Assessment Training 4-1. Community Resources Assessment Training 4-2.
THE FORMAL REPORT THE FORMAL REPORT. Definition and Purpose Definition: reports formatted in a professional way to emphasize its importance or recommendations.
Designing a Research Project
Lab Report Guidelines ELEC 313 Fall Basic Requirements Succinct and clearly written. Sufficient description to enable an engineer familiar with.
ChE 414 Chemical Engineering Laboratory II September, 2011 Instructors Glyn Kennell - Tuesday Naveenji Arun - Monday.
12/23/2015 IENG 471 Facilities Planning 1 IENG Lecture 11 Project Requirements & Project Data.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Final Report – An Overview Week 4 Day 2.
ECE791 Senior Design Experience Project Requirements and Timeline.
REPORTS.
Spring CS-EE 481 Lillevik 481s07-l2 University of Portland School of Engineering Senior Design Lecture 2 Technical staff Prototype phase: DEP, TOP.
2/10/2016 IENG 471 Facilities Planning 1 IENG Lecture 18 Project Selection, Report & Presentation Requirements.
First-Year Engineering Program 1 Lab Safety Policies Don’t stand on lab chairs Don’t sit or stand on lab tables No dangling jewelry or loose clothes. NO.
ECE 396 – Senior Design I Fall Semester 2013 Lecture 3 Documentation and the Design Process.
How to Write a Proposal. Contains title of project, name of recipient, proponent and date Includes partners of appropriate Title should be clear and unambiguous.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Last Day of Class – Spring Quarter Check Grades Turn in Project.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
Report Format 1st part Title fly Title page Letter of Transmittal
6/24/ IENG Introduction to the SDSM&T Six Sigma Green Belt Certificate.
What is PDF?  Each group is required to create a Product Development File (PDF).  The PDF is a series of documents that cover the entire history of the.
Project Report Format for Final Year Engineering Students.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Project Notebook & Brainstorming Sketches Week.
PG-26765: Culture and People
IMS Implementation Project
Preparation of the Self-Study and Documentation
Information Systems Project Management
Welcome To INTERNSHIP CLINIC
Welcome To INTERNSHIP CLINIC
ECE361 Engineering Practice
Technical Report Writing
TOPICS: Project Expenditures Project Accounting Project Budgeting
Tammy Custer Grant and Contract Officer
Group Report.
Team Project Step 1: Submit name of 3 organizations by next week (in class). I will select one for your team. Proposal format: Cover page-1p Brief Introduction.
TOPICS: Project Expenditures Project Accounting Project Budgeting
Advanced Techniques in Report Writing
Proposal & Leadership Documents
SENIOR DESIGN Conceptual Design Presentation TOPICS:
Title of Proposal in Initial Capital Letters: Times New Roman (18 point Boldface)
SENIOR DESIGN Introduction To Senior Design I, II TOPICS:
Writing Careful Long Reports
Team Project Step 2: Prepare a report containing:
Welcome To INTERNSHIP CLINIC
Design Report Submit one report per sub-team
Welcome To INTERNSHIP CLINIC
Formal reports are distinguished from informal letter and memo reports by their length and by their components. Though long reports can vary in format.
Long Reports Module Twenty Four McGraw-Hill/Irwin
The capstone design notebook
CIM Cooperative Work Program (COOP)
Presentation transcript:

SENIOR DESIGN PROJECT SELECTION TOPICS: Draft Team Formation IENG 464 / 465 FALL / SPRING 2015 – 2016 TOPICS: Draft Team Formation Safety Minor & Six Sigma Requirements Project Management Process Project Proposal Preparation SENIOR DESIGN PROJECT SELECTION

TEAM (Re-)FORMATION Get into project teams: Select a spokesperson: One team per table group Ideally four people per team (new teams) Select a spokesperson: Prepare to provide: Project Title Project Sponsor/Client Team Member Listing Brief Problem Description and Skills Required Team prepares a brief Project Proposal (1st Term) or a brief Implementation Plan (2nd Term) E-mail this to the instructor by 5:00 PM on the due date

SAFETY MINOR REQUIREMENTS Significant Safety Content If anyone on your team is working on the Safety Minor, the project must have significant safety content The team member(s) working on the Safety Minor must work on that safety content What to do: See Dr. Piper ASAP Fill out the paperwork (there is always more paperwork) 2nd Term – make sure that your Concept Design was approved for the Safety minor Do the design work Invite Dr. Kerk or Dr. Piper to the Conceptual Design Presentation Get feedback and adjust accordingly Do the implementation work Invite Dr. Kerk or Dr. Piper to the Final Results Presentation Graduate (hopefully) with a Safety Minor

SIX SIGMA CERTIFICATE REQUIREMENTS Six Sigma Project (IENG 463) requirements: DMAIC process is used DURING the project Stand alone project report is submitted for a LETTER GRADE Six Sigma Project Report: Report Structure: Cover Page Introduction & Problem Statement Headings for DMAIC Sections Recommendations, Conclusions and Acknowledgements References Appendices Report is due at NOON on Last day of Finals Week

PROJECT PROPOSAL PREPARATION Engineering Project Proposal Sections: Cover Page Executive Summary Introduction Problem Statement Constraints Scope of Work Deliverables Tasks Timing Budget Team Qualifications Team Members and Roles Summary of Team Qualifications Conclusions and Recommendations References Appendices E-mailed copy of the Project Proposal is due at 5:00 PM, 08 FEB

ENGINEERING NOTEBOOK Care and Maintenance Requirements

Engineering Notebooks Individual Responsibility Must be legally constructed Pages can’t be re-sequenced Missing pages are easily identified as such Must be legally documented Entries must be accurate Entries must be chronological Entries of importance should be witnessed Examples to document: Meeting times, places, attendees, topics Relevant phone conversations Relevant expenditures, mileage Design principles, concepts, sketches Engineering results, decisions, rationale Copies are placed in Project Notebook regularly 11/17/2018

Engineering Notebooks Engineering Notebooks are a permanent record for legal purposes Notebooks have a durable cover Pages are sewn or perfect bound (not loose-leaf or spiral bound) Entries are made with permanent methods Entries are made in sequential order & dated Errors are lined out, but not obliterated Loose material is attached within the notebook pages (if possible), or referenced within (if not) 11/17/2018

Using Your Engineering Notebook Blow-by-blow Documentation Corner of page Date & time Location Personnel present Title of task Experimental conditions, equipment ID numbers Blow-by-blow record of process Sketches of experimental setup / design Summarize major decisions / results Single line ends an activity, Double line ends day 11/17/2018

Eng. Notebook Entry Example 10/1/99 Team Mtg George, Jane, Judy (Elroy absent) 4:15 pm Clodfelter’s Bar & Grill Agenda: Refreshments Brainstorming Material Purchase Discussed cost vs. refreshment performance George presented analysis showing non-linearity at high $ end Decision to invent more effective beverage Brainstormed concepts Reduced water content Increased hops in raw stock Decision to invest in further research Planned expenditure of $25.00 Actual expenditure of $26.75 due to heavy tipping Refresh. Level Cost ($) 11/17/2018