SL026/17 – Product Acceptance

Slides:



Advertisements
Similar presentations
The RCP Health Research Support Service (HRSS) The approach to transitioning the HRSS Governance Framework : Presentation for the National Information.
Advertisements

EUCLID Student Award Processing Preview Demonstrations Student Systems Presented by Matthew Taylor Student Systems.
The key steps in an annual cycle Produce the annual work programme Create an annual Internal Audit plan for approval by the Audit Committee, typically.
5/9/2015TCB Council1 TCB Sharing of FCC KDBs Michael Derby TCB Council Chairman 9 th April 2014.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Introduction to Software Quality Assurance (SQA)
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Supervisor Guide. Logging in Click this button to be sent to the single sign on page. DO NOT use the local account log in below.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
The FA’s Online Safeguarding Service For Club Welfare Officers and Assistant Club Welfare Officers.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Display-wall Promotion. 25 x MicroTiles Displays – i.e (6 x 4 array offers 2.45 x 1.22m) (5 x 5 array offers 2.04m x 1.53m) (8 x 3 array offers 3.26m.
CLINIC-LAB COMMUNICATION Configuring 3Shape Communicate™
EIFL Licensing Training 2: EIFL LICENCE AGREEMENTS
Food Suppliers Implementation of EDI &PAV March 2010
The British Accreditation Council: ensuring standards
Doctorate extension scheme
World Health Organization
Software Quality Control and Quality Assurance: Introduction
ISO/IEC
The Five Secrets of Project Scheduling A PMO Approach
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Supervisors, Trainees, and Standards Rules
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Description of Revision
Rail Safety Worker Engineering and Design Competency
Outcome TFCS-11// February Washington DC
Next Steps Safety Standards Service V1.1.
CMMI – Staged Representation
HIGHLIGHTING THE KEY CHANGES
Outcome TFCS-11// February Washington DC
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
FTS2001 Transition Baseline Inventory Tool
The Learning Agreement, Intellectual Property Rights and Project Approval Professor Dianne Ford Director of PhD Studies, Faculty of Medical Sciences.
Employees’ Guide to Parental Leave
From AS :   Part 4— Commissioning, operation and asset management
SQA01 Guidance Material: FAI Review
New Equipment & System Approvals
SQA01 Supplier Guidance Material: Permission to Ship Forms
Just In Time Concepts & Review
TransformUs Programme
Project Management Process Groups
Project Management Scenario Overview
LO2 - Be Able to Design IT Systems to Meet Business Needs
2018 SMU Staff Performance Review Training
EER Assurance December 2018
XRN4361 – UK Link Release 2 - Delivery
TransformUs Programme
Learn and Share Attendee guide and template for presentation of improvements and innovations at the Emergency Care Improvement Group Meeting.
User Manual - Applicant
PSS verification and validation
Learn and Share Attendee guide and template for presentation of improvements and innovations at XXX Improvement Group Workshop.
Learn and Share Attendee guide and template for presentation of improvements and innovations at the Imaging Improvement Group Meeting.
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Supplier Briefing Pack
Learn and Share Attendee guide and template for presentation of improvements and innovations at XXX Improvement Group Workshop.
USF Research Integrity & Compliance
Learn and Share Attendee guide and template for presentation of improvements and innovations at HRT1916 Patient Safety Improvement Group Workshop.
Co-production: Enablement Tracking & Reporting
Alternative Testing.
That person will have been involved in the planning of the work.
Project Name Here Kick-off Date
OU BATTLECARD: WebLogic Server 12c
Presentation transcript:

SL026/17 – Product Acceptance Shared Learning SL026/17 – Product Acceptance 17-Nov-18

Background Experience has taught us a number of key lessons to enable successful introduction of new products to the rail environment and on changing the application of existing products to meet new requirements. The Product Approval Process (NR/L2/RSE/100/05 ) and Design For Reliability (NR/L2/RSE/0005 ) are key processes in enabling projects to achieve this successfully. The intent of this Shared Learning is to remind all our teams of the formal arrangements which lead to this success and where support and resources can be found. Links to all relevant standards and processes can be found on the Product Acceptance Website. 17-Nov-18

Background Projects need to consider the product acceptance status of all products to be utilised, during the development phases of the project. NR/L2/RSE/100/06 ‘How to Decide What Needs Product Acceptance’ is a useful reference if you are introducing new products. Plans shall be made to progress and monitor product acceptance of all unapproved products, or new or novel applications of approved products; to achieve full or trial certificates prior to commissioning. Equipment & Materials Acceptance Status Monitoring is a best practice process for this. Product Acceptance (PA) Certificates contain much useful information about the application and restrictions on the use of a product. They can be accessed using your authorised log-in to www.padsnet.co.uk or for Network Rail staff via Certificate Search . 17-Nov-18

Process Unless identified otherwise on the Engineering Compliance Certificate (ECC), the ‘Designer’ is confirming that all products referenced in the design have been used in accordance with the terms and restrictions on the Product Acceptance Certificate. All new products being introduced must follow the ‘Product Design for Reliability’ process defined in NR/L2/RSE/0005 (DFR Briefing). Sufficient time must be allowed in the programme to accommodate this process where new products are being used. The introduction of new products now requires a Network Rail Sponsor who takes an active role in the PA process. 17-Nov-18

Details The front cover of the PA Certificate contains overview information about the product, the scope of acceptance, the date the certificate is valid from and on trial certificates, an expiry date. Subsequent pages contain specific conditions applying to the manufacturer and user, trial criteria (where applicable), list supporting manuals and training material, hardware and software configuration and the certificate history. 17-Nov-18

Details The Modular Signalling concept and hence the products, take advantage of a set of agreed deviations which may not be appropriate to other applications e.g. reduced standby times, greater power supply variance etc. Most PA certificates for Modular Signalling products do not allow use on none Modular projects. The product variance from standard signalling products needs to be clearly understood by projects if they plan to use modular products in a non-modular application. Under certain circumstances some such projects have been added to the PA certificate, after following the PA process in NR/L2/RSE/0005. Guidance and support on this can be found on the Product Acceptance Website or for some items by the Signalling Innovations Group (SIG) contact SIG@NetworkRail.co.uk 17-Nov-18

Examples The PA Certificate for the SSI Long Distance Terminal (LDT) Filter LF02 states that “LF02 LDT Filters shall be used for all new installations requiring only current loop 1. LF01 LDT Filters will be used for all new installations that require more than one current loop.” Many projects are still installing LF01 LDT Filters in all cases. 17-Nov-18

Examples Clause 5 on the PA certificate for an Audible Warning Device for use at Level Crossings requiring Another Train Coming announcement, contains a requirements for designers to note. “The A105 sounder must not be used on an unsmoothed full wave rectified 24V supply. The effect of adding the sounder to this supply will increase the voltage beyond it’s 30V maximum. 17-Nov-18

Examples The PA Certificate for WAGO Terminal Blocks states that: A 5mm intermediate plate or the 1mm by 3mm tall intermediate plate (086/043050 or 086/043051) must be used between terminal blocks. Where the 1mm intermediate plates are used a 5mm end plate is still required. 17-Nov-18

Further Information For any further details or information please contact: Nicola Crocker, Programme Engineering Manager, Process & Capability 07733127167 Nicola.Crocker@networkrail.co.uk 17-Nov-18