The Ohio State University

Slides:



Advertisements
Similar presentations
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Advertisements

Minimum Bias Trigger Scintillators (MBTS) a project of: CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Status of the CSC Track-Finder Darin Acosta University of Florida.
28 Jan 2009G. Rakness (UCLA)1/15 Overview of What Was Done Last Week… Worked with Alex M. to measure ALCT turn-on curves –See next slides… Obtained values.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
CSC ME1/1 Patch Panel Interconnect Board (PPIB) Mikhail Matveev Rice University February 27, 2013.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
9/29/2016E. Hazen - oSLB1 HO Trigger Links ● oSLB produced (69 pieces) – First few tested (by me) -- seem OK – Production testing to be done by student.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
What goes on to make my blood glucose levels high or low?
PIXEL CAEN Installation Status
University of Wisconsin
Status of NA62 straw readout
LKr status R. Fantechi.
Recall: CSC TF Halo rate spikes during run (23 May)
LAV front-end and readout status
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
CSC EMU Muon Port Card (MPC)
“Golden” Local Run: Trigger rate = 28Hz
EMU Slice Test Run Plan a working document.
HCAL DAQ (hardware) Debugging Status
10/month is the present production rate 2 FTE + sporadic contributions
How to Fix Microsoft Office Error 2932 at Support Number
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
B904 Status Report by Fred B.
CSC Turn ON Status Report by Fred B.
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
CSC Status Report Status reports;
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

The Ohio State University Electronics Jianui Gu The Ohio State University “When a great team loses through complacency, it will constantly search for new and more intricate explanations to explain away defeat.” Pat Riley

Electronics Commissioning CERN schedule allowed only 3 Commissioning Days Dec. 19,2007 – Jan 19, 2008 We have had 5 weeks to Look at ME+ Electronics Team A – Greg, Misha, Fred,Igor, Jay, Jordan Tucker, Chad Jarvis,Shi-Chuan Kao,Nick Kypreos, John Babb 162 chamber's electronics powered 95 % of boards communicated immediately All firmware on detector boards upgraded DMB,TMB,VMECC,ALCT Greatest portion of time - Timing Constants Relatively Few Board Problems replaced 1 VMECC, 3 DMBs, 1 TMB barely touched spare boards All spare boards at CERN except: ~100 repaired CFEBs stored at OSU ~20 DMBs under repair at OSU 10 VMECC in various test stands Most Boards/Chambers have not been powered for more than a few hours in several years

Electronics Problems Encountered TTC Missing Hard Reset Problems - CCB initialization - DCC ??? VMECC new firmware hangs software - new firmware release last week (fixed) some CFEB/DMB userid's erased Many skew clear cables need to be reseated 2 Fiber Cassettes Reversed CFEB firmware downloading failure ME+1/1/35 CFEB1 TMB - some red warning for TMB status 3.3V or 1.5V reading) CFEB - some crazy temp readings CFEB - a few rx scans failed (not essential) Serious?! Could be a lot worse…

Status – Overall View at present electronics read in for 110/468=23% of detector Readout (Working on it): ME+1 12/104 missing - problems understood (probably fixed by now) ME+2(far),ME+3(far) 33/51 missing - not yet properly timed Lesson’s Learned(Still learning) Timing Difficult - cable delays are no godsend Need quick feedback on Farm Data Reference Chambers in Software not Crate/Slot - DBs needed (kludged for now) Commissioning needs to be done board by board - There are no short cuts

Are we going to make it? Not at this Rate ! We need to gain a month! 150 chambers/6 weeks Early June HV/LV/Cooling/Fibers??? Expect Delays! YE-1 Fiber Blowing started Timing is still the Major Issue electronics not debugged until DAQ works we uncover “real” problems in data taking ME+ chamber electronics needs to be fully commissioned by Mid-March to join the Cosmic Runs We are eating up a large amount of time even being able to pulse 150 chambers ! We are leaving no time for swapping front-end boards, Chamber problems, Global Commissioning Mid-March: Team A diverts to installing YE- Fiber Patch Cabling,… Commissioning Needs to Speed Up Double Shifts !?###?! Division of Labor …