By : M. Dlamini D. Jonker E. P. Tarnow

Slides:



Advertisements
Similar presentations
A Method for Verifying Traceability in Effective Area for High Pressure Oil Piston-Cylinders Michael Bair Director of Metrology-Pressure Fluke Calibration.
Advertisements

General Statistics Ch En 475 Unit Operations. Quantifying variables (i.e. answering a question with a number) 1. Directly measure the variable. - referred.
Power Plant Construction and QA/QC Section 5.2 – Combustion Control and Burner Management Engineering Technology Division.
NCSLI 2007 A PRIMARY FLOW CALIBRATION SYSTEM FOR THE SUPPORT OF HIGH PERFORMANCE GAS FLOW TRANSFER STANDARDS P. Delajoud, M. Bair, C. Rombouts, M. Girard.
Crane Operations Objective
ENTC-303Dr. ALVARADO1 Fluid Mechanics LAB: PRESSURE MEASUREMENT AND GAGE CALIBRATION ENTC
VOLTMETER LOADING EFFECTS
Selection of measuring instruments
Title Explaining what is being done and what method How much was added and the conc. Instrument Settings Modifications to written experiment noted as proceded.
Low Density Parity Check Codes LDPC ( Low Density Parity Check ) codes are a class of linear bock code. The term “Low Density” refers to the characteristic.
Instrumentation Analyzer Pressure Regulation and Vent Recovery System Frank Ruiz, Ruiz & Associates.
NextPrevious CFlow+ Calibration Control Software Software upgrade for: Piston Calibrators / Provers Flow Transfer Standard - Gas & Liquid Bell Provers.
© NMISA 2010 INTERNATIONAL ACTIVITIES AT THE NMISA HUMIDITY LABORATORY DURING 2009/2010 Deona Jonker.
World Health Organization
Arsine Detection using Chemcassette ® Technology.
Snow depth measurement at METEO-FRANCE Clotilde Augros, Co-author : Fabrice Zanghi METEO-FRANCE, Direction des Systèmes d’Observation, 7 rue Teisserenc.
PROEDIT WRITING A PROCEDURE USING THE BUILT-IN PROCEDURE WIZARD.
Calibration Savvy. Calibration and Conformance  Calibration: Check a measurement against a known universally recognized standard to determine any deviation.
READING A PAPER. Basic Parts of a Research Paper 1. Abstract 2. Introduction to Technology (background) 3. Tools & techniques/Methods used in current.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
Your measurement technology partner for global competitiveness CSIR National Metrology Laboratory The National Metrology Laboratory of South Africa Feedback.
Section 3 – Electric Current Models. Experiment 3.1 A) Set up a simple circuit with a single battery and bulb. We will call this the “indicator bulb.”
© NMISA 2010 Dissemination of Mass Standards from the National Prototype by Thomas Mautjana.
Take Out Catalyst Sheet Pencil Science notebook. Catalyst What potential sources for error do you foresee occurring in this lab?
Validation Defination Establishing documentary evidence which provides a high degree of assurance that specification process will consistently produce.
The Measurement of Temperature
BME 353 – BIOMEDICAL MEASUREMENTS AND INSTRUMENTATION MEASUREMENT PRINCIPLES.
Lecture 8: Measurement Errors 1. Objectives List some sources of measurement errors. Classify measurement errors into systematic and random errors. Study.
Technical Report Outline Title Page Frontispiece Abstract Table of Contents List of Figures/ List of Tables.
Chapter 11: Measurement and data processing Objectives: 11.1 Uncertainty and error in measurement 11.2 Uncertainties in calculated results 11.3 Graphical.
An Automatic Calibration System for 10 M  to 1 T  DC Standard Resistors D.W.K. Lee and Y.C. Chau The Government of the Hong Kong Special Administrative.
+ Furio Cascetta, & Aline Piccato, $ Francesco Rampazzo, + Giuseppe Rotondo, & Pier Giorgio Spazzini METROLOGICAL CHARACTERIZATION OF A CAPILLARY TYPE.
APMP TC Fluid Flow Initiative Project Traceability Scheme Study for LPG Metering Final Report at APMP 2012 TCFF Meeting Chun-Min Su CMS/ITRI, Chinese Taipei.
Part Three – Relay Input Sources
APMP TC Fluid Flow Initiative Project Traceability Scheme Study for LPG Metering Progress Report at APMP 2011 TCFF Meeting Chun-Min Su, Ph.D. Center for.
Compressive Flow in Nozzles
Analog dc ammeter اعداد فراس محمود الحجه عبد الرحمن علان.
© NMISA 2010 THE 2009/2010 SANAS COMPARISON FOR HUMIDITY Deona Jonker.
MECH 373 Instrumentation and Measurements
Verification of Boyle’s Law
A V&V Overview of the 31st Symposium on Naval Hydrodynamics
Sensors and Detectors - 1
Accuracy Significance in Measurement.
Dimensional Analysis & Unit Conversions
Fluids Objectives: Pressure inside fluids Hydraulic Lift
Engineering Measurements
Setting Up and Performing a Calibration
Fundamentals of Harmonics
MAE 5380: AIR-BREATHING ENGINE INLETS
Date of download: 11/7/2017 Copyright © ASME. All rights reserved.
Capability Improvements of the NMISA Humidity Laboratory
Height and Pressure Test for Improving Spray Application
Presented by: Gumani Mphaphuli Date: 31st July 2017
Unit 7 ~ Gases (Chapter 13).
Air Volume Flow Rate and Centerline Velocity in a Tube Wind Tunnel
Section 1-2 Measurement.
What are the Common Warning Signs of Faulty Oil Pressure Sensor.
Temperature and Thermometers
READING A PAPER.
Readout units and the calibration of loadcells.
Physics! – Motion!.
Section 3-2 Uncertainty in Measurements
The Coefficient of Determination (R2) vs Relative Standard Error (RSE)
Value from Measurement Schematics
Figure 11-1.
Uncertainty in Measurement
Criteria for tests concerning standard deviations.
Figure Overview.
Figure Overview.
Measurement, Error, & Uncertainty
Presentation transcript:

