Contractor Injury – Electrical Arc Flash Washington Site

Slides:



Advertisements
Similar presentations
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Advertisements

Murray State University
 ELECTRICAL SAFETY Gerald P. Robinson Jr., P.E. – Hatch Mott MacDonald.
MNM Fatal Fall of Person Fall of Person October 17, 2013 (California) October 17, 2013 (California) Cement Operation Cement Operation Journeyman.
Two-mode Safety and Battery System Service
ELECTRICAL SAFETY-RELATED WORK PRACTICES Qualified Persons Those people that have training in avoiding electrical hazards while working on or near exposed.
Personal Protective Equipment (PPE)
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
When working on or near electricity or electrical equipment you must be trained in & use Electrical Safety Related Work Practices NFPA.
ARC FLASH ANALYSIS.
Arc Flash Energy & Protection Presented by EWB Engineering (Electrical Engineers)
BASIC RULES PPE basic rules include: Use the right PPE for the job.
Electrical Safety Training
Reducing Arc Flash Hazard in 3Ø Pad Mounted Transformers and Other Safety Considerations Presented at Western Energy Institute October 12, 2010 Christian.
Utilizing Only Qualified Persons for Electrical Work can Reduce Risk Presented by: Dennis K. Neitzel, CPE Director Emeritus AVO Training Institute, Inc.
INJURY PREVENTION ARC FLASH REGIONAL SAFETY MEETING.
Electric Arc-Flash Injury Reduction Program Herman O. Kemp Electrical Safety Consultant Safety Program Consultants, LLC.
Personal Protective Equipment An Employee Awareness & Training Course
What is Arc Flash? Arc flash is a short circuit through air that flashes over from one exposed live conductor to another conductor or to ground. Arc flash.
General Industry Standards Personal Protective Equipment.
High Voltage Electrical Safety
Personal Protective Equipment (PPE) Awareness Training S afety A wareness F or E veryone from Cove Risk Services.
Health and Safety. The Health and Safety at Work Act 1974 An Act to make further provision for securing the health, safety and welfare of persons at work,
Safety Culture Working on Small Problems Before They Become Big Problems Thomas M. Weishar – Naval Reactors.
ACCIDENT INVESTIGATION. Accident Investigation An Employer should immediately investigate the cause of any accident or other incident that : çresulted.
Hazard Communication Chemical Safety.
Copyright  Progressive Business Publications 1 Arc Flash Protection.
© Evaluating Electrical Risk Factors Module 3.
CTE - ELECTRICITY I General Safety Rules.  ANSI(American National Standards Institute)  Aprons  Arc flash  Ear plugs  Ear muffs  Electrical burn.
Safety Inspections & Hazard Recognition. Importance of Jobsite Safety Inspections Jobsite Inspections are a method of evaluating the implementation and.
PPE: Face, Head, Foot, and Hand The participant will better understand the various types of PPE and their importance as laid out by OSHA.
© Recognizing Electrical Risk Factors Module 2.
Electrical Safety The following contains disturbing images and videos. Caution is advised.
Knowing the dangers and preventing the hazards. Objective To make all employees aware of the possible dangers when using these tools, prevent injuries,
NFPA 70E Electrical Safety in the Workplace. Objectives What NFPA 70E covers Understand Arc Flash, Incident Energy, & Flash Protection Boundary Standards,
MNM Fatal Electrical Accident Electrical Accident October 10, 2010 (Oklahoma) October 10, 2010 (Oklahoma) Granite Operation Granite Operation Contract.
Electrical Hazards Temporary Wiring and Lighting Systems.
MNM Fatal Electrical Electrical October 12, 2006 (Minnesota) October 12, 2006 (Minnesota) Taconite Operation Taconite Operation Maintenance Coordinator.
First Draft Language (B) Service Equipment. In addition to the requirements in (A), service equipment shall contain the following information: (1)
Electrical Safety in the Workplace FN000385/CR. FN000385/CR, Electrical Safety in the Workplace 2 Overview NFPA 70E Objectives Electrical Hazards Mitigation.
Electrical Safety, Subpart K
MNM Fatal Electrical Electrical November 18, 2013 (Kentucky) November 18, 2013 (Kentucky) Crushed Stone Mine Crushed Stone Mine Contract Electrician.
NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces Article 130 A Operational Guide for Protection Against Shock and Arc Flash.
Electrical Safety in the Workplace FN000385/CR. FN000385/CR, Electrical Safety in the Workplace 2 Overview NFPA 70E Objectives Electrical Hazards Mitigation.
Electrical Events Involving Look-Alike Equipment within the DOE Complex.
Chicago Area Facilities (CAF) Electrical Safety Program.
Working On or Near Energized Conductors and FR Clothing.
What is an arc flash5 min. Video arc flash5 min. What causes an arc flash10 min. Video PPE15 min. PPE demo10 min Flash hazard15 min. ***Flash hazard analysis.
3 Ways to Prevent Electric Arc Flash Blasts By Steward Hudson From Designnews.com View Original Article HERE:
1 FOM 4.2 Remediating Arc Flash Hazards in New and Existing Data Centers Joseph Furmanski Director, Data Center Facilities and Technologies.
San Francisco Electricians. Why Do You Need to Call an Electrician? Most of us have studied that one subject about circuits, electricity, and electrons.
Rear end assembly.
Chapter 2 Safety. Chapter 2 Safety Objectives Understand the effects of electrical shock. Describe conditions likely to affect the severity of an electrical.
Personal Protective Equipment (PPE) Awareness Training
Always use proper handles of the pipe spinner
Inadequate PPE standards hazard
Compressor Safety Practices
Chapter 2 – Safety in Welding
Electrical Safety Equipment
General Information for Electrical Installations
Compliance Made Simple Presents:
Personal Protective Equipment
Compressor Safety Practices
Personal Protective Equipment (PPE) Awareness Training
Murray State University
PDO Second Alert What happened? Your learning from this incident..
Click to start.
Arc Flash Fundamentals & Compliance
Always keep your hands and fingers away from the Line of Fire
Presentation transcript:

