Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

OPERATION SAFE STOP An Educational Campaign by the New York Association for Pupil Transportation Prepared by NYAPT through the National Highway Transportation.
Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles
ALO Planning & Assurance Requirements
HSSE Policy Z Contractor HSSE Induction V2. HSSE Policy Z Contractor HSSE Induction V2.
Rail Safety Induction. 2 2 SAFETY IS OUR FIRST PRIORITY
The Safe Use of Work Equipment. Overview This training tool is dedicated to work equipment and their associated hazards. Work equipment means any machinery,
Safety for Workers on Foot. Safe Practices  Consider worker behavior when developing the ITCP. Determine locations where workers are likely to go.
1 Mark Prescott RRV Safety Improvement Programme Duplex-RRV Comms Communications Protocols.
Even if risk management strategies are in place, complacency can defeat them. Continuous awareness is required. Coroner CJ Devonport 30/3/2010 What have.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
Employee and Contractor Induction
Electrical Safety.
EXECUTIVE MANAGEMENT OHS SEMINAR Due Diligence for Community Sector Leaders PRESENTATION PART 4 (Avenues for information and support; checklist for getting.
Management of Health And Safety.
WYVERN 10K MARSHAL BRIEFING. Briefing Structure The Course Race Day What the Teams do Marshalling The Road Order Safeguarding our junior runners Communication.
Infrastructure Projects 05/09/2015Bill Cooke Behaviour Change Team1 LIFE SAVING RULES.
Terry Smith – Head of SHEQ (Projects)
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
Section 54’s 54.Inspector’s power to deal with dangerous conditions – (1) if an inspector has reason to believe that any occurrence, practice or condition.
How to Prevent School Bus Danger Zone Casualties?.
Al Sulokeyat Al Salema and Al Sulokeyat Al Salema and Accountability for Safety.
Danger Zone Control and the Duties of Sentries Guidance on how to ensure control of the danger zone and what is expected from sentries. Quarries Working.
SCHOOL BUS & ROAD SAFETY. Hi friends, I am Buddy. I travel by the school bus everyday. I understand the importance of school-bus safety in our lives.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
CDM Construction Design and Management
Gasunie is one of the biggest gas infrastructure companies in Europe. Within the company, we give safety the highest priority; it forms the basis of our.
Conducting business the right way Nobody should get hurt or made unwell by what we do GROUP HEALTH, SAFETY & WELLBEING POLICY Version 1 [August 2016]
CDM Site Induction SCS FORMULATE HALL 1, RICOH ARENA 15 – 16 NOVEMBER 2016 CDM SITE INDUCTION.
SME 50/30 Meter Rule.
We always have time to work safely
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
20 Principles for Managing Behavioural Safety & Process Safety
In Too Deep A CDM Perspective – Acting BEFORE Construction Begins.
Ivor Goodsite Presentation
Lock Out & Tag Out.
ODOT Railroad Access & Safety
Customer Services Web Data entry principles and instructions
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
ROAD TO GOAL ZERO 6. Manage Rule Breaking
Behavioural Safety Use Of Work Equipment.
WP 3 How to assess implementation of ALARA
Virginia Driver Responsibilities: Licensing Responsibilities
These are the new bus expectations for all buses in District 742
Understanding of Health and Safety
California Operation Lifesaver
Smart Employment Solutions is the trusted name in Apprenticeships and Traineeships across Brisbane and Gold Coast. For advice and options call us on 07.
Life Saving Rules-Do it Right!
Principal Contractor Licensing Scheme Standard
Ivor Goodsite Presentation
Plant Person Segregation
lesson 15.3 PASSING AND BEING PASSED ON RURAL ROADS
Template Name: ENGAGE™ Change Champion Onboarding Pack
How we use Your Health Records
Home- School Agreement.
Before I leave, I need to learn the rules of the road to keep me safe.
Walker Agreement 10k Sponsored Walk. Saturday 23 June 10am
HSE Tips for Site / Field Visit
‘TYRED’ SCHOOL EDUCATION PACK FOR KEY STAGE 2,3 & 4
What’s the campaign about?
Handout 3: Problem solving
Drilling and Blasting Toolbox Talk : 03 Updated Aug 2014
Lesson 10.6 ROUNDABOUTS Some intersections are designed as circles called roundabouts, also called traffic circles or rotaries. Roundabouts do not have.
Drilling and Blasting Toolbox Talk : 07 Updated Oct 2015
CLICK TO SHOW ANIMATION
The Role of the Workplace OSH Representative
That person will have been involved in the planning of the work.
Worksafe Procedure NR/L2/OHS/00112
Ivor Goodsite Presentation
Presentation transcript:

Lifesaving Rule: Plant Exclusion Zones (RRV Operations) Key Principles Mandatory Briefing for ALL PTS holders. The following instructions have been developed by a cross industry working group that included multiple Network Rail Functions and Contractors and Trade Unions on behalf of the RRV Safety Improvement Programme. The briefing must be given to ALL PTS Holders The reason for this is that any PTS holder may come across an RRV when on track and needs to understand these requirements to ensure they protect their personal safety. In the past PTS holders have been warned that moving machinery is dangerous. These instruction now require PTS holders to be proactive when approaching RRVs. This represents a change of behaviour and safety culture.

