MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
LHC Emittance Measurements and Preservation
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 18 October : Collimation system
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Wed :40 Lost S78 - QPS controller.
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Friday morning 10:30 Optics measurements and corrections.
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
MD#2 News & Plan Tue – Wed (19. – 20.6.)
IP8 aperture measurements (07:30-10:30)
Thursday – Morning Energy matching at injection with H CODs
MD Planning Fri – Sat (1. – 2.7.)
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann Machine Coordinators (last week): Gianluigi Arduini, Eva Barbara Holzer 3 December 2012

MD#4 Mon (26.11.) postponed (QPS access S6-7 RQF/RQD, Day Time v MP class MP Comments Mon 06:00 Ramp down if needed 08:00 450 GeV: IR8 aperture A 450 GeV Pilote bunches(1e10p/bunch) to measure aperture. 10:00 450 GeV: Beam instrumentation B BSRT vs WS, Schottky, WS PM saturation (partially done in MD3): B1: Pilot + 12b >=1.1e11p/bunch B2: Pilot + 50ns trains from 6 to 72 bunches Bumps at 450GeV and 4TeV Blow up with ADT 2) BGI, Gates BBQ, BSRT temperatures: 450GeV 50ns trains with minimum 600 bunches Bumps in B2 +- 3mm Gating with ADT off on some bunches 3) BPMs: Done in MD3 4) Matching: Probe from 1 to 5e10p Inj, circulate (~100 turns) and dump (More details see slides ) 16:00 450 GeV 4 TeV: p-Pb test C From MD2 preparation: 450GeV and 4TeV Bunches of ~1.5e10p/bunch and >5e7Pb/bunch B2: few proton bunches and few Pb bunches B1: > 300 bunches with 10% ~1.5e10p/bunch, later with higher intensities. Test RF re-phasing procedure. Squeeze sequence and collisions. (More details see slides) postponed (QPS access S6-7 RQF/RQD, MKI2 fault in softstart, dump line vacuum); rescheduled as Operational Dev. & successful BPM studies and beam excitation, … 24 p batches from the SPS posed problems

MD#4 Tue (27.11.) successful! successful successful successful Tue Day Time v MP class MP Comments Tue 00:00 Ramp down 02:00 450 GeV 4 TeV: MQY transfer function A 4 TeV. Pilote bunches (1-3e10p/bunch). Standard optics measurements with different MQY transfer funtions. 06:00 08:00 450 GeV: RF study (longit. stability for batch or RF voltage modulation) B 450GeV A few nominal batches of 144b. RF Voltage modulation: fill half of the ring, to test the corrected algorithm of voltage set point adjustment Longitudinal stability: Full ring with max. bunch intensity. Excite a single mode in the beam with decreasing gain in the feedback loop. (More details see slides) 16:00 450 GeV: beam-beam (noise or impedance) C 450 GeV In total 9 bunches per beam with different intensities (from 1e11 to 2e11), zero crossing angle in IP1, IP2 and IP5. Nominal crossing angle in IP8. Collision tune, Damper (ADT) off Introduce increasing noise with ADT Increase ADT gain in steps Scan separation in IP1 and 5 with 4 bunches (from 1e11 to 2e11) with damper of. 22:00 450 GeV 4 TeV: Collimation impedance & follow up from last MD 4 TeV ~3b (1.3e11p/bunch) below SBF Alignment of collimators Impedance studies with tight collimator settings and moving IR7 collimators back and forth. successful! successful successful successful

MD#4 Plan Wed – Thu (28.-29.11.) successfully executed - Day Time MD MP class MP Comments Wed 04:00 Ramp down 06:00 450 GeV 4 TeV: two –beam impedance C 4TeV, squeeze to beta*=1.5m 150 bunches per beam (nominal filling scheme) Move beam 2 clockwise Reduce octupole currents in 5 different configurations (0 turn, ¼ turn, ½ turn, ¾ turn and 1 turn cogging) (More details see slides) 14:00 16:00 450 GeV: transverse impedance localization at injection 450GeV 8bunches with different intensities, equally spaced (5e9 … 1e10 … 5e10 … 1e11 … 1.5e11 … 2.2e11) Create kick with AC dipole or kicker Tune shift 2.1e-3 Move TDI Parallel measurement with ADT? (More detials see slides) 18:00 450 GeV: TCDI automatic setup A 450 GeV Pilot bunches (1e10p/bunch) 22:00 450 GeV 4 TeV: bunch flattening with RF phase modulation B 450 GeV and 4TeV Nominal LHC beam, i.e. 1374b per beam Add flattening signal (sine-wave close to the synchrotron frequ.) The MD will have ramp and all steps before physics. Measure effects of heating and transv. Instabilities. Thu 02:00 End of MD#4 full cycle with 3 nominal bunches 07:30 450 GeV: IR8 aperture 10:30 Access successfully executed - →new questions & theories successful successful successful successful!

