Organics Waste Processing Facility Construction Progress Update December 15, 2010

Slides:



Advertisements
Similar presentations
Facilities Management FCMAT 2006 Update Timothy White Assistant Superintendent, Facilities Planning and Management December 13, 2006.
Advertisements

Concrete Fooring & Roofing System
NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Culverts – Installation Soil Steel Structures – No backfill.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune December , 000 sq ft ExpansionTotal.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
 Building Walls  Wood Framed Walls  Precast Concrete Walls  Steel Framed Walls  Sustainable Walls.
FOOTINGS.
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Concrete Construction
1 IRC 2009 CHAPTER 4 FOUNDATION. 2 FOUNDATION-8 SECTIONS  GENERAL  MATERIALS  FOOTINGS  FOUNDATION  RETAINING WALLS  DRAINAGE  WP&DP  COLUMNS.
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Foundations Mr. O’Rourke Construction. Definition the first piece of a home to be constructed and creates a base for the rest of a home's components.
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
Introduction to a pit installation
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
The Evolution of the TERRA Crystal Galleries Mineral Showroom.
MASONRY. Introduction Masonry→ construction of buildings units bonded together with mortar The building units →bricks, stones or precast concrete, Depending.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
TCUSD New K-5 Construction PROJECT UPDATE NOVEMBER 4,
Project Status The project is progressing well with both grading aspects and building components. The mason has erected many walls to “scaffold high”
Caretakers House Demolition Decking to STEM and ARTS.
F ACILITIES, P LANNING, AND C ONSTRUCTION December 14, 2015 – Monthly Construction Report.
Foundation Loads Dead Load Live Load Wind Load
FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
Miller Driscoll Building Committee Update Tuesday, January 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations Miller-Driscoll.
Building Resource Inc. Sustainable Durable Buildable Cost Effective
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
Concrete Products Manufacturers in Dubai
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Commercial Floor Systems
Bond Oversight Committee
Construction/Renovation/Maintenance
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Residential Wall Systems
PAT MEETING HISD JACK YATES HIGH SCHOOL February 16, 2017 PAT MEETING.
Grout and Other Reinforcement Module
SAL COLLEGE OF ENGINEERING.
Residential Wall Systems
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Pinole-Hercules Water Pollution Control Plant Upgrade Project
4th Annual Construction Law Summit
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Minuteman Vocational Technical Regional High School Progress
Course Contents Culverts Bridges Buildings 20 November 2018.
Progress Report 11/10/11.
MATERIALS AND CONSTRUCTION I
Commercial Floor Systems
Residential Wall Systems
Residential Wall Systems
Minuteman Vocational Technical Regional High School Progress
Commercial Floor Systems

Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Organics Waste Processing Facility Construction Progress Update July 8, 2011
Masonry Bearing Walls.
Presentation transcript:

Organics Waste Processing Facility Construction Progress Update December 15, 2010

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Masonry and structural steel work in administration building area (November 15, 2010)

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Tunnel 7 spigot piping and Granular A backfilling (November 16, 2010)

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Backfilling and compaction in biofilter cells (November 22, 2010)

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Concrete pour for tunnel wall along Gridline 4 (November 24, 2010

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Precast hollow core slab installation in administration building (November 25, 2010)

Organics Waste Processing Facility Construction Progress Update December 15, 2010 Precast hollow core slab installed over tunnel 7 (November 26, 2010)