Person Plant Interface (RRV Operations) Key Principles Our Lifesaving Rules Over the past six months we have consulted with over 1,300 staff members, union colleagues, suppliers and other organisations to develop our Lifesaving Rules. We have agreed 11 Lifesaving Rules. They’re here to protect all of us. If you’re ever asked to break or ignore any of these Rules, you have the right to say no. For more information please speak to your line manager.

Lifesaving Rule: Plant Exclusion Zones Person Plant Interface (RRV Operations) Key Principles Lifesaving Rule: Plant Exclusion Zones RRV’s are dangerous and unpredictable. That’s why our new Lifesaving Rule requires us to keep a clear exclusion zone around all moving machinery. Before you pass or work near an RRV always make sure you have permission from the Machine Controller or Crane Controller. When in doubt ASK B4U PASS The Plant Exclusion Zone Life saving rule (LSR) applies to ALL moving machinery being deployed on behalf of Network Rail whether it be in a rail, construction or high-street environment. The following Instructions are specifically targeted at RRVs. Information on how the LSR applies to other types of plant and moving machinery will be supplied during the next three months. RRVs for the benefit of these instructions includes ALL Road Rail Vehicles including MEWPs (including Unimogs, SRS and Cherry Pickers) and all other RRVs eg Gators & Dumpers etc. NB:- RRVs are only dangerous and unpredictable if planned safe systems of work are not followed or machines treated with respect. Never enter the agreed exclusion zone, unless directed to by the person in charge.

Machine operating area Waiting for authority to pass Person Plant Interface (RRV Operations) Key Principles Walking past - Risk Applicable to ALL When you need to move past a machine stop at a safe distance Make contact with the MC/CC Only proceed when authorised by the MC/CC MC/CC Machine operating area Waiting for authority to pass In this scenario track workers are required to take responsibility for there own safety. They are required to be proactive and communicate with the Machine Controller/Crane Controller, who will in turn communicate with the machine Operator and make it safe for the trackworker to pass. They should not be taking any risks or making their own judgements as to whether it is safe to pass the machine. ASK B4U PASS!

Waiting for authority to start work Machine operating area Person Plant Interface (RRV Operations) Key Principles Working in the vicinity of a machine - Risk Applicable to ALL Before you work in the vicinity of a machine you must first make contact with the MC/CC The MC/CC will inform you if you can work in that particular area Only when you receive this authority from the MC/CC can work commence In this scenario the team of trackworkers may be working near to or in the vicinity of an RRV (not with it). If you are working near to an RRV always communicate with the Machine/Crane Controller before you start work to establish what each others work is and how you can maintain a safe exclusion zone from the machine. You must not commence work until you have agreed a safe method with the Machine/Crane Controller which maintains a safe exclusion zone around the machine. If an agreement cannot be reached then the issue must be escalated to the Site Manager BEFORE work commences. MC/CC Waiting for authority to start work Machine operating area

Waiting for authority to work with machine Machine operating area Person Plant Interface (RRV Operations) Key Principles Working with a machine - Risk Applicable to ALL You must discuss with MC/CC what type of work is required to be carried out The MC/CC will inform you when this work can commence Only when you receive this authority from the MC/CC can you undertake this work In this scenario you will be working with the machine e.g. installing new S&C components. Where staff are working in such close and dangerous proximity to the machine then the Machine/Crane Controller must enforce strict control of the exclusion zone. Trackworkers must not enter the danger zone unless given specific permission to do so. MC/CC Waiting for authority to work with machine Machine operating area

MC/CC - Important Reminder Person Plant Interface (RRV Operations) Key Principles MC/CC - Important Reminder Always be aware of the area around your machine Do not let anyone enter the area where the machine is operating without your permission Only allow site personnel to pass your machine when it is safe to do so Anyone entering your area without your permission ‘stand down’ the machine and report it to the Site Supervisor/Team Leader

Machine Operator – Important Reminder Person Plant Interface (RRV Operations) Key Principles Machine Operator – Important Reminder The MC/CC will inform you of the work location, work activity, site risks and personnel authorised to work in/near the operating area of the machine Always be aware of personnel working with or near your machine Any unauthorised personnel entering your operating area ‘stand down’ your machine and inform the MC/CC

Person Plant Interface (RRV Operations) Key Principles Our Lifesaving Rules For more information on the Lifesaving Rules please visit: www.safety.networkrail.co.uk/LSR

Lifesaving Rule: Plant Exclusion Zones Person Plant Interface (RRV Operations) Key Principles Lifesaving Rule: Plant Exclusion Zones