IR8 aperture measurements M. Giovannozzi, S. Redaelli, J. Wenninger Measured IP8 aperture to determine possibility of having vertical external crossing angle bump from injection to allow polarity switch also for 25 ns beams. Data being analyzed. LHC Morning Meeting - G. Arduini

BI MD 50-Hz and 8-kHz investigation using BBQ Aim: check if small fault currents passing along vacuum chamber can induce 50 or 8 kHz beam oscillations; two taps on B2 vacuum chamber right of P4. Distance between taps ~10 metres. Maximum current ~50 mA rms (tbc). Result: Exciting on off- and on-resonance of horizontal tunes → signal levels similar to those generated by 50 Hz lines. Marek Gasior, Ralph Steinhagen excitation on tune resonance, 3120 Hz off-resonance excitation, 3090 Hz w/o excitation MD block 4

BI MD – BPM studies Effect of crosstalk at striplines (overlapping and not overlapping bunches) with different ratios of beam intensities and with a cogging of B2 phase Testing interlock behaviour in high sensitivity mode. In B2 reflections not observable anymore for 1.3e10p/bunch at high sensitivity. start scraping first beam 1 and then beam 2 ; at the end switching to high sensitivity

BI MD – new filling scheme for p-Pb MD 200ns_4Pb_318p_24b14bpi lead in B1 and protons in B2 at the end of BI MD switched machine to ion-proton physics; hypercycle changed at flat bottom and RF settings changed

p-Pb MD – ion beam first Pb beam in LHC large difference in the SPS probably comes from the tune difference (0.13 for p, 0.3 for Pb); the difference was corrected in the line second Pb bunch in after moving the buckets by one unit BLM spurious trigger in IP5 dumped the beam bunch length evolution

p-Pb MD – proton beam first p beam in LHC ring 2 p orbit without OFB correction & p tunes w/o correction SPS ready with 200ns batch cycle. First 24 p bunches dumped because of beam losses in IP7 due to wrong ADT settings (B1/B2 swap). On next attempt, 3 batches of 24 p bunches were injected, but when injecting 4th batch, interlocked BPMs triggered. Rest of the MD was spent on improving p beam in SPS.

MQY TF MD LHC optics team after MQY calibration early this morning (R. Tomas et al) LHC optics team after MQY calibration early this morning MD block 4

MQY TF MD – optics with new calibrations Optics measurements at injection and flattop with new MQY calibrations. First analysis points to improved optics. Afterwards measure detuning with amplitude at flattop. Detailed analysis off-line. phase beating error in IR8 (vertical) improved by factor 2

RF Study MD - voltage modulation (T. Mastoridis, J. Molendijk, P. Baudrenghien et al) Machine half full; adjusted phase of RF voltage set-point to minimize klystron power. With 1-T feedback ON algorithm was not converging for 2 out of 16 cavities, and converged set-point was not following beam loading exactly. Working with 1-T feedback OFF resulted in excellent performance. (Preliminary) conclusion: Smoothing" algorithm works fine with 1-T feedback OFF. Interplay with 1-T feedback to be understood. phase modulation of set point Cav5B2 klystron average power: drop at 11:58 (B1) & 12:02 (B2), when adaptation was switched on 28-11-2012 MD block 4

RF Study MD - longitudinal stability in batch mode (T. Mastoridis, J. Molendijk, P. Baudrenghien et al) Excited longitudinal coupled-bunch dipole modes of order 1, 3, 4 and 13, while reducing gain of RF feedback around cavity by 3, 9, 15 and 18 dB and while rotating the RF feedback phase by 5 and 10 degrees. The 1-T feedback was off. Beam remained stable in all settings. Conclusion: impedance of RF cavities at fundamental frequency is reduced to level compatible with at least 10x present beam current at 400 MHz. Detailed analysis will yield damping rates and cross-check MD block 4

