Magdalena Kowalska, CERN PH-SME-IS

Slides:



Advertisements
Similar presentations
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Advertisements

Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
ISOLDE Yield Database Tania Melo Mendonca EN-STI-RBS.
ISOLDE Yield Database Development
Accelerator Schedules LHC and LHC Injectors Schedules MSWG meeting 16 January 2015 SPSC - 13 January 2015 Rende Steerenberg, BE/OP2 Rende Steerenberg,
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Spins, Moments and Charge Radii Beyond 48 Ca INTC-P-313 M.L. Bissell- On behalf of COLLAPS.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Nuclear physics: the ISOLDE facility
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
Richard Catherall EN-STI 2 nd February 2011 ISCC Technical Report & Report from the Standing Group for the Upgrade of ISOLDE.
24 January 2001J. Lettry1 ISOLDE Introduction –PSB-beam, Targets –Ion-sources Facility performance –Front-ends and robots –Target production –Safety.
Burnaby - Dublin - Freiberg – Manchester – Saarbrücken - ISOLDE Collaboration Spokesperson: M. Deicher Contact person: K. Johnston.
L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report INTC meeting, 15 February 2007 ISOLDE scientific coordinator’s report INTC meeting, 15 February.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
High-precision mass measurements below 48 Ca and in the rare-earth region to investigate the proton-neutron interaction Proposal to the ISOLDE and NToF.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Last years of the SC-ISOLDE and move to the PS-booster H. Haas CICECO, Universidade de Aveiro, Aveiro, Portugal and CERN/PH-IS, CH-1211 Geneve-23,
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
LIST status and outlook Sven Richter for the LIST-, RILIS- and Target-Collaborations 21 st of August 2013.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
AN INTRODUCTION Jaime Avilés Acosta. WHAT IS ISOLDE?  Isotope Separator On-Line DEvice  Dedicated to producing radionuclides  Applications in nuclear.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Schedule Access to the hall b508. Magdalena Kowalska.
January 30, 2007 CERN Resonant laser ion sources By V. Fedosseev.
PH Department News Discussion with management
Alexander Herlert, CERN (PH-SME-IS)
Richard Catherall EN-STI 2nd February 2011
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Beam developments in 2011 Target and Ion Source Development (TISD) Thierry Stora, EN-STI-RBS With input from many different colleagues.
First results from IS468 and further investigation of in-trap decay of 62Mn First results from 2008 ; Problems and questions ; Further investigations ;
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
Physics coordinator report: Overview of 2015
NA61 news and plans News from other labs/experiments
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
How to run ions in the future?
FEBIAD ion source development efficiency improvement
Alexander Herlert, CERN (PH-SME-IS)
Difficult beams accepted in 2014 (updated since last meeting)
A. Herlert, CERN PH-SME-IS
Masses of noble gases David Lunney CERN contact: Sarah Naimi, CSNSM
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
A. Herlert, CERN PH-SME-IS
Fixed Decay Station at ISOLDE
Thomas Nilsson, CERN EP/IS
Magdalena Kowalska, CERN PH-SME-IS
Mats Lindroos for The ISOLDE team
66th ISOLDE Collaboration Committee meeting
Coordinator’s report . Magdalena Kowalska.
Thomas Nilsson, CERN EP/IS
INTC matters . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator schedule 2011 Long shutdown (2012 or 2013) Status of ISOLDE experiments New ISOLDE web page Magdalena Kowalska, CERN PH-SME-IS

ISOLDE experiments and requests 2010 INTC February 2010 5 new experiments: IS499 – IS503 132 approved RIB shifts (out of 183 requested) 8 experiments completed (3 REX experiments): IS381, IS414, IS415, IS417, IS418, IS425, IS431, IS469 69 active experiments for 2010 beam period INTC June 2010: 34 HIE LOIs INTC November 2010 189 shifts requested in new proposals and addenda 21 shifts requested by LOIs

ISOLDE schedule 2010 (May 6 - Nov 21) ~29 weeks for physics vs 31 weeks in 2009 Requested shifts: 667 in total 93 different beams 627.5 for 50 experiments GPS HRS Scheduled shifts (~73%): 480 in total 75 different beams 443 for 41 experiments REX-ISOLDE: 432 shifts requested 160 shifts scheduled (~37%) 11 experiments (7 runs) additional WITCH runs (need REXTRAP)

Main problems in 2010 (I) TISD on Sm RILIS and target test: no laser ionised Sm visible SSP collections with YO HP target: Strong stable contamination, not much physics output, but promising yields of Fe and Cr beams GPS HRS YO CP target for 1st REX-ISOLDE run: 9C yield dropped quickly after start – run not successful – need target tests ZrO target with RILIS for Ga at COLLAPS: Target broken right before on-line run – cancelled WITCH run on Ta W target: Very contaminated rare-earth beam, but some recoil spectra (on mixed beam) could be recorded Miniball run on 72Kr from YO CP target: 10-fold yield drop within a few days, strong 72Ge contamin.

