Supplier Performance Development Process

Slides:



Advertisements
Similar presentations
Global Supplier Quality Manual PPAP Requirements
Advertisements

PPAP Requirements Training
Watts Waters Technologies
Guardian Tier 2 PPAP Guidelines
Quality Management System
QMS Tips and Traps (ISO TS16949)
5.2 Personnel Use competent staff Supervise as necessary
Measurement System Analysis (MSA) Discussions at CSIR S.A
Supplier Program Review Meeting #1
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
Supplier Program Review Meeting #1
Degree and Graduation Seminar Project Management Processes
1 Manufacturing Processes and Validation for Next Generation Implants.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
Visit us at E mail: Tele:
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
A JSJ Business Production Part Approval Process AIAG PPAP 4 th Edition Supplier Production Part approval process GHSP.
Phase 3: DEVELOPMENT & VALIDATION
M ULTI -S TATE A DVANCED M ANUFACTURING C ONSORTIUM _v001_msamc_courseware_quality_ppt _v001_msamc_courseware_quality_ppt7 found in Resources.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Supplier Performance Development Process
1 Manufacturing Processes and Validation for Next Generation Implants.
Supplier Corrective Action Request (SCAR) Supplier Training
External Provider Control
Production Part Approval Process
Process engineering Quality controls.
How to apply APQP APQP is comprised of one pre-planning stage and five concurrent phases. Once begun, the process never ends and is often illustrated in.
Production Part Approval Process (PPAP)
Control Plan Training.
QUALITY CONTROL FOR NFI
Integrating QS9000 Requirements
Project Quality Management
Lean Six Sigma DMAIC Improvement Story
APQP Five Phase Process
BUSINESS PROCESSES MAP
Flooding Walkdown Guidance
Practical Assessment Project Template
DSQR Training Supplier Quality Manual
Lean Six Sigma DMAIC Improvement Story
DSQR Training Control Plans
Appearance Approval Report (AAR)
Quality Management Systems – Requirements
Global Supplier Quality Early Production Containment Training
Lean Six Sigma DMAIC Improvement Story
Introduction to PPAP 4th Edition
GE 6757 TOTAL QUALITY MANAGEMENT
CDRL E003 CFAT REPORT TEMPLATE
of Key Characteristics
  Aptiv Global Supplier Quality Early Production Containment Training.
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
APQP PROCESS FLOW Prepare for APQP Plan and Define Program
This PPAP File Is Under Construction
PRODUCTION PART APPROVAL PROCESS Based on PPAP Manual 4 edition
RISK REDUCTION PROCESS
CVG Global Phased PPAP Process
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
First Article Inspection
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
Supplier Performance Development Process
Integrating TS Requirements
Global Supplier Quality Early Production Containment Training
Advanced Product Quality Planning (APQP) and Production Part Approval Process (PPAP) Training Material Nordin Mimouni – Supplier Quality Manager Rev. 01.
Advanced Product Quality Planning 2nd Edition
1 ADVANCED PRODUCT QUALITY PLANNING Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Practical Assessment Project Template – DMADV
Presentation transcript:

Supplier Performance Development Process Task 15: PPAP 60 Minutes Supplier Performance Development Process Task 15 PPAP

Task Description PPAP Production Part Approval Process (PPAP) Task 15: PPAP 60 Minutes Task Description Production Part Approval Process (PPAP) Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etc Parts from production run are analyzed Test results and records from APQP are submitted with Part Submission Warrant PPAP Same PPAP procedure 20-Sep-99 Task 15: PPAP

Purpose For the supplier to demonstrate Task 15: PPAP 60 Minutes Purpose For the supplier to demonstrate all design records and specification requirements are properly understood the process has the capability to produce product that meets requirements 20-Sep-99 Task 15: PPAP

Application Something Changed Task 15: PPAP 60 Minutes Application AIAG PPAP manual defines when PPAP submission is required New part Correction to discrepancy in previous submission Design or process change Change in source of subcontracted materials or services transfer or rearrangement of tooling & equipment Something Changed 20-Sep-99 Task 15: PPAP

Methodology Buyer enters PPAP submission date on purchase order Task 15: PPAP 60 Minutes Methodology Buyer enters PPAP submission date on purchase order Approver determines submission level default level 3 default level 4 for raw material Supplier submits PPAP PPAPALL.xls electronic submission recommended Approver evaluates PPAP package Level 5 at supplier site Approver determine part submission status Notify supplier and manufacturing of status Default level for raw material is 4 PPAP package forms, checklists, charts, capability analysis, measurement analysis included in PPAPall in an Electronic Format 20-Sep-99 Task 15: PPAP