Beam-Beam & Noise MD collision tunes, Q’~2 units (X. Buffat, W. Hofle, T. Pieloni, ++) collision tunes, Q’~2 units calibrated ADT noise amplitude w 1 bunch in B1 (V) 1 pilot & 3 bunches of different intensity (1E11, 1.5E11, 2E11) lack of lumi signal from ATLAS → collided only in IP5 with ADT off, white noise was introduced in steps on B1V; WS measurement indicated different behavior for different bunches, t.b.c. offline in particular, significant losses and emittance growth on bunch with highest beam-beam tune shift at the end, recovering lumi signal from ATLAS, collided in IP1 as well, and repeated noise level scan turning on ADT seemed to lower emittance growth MD block 4

Collimator MD – loss maps on the ramp Beam 1 2 TeV Beam 1 4 TeV

Collimator MD - impedance (S. Redaelli ++) - collimators initially to nominal settings. - tried measuring Q’ with ADT off → instability (B1 H). - first tune shift measurement keeping the ADT on and leaving Q’ at physics settings → moved TCSG in IR7 back and forth (5.1 to 9 s). Tune shift to be analyzed offline (no clear signal online). - measured Q’ with ADT off → again several instabilities. Trimmed Q’ closer to zero, and kept ADT off. - second tune shift measurement: same TCSG IR7 back-and- forth movement, with ADT off. Again tune shift to be analyzed offline (no clear signal online). - finally, moved back-and-forth TCP from 4.2 to 6.2 s, with ADT off → again no clear signal online no clear tune shift when moving TCSG in IR7 or TCP

Collimator MD – impedance cont’d Q’ measurement: Q’=6, 0 B1 , then trimmed by -10, +2 Q’=0, 13 B2 , then trimmed by -10, +2 B1 instability with ADT off seen on BBQ Q’ at end of squeeze close to zero in B1V & B2H? Second tune shift measurement: TCSG IR7 in / out , ADT off Third tune shift measurement, moving TCP IR7 in /out with ADT off.

Two-beam impedance MD - conditions P. Baudrenghien, S. Fartoukh, E. Metral, A. Burov 78 nominal bunches (6+2*36), 1.5 E11, 1.5 micron emittance nominal squeeze down to 0.6 m RF cogging of beam2 at -12 Hz (10E-4 in dp), inducing clockwise rotation of beam2 (beam1 fixed). 4 cogging configurations: 0 turn (overlap in IR1 and IR5), 1/4 turn (IR2 only), 1/2 turn (no overlapp), 3/4 turn (IR8 only), 1 turn (back to 0 turn) in each cogging configuration, MO scan was performed, some with tune split: always moving the most stable beam down along the diagonal Result 1: cogging worked nicely, even in presence of moving LR encounters at full intensity (1.5 E11) & 9 sigma normalised crossing angle in IR1 & IR5

Two-beam impedance MD – 2nd result P. Baudrenghien, S. Fartoukh, E. Metral, A. Burov cogging (turns) common IR int. (av. b1/b2) [1e13] MO thr. [A] gain from tune split 1 & 5 1.15 400 -100 A (B1: -0.005,-0.005) ¼ 2 1.05 200 small effect ½ none 1.00 150 - (not tried) ¾ 8 0.95 100 1 always stable (scanned 520 to -520 A; also changed Q’ by +10 ) 1+1/2 0.85 still rock stable MD ruled out scenarios were stability would be explained by negative Q’ or by LR tune spread hypothesis: Landau damping from longitudinal plane

Two-beam impedance MD – more results line 2*Qy (actually 1-2*Qy) systematically observed in the presence of instabilities regardless of the cogging configuration, i.e. with *and* w/o LR beam-beam possible explanation (to be confirmed off-line): this line reflects beam response to machine nonlinearities, further amplified by tune proximity to 3rd order resonance after the first step of the squeeze (so coupled to Qx and actually found to be moving when trimming Qx), but also and mainly beyond the ADT tune window:.. so coherent mode (m=0) possibly undamped at this frequency ?? in general: Two-Beam-impedance effect seems to be excluded. In the presence of LR beam-beam the situation seems to get worst. There is a source of Landau damping which is strongly suspected in the longitudinal plane. Machine (and LR) nonlinearities certainly add frequencies to the beam spectrum (m*Q1+n*Q2); “for some of us, the behaviour of the ADT is not clear under these conditions”