Main problems in 2010 (II) Pb HP target for SSP collections: GLM deflection plates blocked (broken pinion); no beam for users ISOLTRAP run with UC CP target: No 46,47Ar visible among very strong stable contamination of SC(H). No masses measured but multi-reflection isobar separator commissioned . GPS HRS 96Kr Minball run with UC CP target: many contaminants and weak Kr signal at Miniball but 96Kr E(2+) observed in 2009 confirmed 202Rn Miniball run: target broke in the middle of the run; only partial statistics collected 220Rn Miniball run: cancelled due to target failure during 202Rn run

Main problems in 2010 (III) 70-72Kr from YO CP target for ISOLTRAP: No beams visible among large Cl contamin. but more tests with multireflection isobar separator 30Na from UC W target to Miniball: measured yield and counts at Miniball much below database value. Beam given to next user. GPS HRS Mn beam for Mossbauer studies (UC Ta): GPS HV trips above 30kV (requested HV>50kV). Extraction electrode exchanged and 40kV allowed very good results. N-rich rare earths at ISOLTRAP (Ta W): no beam of interest found among stronger contamination. Another new mass measured. Tests of high-density UC target: GPS turbo fans go off. Pumps will probably survive only 3-4 days.

2010 online shifts Shift backlog after Feb10 meeting : 877 shifts Neutron doserate in Sv/h in ISOLDE HV room Ca. proportional to proton intensity at the target => Upper limit on online shifts delivered until November 1: 320-330 shifts Shift backlog after Feb10 meeting : 877 shifts Assuming that until end of 2010 we will have delivered around 350 shifts => Shifts remaining for 2011: around 530 + shifts approved in November => above 700 shifts to be scheduled

Accelerator schedule 2011 (draft) ISOLDE dates (still prelimin.) protons to ISOLDE April 25 physics start ISOLDE May 2 protons stop November 20 (i.e. 29 weeks for physics vs 29.5 in 2010) Shutdown period used for new GPS front-end Several 24h injector stops every 6 weeks. Several long periods of machine development partly with parasitic beam to ISOLDE (not guaranteed)

Long CERN-wide shutdown One year shutdown of CERN accelerator complex (to save money and manpower) planned for 2012 However: - LHC runs better than expected CERN/LHC competitor Fermilab might run after 2011 nobody is happy about the exact date of the shutdown It is very probable that shutdown is postponed to 2013, which will be better for ISOLDE and HIE-ISOLDE. (Decision will be taken in late spring/early summer 2011.) ISOLDE planning/running with 1-year shutdown at 2012 or 2013: go ahead with GPS front-end exchange in 2010/2011 shutdown priorities for scheduling in 2011: as normal (experiments waiting for beam longest) + projects for a PhD thesis (in case shutdown takes place in 2012) INTC accepts regular proposals in February 2011 (June and November to be discussed) some weeks of offline physics

Long CERN-wide shutdown We asked operations group and directorate for access to necessary infrastructure and support (controls, vacuum, RP, etc) for 3-4 months after the usual stop of ISOLDE physics (i.e.December-February or March). Our request was taken note of. Some ideas for offline physics were collected informally from various users: Examples of requests for long-lived species: Extracted from ISOLDE irradiated target: Plunger t1/2 measurements (require more beamtime, e.g. 216Po) Decay studies of long-lived nuclides Mass measurements (e.g. on neutrinoless double beta decay) Tensor current search with 60Co at NICOLE With samples irradiated elsewhere (e.g. PSI or ILL) and using the ISOLDE mass-selection capability and some of its experimental systems: 7Be for SSP and T-REX Ar from irradiated Ti foil: 39Ar for astrophysics, 42Ar for MINIBALL Ion-implanted 26Al target for astrophysics cross sections Requests for stable beams, mainly for setup characterisation: WITCH, NICOLE

Status of experiments - ECR ECR removal and new GHM experiment Many ECR parts waiting for transport to GANIL shipped yesterday

Status of experiments - MISTRAL Clean-up continues 22 ton magnet moved to CERN long-term storage only electronics and some vacuum parts remain

Status of experiments - Beta-NMR Beta-NMR system in place Beta-scintillator tests ongoing. Foil holder and connection to ISOLDE beamline still missing (delays at Rehovot). September tests with Be had to be cancelled. Tests of polarisation using Coulex on stable Ne beam done in Nov09: lower statistics than expected, analysis ongoing, no polarisation code available for comparison with data PhD students got some data for their theses: Christophe: Coluex on n-rich Rb isotopes Hans: analyse part of 11Be T-REX data

Status of experiments - CRIS Installation completed Prototype experiment for new safety structure Off-line run allowed successful tests of ion transmission Lasers working and laser tables ready First on-line run planned for November 2010 New CERN PhD student: Kara Lynch

Status of experiments - WITCH Additional shielding for REX mass separator under installation (to be tested with REX beam soon) Commissioning run in week 25: recoil spectra recorded. However, ISOLDE beam was a cocktail of rare-earth isobars and no identification or cleaning were possible at WITCH Physics run on 35Ar scheduled for week 46

Status of experiments - HV Platform Dismantled and removed HRS collection point to be mounted soon (needs to be properly shielded with concrete)

Status of experiments - GLM Some improvement in vacuum and beam focusing New setup available and to be installed soon Improvement of concrete shielding ongoing

New ISOLDE web page Online since September 2010: changes in layout and content missing info is filled up step by step some new elements, like NEWS