Supplier Data Received Task 15: PPAP 60 Minutes Supplier Data Received Warrant Appearance Approval Report (AAR), as required Sample Parts Print/Design Record Engineering Change Documents Check fixtures/aids Process Flow Diagram PFMEA DFMEA Control Plan Early Production Containment Plan (Pre-Launch Control Plan) Process capability studies Gage Measurement System Analysis Lab Accreditation & scope Restricted & Reportable Materials form Interim Worksheet, if required 20-Sep-99 Task 15: PPAP

Task 15: PPAP 60 Minutes PPAP Review Checklist Delphi checklist to assist with evaluation of PPAP package Action plan created with use of checklist Included in the appendix 20 and PPAPall 20-Sep-99 Task 15: PPAP

Task 15: PPAP 60 Minutes Flow Chart Linkage of Product Characteristics from DFMEA to Operational Steps Operation numbers consistent with PFMEA, Control Plan, Operator Instructions Ensure identification of inspection and rework Use A-6 Process Flow Chart checklist in APQP manual to evaluate 20-Sep-99 Task 15: PPAP

Task 15: PPAP 60 Minutes PFMEA Linkage with DFMEA, Process Flow, Control Plan, Operator Instructions, etc Degree to which high RPN’s are addressed with preventive strategies Action Plans assigned, implemented, effectiveness assessed and RPN recalculated Use A-7 Process FMEA checklist in APQP manual RPN = 504 20-Sep-99 Task 15: PPAP

DFMEA Assess feasibility, risk, design intent issues Task 15: PPAP 60 Minutes DFMEA Assess feasibility, risk, design intent issues Confirm manufacturing process capability considered Focus on Critical Characteristics Lessons Learned incorporated Use A-1 Design FMEA checklist in APQP manual to evaluate 20-Sep-99 Task 15: PPAP

Task 15: PPAP 60 Minutes Control Plan Ensure Control Plan is aligned to, and correlates with, DFMEA, Process Flow, PFMEA Control Methods appropriate to variation type(s) Incorporates Lessons Learned, Statistical Data Use A-8 Control Plan checklist in APQP manual to evaluate 20-Sep-99 Task 15: PPAP

Pre-Launch Control Plan Task 15: PPAP 60 Minutes Pre-Launch Control Plan Early Production Containment requirements Additional controls included for proper duration or quantity PFMEA and statistical data used to determine what additional controls necessary short term capability long term capability on similar process 20-Sep-99 Task 15: PPAP

Process Capability Studies Task 15: PPAP 60 Minutes Process Capability Studies 20-Sep-99 Task 15: PPAP

MSA Studies Measurement uncertainty determined Task 15: PPAP 60 Minutes MSA Studies Measurement uncertainty determined Gage R&R, Bias, Stability, and Linearity Gage R & R acceptance guidelines < 10% acceptable 10-30% may be acceptable, evaluate total variation >30% unacceptable, measuring system needs improvement Verify study performed correctly 20-Sep-99 Task 15: PPAP

Part Submission Status Task 15: PPAP 60 Minutes Part Submission Status Full Production Approval Interim Approval Authorize shipment to Delphi without Full Production Approval Corrective Action Plan is required Rejected Corrected submission required before production quantities may be shipped 20-Sep-99 Task 15: PPAP

Task 15: PPAP 60 Minutes Interim Part Class A parts from production tooling and meet specs, not all PPAP requirements have been met B parts from production tooling and require rework to meet specs C parts not from production tooling, parts meet specs D parts do not meet specs E parts do not meet specs and vehicles with class E parts require retrofit to make them saleable Documents accompanying Interim approvals - Warrant, control plan, PFMEA, etc. as completed 20-Sep-99 Task 15: PPAP

Summary AIAG PPAP manual defines requirements Task 15: PPAP 60 Minutes Summary AIAG PPAP manual defines requirements APQP Product and Process Validation Supplier submits PPAP to proper level PPAP package evaluated and status determined Supplier and Delphi manufacturing site notified of PPAP approval status 20-Sep-99 Task 15: PPAP

Reference Documents AIAG PPAP, SPC, MSA,APQP and Control Plan manuals Task 15: PPAP 60 Minutes Reference Documents AIAG PPAP, SPC, MSA,APQP and Control Plan manuals GM 1411 Interim Approval Worksheet AIAG QS-9000 Manual Appendix 20: PPAP checklist Appendix 13: PPAPALL.XLS Same as current PPAP procedure 20-Sep-99 Task 15: PPAP