By : M. Dlamini D. Jonker E. P. Tarnow Implementation of a New Calibration Method to Resolve Back-Pressure Effects on the Calibration of Gas Flow Meters By : M. Dlamini D. Jonker E. P. Tarnow TQM-5134-1

Overview Introduction Intermediate Checks Between Two Flow Cells of a Piston Prover Reference Standard Calibration Method – Split Method Verification and Commissioning of the 100 l/min Flow Cell - Validation of the Split Method Conclusion TQM-5134-1

Introduction The NMISA Gas Flow laboratory performed intermediate checks on their piston prover gas flow reference standard (ML-800) using a series method. When the flow rate was above 25 l/min, an “over-pressure” message was displayed by the flow cell connected upstream. This indicated that the pressure to the reference standard was higher than its limits, that is, it exceeded 1,244 kPa above atmosphere. The ML-800 gas flow reference standard is designed to be used at atmospheric pressures only. A new calibration method, Split Method, was implemented and validated to have both reference standards venting to atmosphere. TQM-5134-1

Intermediate Checks Between Two Flow Cells of the Piston Prover Reference Standard Intermediate checks were performed between two gas flow reference standards flow cells, ML-800-44 (50 l/min) and ML-800-75 (100 l/min). This was done to maintain confidence in the calibration of the 50 l/min flow cell and to commission the 100 l/min flow cell. Figure 1: Showing the in line (series) calibration method for two flow cells TQM-5134-1

Intermediate Checks Between Two Flow Cells of the Piston Prover Reference Standard The results were to be used to verify that the 100 l/min reference standard was not damaged during shipping from manufacturer. Table 1: Measurement results for intermediate checks between the 50 l/min and 100 l/min flow cells using series method. ML-800-44 (ml/min) ML-800-75 Correction Expanded Unc. 5 017,4 5 034,3 -17,0 8,1 9 981,4 10 006 -24 17 15 004 14 992 12 23 20 045 20 032 13 32 25 087 25 073 15 42 TQM-5134-1

Calibration Method – Split Method The Split Method calibration setup positions the reference standard and the UUT in a parallel configuration. This ensures that both the UUT and reference standard vent to atmosphere. Back-pressure is then eliminated. Figure 2: Split Method calibration setup. The arrows show the direction of gas flow. TQM-5134-1

Calibration Method – Split Method Any flow perturbation due to the up/down movement of the reference standard’s piston is avoided. The Split Method was validated using measurement results for the verification and commissioning of the 100 l/min flow cell. The Split Method was validated against a series calibration method using a laminar flow system as the reference standard. The 100 l/min flow cell was calibrated against the 50 l/min flow cell using the Split Method. It was then calibrated against the laminar flow system using a validated Series method. The results are discussed in the next section. TQM-5134-1

Verification and Commissioning of the 100 l/min Flow Cell Table 2: Shows summarized Split Method validation results. Nominal Flow (ml/min) Split Method Correction (ml/min) Series Method Correction (ml/min) Split Method Exp. Unc. (ml/min) Series Method Exp. Unc. (ml/min) Calculated |En| values 5 000 -25,8 -27,5 105 11,7 0,02 10 000 -39 -42 24 0,03 15 000 38 -8 112 34 0,39 20 000 29 -10 109 46 0,33 25 000 18 -58 110 58 0,61 30 000 17 -106 116 72 0,90 35 000 4 -109 117 81 0,79 40 000 -13 -133 121 92 0,78 45 000 -167 132 102 0,94 50 000 -9 -173 0,95 TQM-5134-1

Verification and Commissioning of the 100 l/min Flow Cell The normalized error values (En) between the Split Method and the Series method were all less than or equal to 1. The results are also shown graphically in figure 3. The graphs shows overlapping uncertainties. This indicates satisfactory performance of the Split Method. Raw validation data is presented in the full paper. TQM-5134-1

Verification and Commissioning of the 100 l/min Flow Cell Figure 3: Graphical presentation of the Split method validation results. TQM-5134-1

Verification and Commissioning of the 100 l/min Flow Cell The measurements indicate good agreement between the 50 l/min and 100 l/min flow cells. Using the Split Method, gas flow measurements up to 50 l/min can be performed without any over-pressure error. This was because the reference standard and UUT were both venting to atmosphere eliminating any flow restriction which would cause back pressure. TQM-5134-1

Conclusion The ½”-¼” reducer created flow restriction which resulted in back-pressure in the flow cell upstream. The Split Method has the two flow cells venting to atmosphere, hence the back-pressure was eliminated. Thus, flow measurements up to 50 l/min could be performed. The Split Method will also be validated to calibrate other types of instruments such as mass flow meters. TQM-5134-1

The End Thank You! TQM-5134-1