Contractor Injury – Electrical Arc Flash Washington Site What Happened? On 3/15 contractor installed a 15 HP starter into a live 480V MCC Wore hard hat and safety glasses and used a regular screwdriver w/o an insulated shaft Received 1st and 2nd degree burns to face and both hands Fortunately, did not receive electrical shock or eye damage Contractor expects to recover fully with only minor scarring of hands 11/17/2018

Contractor Injury – Electrical Arc Flash Washington Site Background Experienced Journeyman with 20+ yrs. exp., Very familiar with site ~ 10 yrs. experience Trained on required PPE for Hazard Risk Category 3 electrical tasks Insertion of motor starter into live MCC a common practice at many sites 11/17/2018

Contractor Injury – Electrical Arc Flash Washington Site Preliminary Investigation Results Root/Contributing Causes Contractor Personal Performance - failed to utilize proper PPE and proper tool (V-rated gloves, V-rated screwdriver, FR coveralls, flash suit hood, etc.) Site Procedures did not not adequately address guidelines for working on electrically energized equipment 11/17/2018

Contractor Injury – Electrical Arc Flash Washington Site Preliminary Investigation Results Corrective Actions to be finalized after receiving final safety report from electrical contractor. Recommendations Sites should critically review procedures for working on energized electrical equipment to ensure necessary guidance, approvals,and oversight exist. (See NFPA 70E, Article 130 and draft procedure from Wyandotte, WYN032.043) 11/17/2018

MCC#2 – Contains total of 66 motor starters. Shutdown of entire MCC affects 4 of 7 reactor systems and other critical tank farm equipment 11/17/2018

3 phase, 480V starter for 15 HP agitator motor . Starter was removed to drill holes for future mounting of control relay 11/17/2018

Exposed 480 V buss bar with starter removed 11/17/2018

Incident occurred while tightening this hold-down screw from the front Rear view of starter. Incident occurred while tightening this hold-down screw from the front 11/17/2018

Uninsulated screw driver contacted electrically energized wire 11/17/2018

Signs of melting at screwdriver tip Signs of melting at screwdriver tip. Temperature likely exceeded 2500 °F from the front 11/17/2018

Soot residue on helmet and safety glasses 11/17/2018

PPE requirements poster located in MCC. Approx. 4 feet from starter 11/17/2018

Located in MCC. Approx. 10 feet from starter Duffle bags containing required PPE: V-rated gloves, FR coveralls, flash suit hood, etc. Located in MCC. Approx. 10 feet from starter 11/17/2018