Two-beam impedance MD – illustrations instability signals during the MD B2H B1V

Two-beam impedance MD – illustrations e-cloud effect? B1 emittances after 1-turn cogging (~11:16); blown up everywhere, especially in the tails 14-09-2012 Outline of MD block 3

Two-beam impedance MD – illustrations effect of nonlinear pickup? (Gianluigi Arduini) 1-2Qy

Impedance MD – Transverse Localization B. Salvant, N. Biancacci AC dipole kicks on high intensity bunches ADT & octupoles off, increase Q’ for better beam stability measurements with TDI close to the beam & TDI at 30 or 31 mm, mostly on beam 1 due to fault on LBDS2 phase beating with intensity MD block 4

Injection MD – TCDI Automatic Setup Inj & dump for TCDI setup software (setup beam flag limit raised to 6e10p) pilot ; checked steering ; opened TCDI thresholds 3 scans with two different collimators in TI8 TCDI stayed once armed after the scan (not for the next scans) correct detection when beam is not extracted (collimator not moved) improvements: normalization to intensity ; zoom-in window ; automatic entry in logbook manual checks of automatic analysis results (1st scan only movement) 2nd scan: +/- 2 sigma scan window too small for good fit 3rd scan: automatic centre: -0.242 sig, manual centre: -0.236 sig not checked: automatic trim-in of new centres The application works correctly and can be used for the next setup! C. Bracco et al. 29-11-2012 MD block 4

Injection MD – injection matching monitor timing correct ; Al screen well centered intensity too low for OTR measurements (limited time prevented scraping high intensity bunch in the SPS down to below the limit of 6e10) C. Bracco, F. Roncarolo, et al 29-11-2012 MD block 4

RF MD – bunch flattening w RF phase modulation Test of phase modulation with individual bunches of different intensity at 450 GeV: difference in incoherent synchrotron frequency between low and high intensity bunches around 1 Hz. Effect of flattening observed through bunch phases and profiles. Successful test with nominal beam in both rings on flat bottom, effect observed on beam spectrum and profiles before and after application of phase modulation. Beneficial effect on ALFA heating also visible. Test of RF voltage reduction from 10 MV to 6 MV on flat top, no losses, but some transverse (B1V) activity could still be observed at end of squeeze; detailed analysis required for comparison w higher voltage case. Test of phase modulation with 10 MV in squeeze. When applied to B2 at revolution harmonics with phase loop on → bunch length variation around the ring was produced. Flattening of B1 was done with phase loop off and smaller amplitude. Heating in ALFA was significantly reduced for both beams. To be analysed for other equipment. At the end average BQM bunch length was 1.6 ns. During phase modulation of one beam, excitation could be seen on the other beam in the transverse (V) plane. Finally beam was dumped due to slow losses in Point 5

RF MD – bunch flattening w RF phase modulation J. Esteban, T. Mastoridis E. Shaposhnikova, B. Salvant, et al amplitude of phase oscillations spectrum before modulation spectrum after modulation 29-11-2012 MD block 4

RF MD – bunch flattening w RF phase modulation modulation in bunch length along all bunches of B2, following the RF modulation applied. J. Esteban, T. Mastoridis E. Shaposhnikova, B. Salvant, et al 29-11-2012 MD block 4

RF MD – effects of bunch flattening beam spectra: clear effect of RF modulation Roman Pot: temperature decreases after flattening bunches MD → very sensitive TDI: no change noticeable vacuum: VGI.210.5R6 quite high, tbc with vacuum experts BSRT: changes of T slope also indicate beneficial effect of flattening bunches MKI magnets: steady increase, difficult to see changes. MKI tube temperatures: steady increase. change of slope observed on MKI8C tube up temperature TCTVB.4L8 and TCTVB.4R8: temperature probes show clear correlation with bunch length. TCP.B6L7: no clear impact observed beam screens or Q6R5: Nothing special observed (except for usual noise between 3am and 4am), according to TE/CRG operator, to be confirmed offline

RF MD – effect of bunch flattening on BSRT

RF MD – effect of bunch flattening on ALFA RP Sune Jakobsen short short long long

RF MD – spectrum evolution during the MD 14-09-2012 Outline of MD block 3