HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Utility Extension Project
ESTIMATING By Laith Jacob.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
As developed by the Gilford Facilities Planning Committee.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Manistee County Library Master Space Plan December 2013 Quinn Evans Architects & GMB Architecture and Engineering.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
April 24, 2012 Report on Operating Costs for Proposed Jail Expansion 04/24/12 1 Report on Operating Costs for Proposed Jail Expansion.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Property Appraiser and Tax Collector Office Space Update August 5, 2014.
PHS - MAINTENANCE BUILDING SEISMIC STRENGTHENING PROGRAM/ MEASURE E BOND PROGRAM INVESTIGATION, ANALYSIS, AND PRELIMINARY CONCEPT October 24, 2007 R. P.
1 Agenda February 15, 2007 Facilities Advisory Committee 1)Call to Order – Paul Stansberry & Kevin Max 2)Option 3 – Plan & Costs 3)Operating Costs 4)Timeline.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
SACRED SPACES UPDATE November 20, /20/111.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
Board of Selectmen Meeting April 14, Outline  Overview of problems  Overview of original plan  Overview of new plan Highlights Cost Timeline.
Site & Building Assessment Study Conducted by: Caolo & Bieniek Associates, Inc. Fire Station Study Committee Report to Select Board September 18, 2006.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
FY2007 Budget Presentation Annual Town Meeting April 24, 2006.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
LenderSelect Mortgage Group Education for Renovation
BLAKELY  Welcome.
MANASQUAN PUBLIC SCHOOL DISTRICT
Tentative Budget Review
Chapter 14 Budgeting.
Addition of Fire Alarm system. None existing.
CITIZENS BLUE RIBBON COMMITTEE
Getting the most out of your consultants
Background B513 built in early 1970’s for mainframe era.
FY 2018 Board of Selectmen Budget April 17, 2017 BONDED PROJECTS
Redifer Commons Addition & Renovation Project
Caryl School Open Hearing March 26, 2007.
Valley & Third Streets Redevelopment
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Bond Election Order “SHALL the Board of Trustees of the Rockwall Independent School District in Rockwall, Kaufman and Collin Counties, Texas be authorized.
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Elaborating The Committee Charter:
Town of Newbury Proposed New Fire Station
FY 2018 Board of Selectmen Budget April 17, 2017 BONDED PROJECTS
Welcome.
Creating a Design Plan Working with Clients.
CV Futures Task Force Report May 8, 2017
The Asset Management Journey for Building Assets
House Construction Budget Plan
Coppin State University
Delta Water Supply Project
Sandy Grove Middle School
Existing Fire District Buildings
Measure – V Facilities Update April 8th, 2019
Stoughton Public Library
Presenters: Sergio Rodriguez, EAS Operations Manager | Kitchell CEM
FY BUDGET HIGHLIGHTS. VILLAGE OF ROMEOVILLE FY BUDGET PRESENTATION APRIL 17, 2019 Village Board Room 6:00 PM.
FY2019 Proposed Budget Open House
Building Committee FIRE DEPT. MEMBERS
Dixon Middle School Project Update
August 14, 2018 Rockwall County, TX – Justice and Detention Center - Needs Assessment Task 1 – Summary + Preliminary Estimate of Probable Cost South Correctional.
Presentation transcript:

HARWICH FIRE STATION 2 Board of Selectman Presentation 11/06/2017

Presentation Outline Current Costs & Trends HARWICH FIRE STATION 2 Presentation Outline Current Costs & Trends Total Project Cost vs. Construction Cost Design Options and Assumed Costs Option 1: 11,531 SF Renovation & Addition Option 2A: 7,321 SF Renovation & Addition Option 2B: 7,321 SF Renovation & Addition Option 3: 9,461 SF All New Construction Summary of Options and Assumed Costs

Current Costs & Trends Construction Industry is booming HARWICH FIRE STATION 2 Current Costs & Trends Construction Industry is booming Resulting in higher construction costs Smaller projects result in higher cost per SF Meeting w/ Estimator for assumed cost per SF New Construction (Apparatus Bay) = $400 per SF New Construction (Dormitory Area) = $425 per SF Renovation (Apparatus Bay) = $125 per SF Renovation (Dormitory Area) = $350 per SF Cost per SF will be refined as scope of work is defined Extent of roof replacement, hazardous material, test pit results, new sewer line, etc.

Construction vs. Total Project Cost HARWICH FIRE STATION 2 Construction vs. Total Project Cost Construction Cost is materials and labor plus General Conditions & Overhead, Insurance, Bonds, GC Fee, Permit Fee, and Escalation. Total Project Cost is sum of total construction cost plus: Temporary Relocation/moving Land Survey/Geotech investigation Arch & Engineering Fees Furniture & Equipment Owner’s contingency

Existing Building Floor Plan HARWICH FIRE STATION 2 2,217 SF 3,304 SF Existing Building Floor Plan

HARWICH FIRE STATION 2 - OPTION 1 ($6,661,486) 11,531 SF Reductions No Basement 40 to 30 lockers Concerns Current 12’ wide overhead doors Change in floor elevation between Bay and Living Area Response time Safety Hazard Requires ramps/stairs Current condition of roof unknown Age of Facility 2,217 SF 2,876 SF 3,134 SF 3,304 SF

HARWICH FIRE STATION 2 - OPTION 2A ($4,100,000) 7,321 SF Reductions No Basement Reduce from 40 to 30 lockers Remove SCBA Lt. Room to include task office Police Office eliminated No App. Support Space or additional bay/half bay No additional SF for kitchen/dayroom/dining Benches removed from lockers No Fitness Room 2217 SF 1800 SF 3,304 SF Concerns Same as Option 1 (slide 7)

HARWICH FIRE STATION 2 - OPTION 2B ($4,100,000) 7,321 SF Reductions No Basement Reduce from 40 to 30 lockers Remove all App. Support Space Renovation only of existing 2217 SF 1800 SF 3,304 SF Concerns Same as Option 1 (slide 7)

HARWICH FIRE STATION 2 – OPTION 3 ($6,044,954) 9,461 SF Reduced App. Bay SF – no existing restrictions All one level Increased safety Extended building life 50 year building Efficiency in space planning Meets RFP requirements No temporary relocation fees New Construction Only Total Project Cost: $6,044,954 (approximate – need site cost)

Proposed Site Plan HARWICH FIRE STATION 2 – OPTION 3 ($6,044,954) N ROUTE 137 ROUTE 39 Proposed Site Plan

Proposed Massing (preliminary) HARWICH FIRE STATION 2 – OPTION 3 ($6,044,954) Proposed Massing (preliminary)

Design Options Summary HARWICH FIRE STATION 2 Design Options Summary Design Options and Assumed Costs Option 1: 11,531 SF - $6,661,486 Total Project Cost Option 2A: 7,321 SF - $4,100,000 Total Project Cost Option 2B: 7,321 SF - $4,100,000 Total Project Cost Option 3: 9,461 SF - $6,044,954 Total Project Cost

HARWICH FIRE STATION 2 Questions & additional discussion