Project Plan V3.0 for the ICD Revision

Slides:



Advertisements
Similar presentations
Performance Development Plan (PDP) Training
Advertisements

A Roadmap to Successful Implementation Management Plans.
Configuration Management
HOW TO WRITE AN ARTICLE FOR PUBLICATION Leana Uys FUNDISA.
Overview of the WHO ICD Revision Process (ICD-11)
Software Quality Assurance Plan
Project Perfect Pty Ltd Project Administrator Overview of Software.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
Access 2007 Product Review. With its improved interface and interactive design capabilities that do not require deep database knowledge, Microsoft Office.
CSCI 639 Topics in Software Engineering Assignment #5 Fall 2008.
CSCI 639 Topics in Software Engineering Assignment #4 Fall 2006.
New York State K-12 Social Studies Update Dr. John B. King, Jr. New York State Commissioner of Education President of the University of the State of New.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
1 Phase Implementation and Test Plan. Making your implementation plan First Steps  Consider your use case diagram and your prioritization of use cases.
Software Project Planning CS470. What is Planning? Phases of a project can be mostly predicted Planning is the process of estimating the time and resources.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
BioWeb … an online resource for bioenergy and bioproducts Sun Grant BioWeb … an online resource for bioenergy and bioproducts BBI Biofuels Conference Nashville,
Systems Analysis and Design in a Changing World, 6th Edition 1 Chapter 8 - Approaches to System Development.
S-27 / Basics of the Project Schedule / AIA Convention 1998 / 1 S-27 Designing the Project Schedule Phillip G. Bernstein, AIA Cesar Pelli & Associates.
Project Management Formal Methods. How do you monitor a project?
The Research Proposal AKA: Prospectus. Purpose Help you: Pull together planning you have already done. Identify areas where you need additional planning.
Software Engineering MCS-2 Lecture # 6
MA Thesis/Papers-In-Lieu Overview and Process. Thesis: What is it?  A thesis is a scholarly manuscript that reports on a significant in-depth investigation.
World Health Organization Classifications, Terminologies, Standards ICD Revision: Where Are We?
How do you eat an elephant? Janet May April 21, 2010.
Introduction Requirements and the Software Lifecycle (3)
Report Format 1st part Title fly Title page Letter of Transmittal
CMGT 410 aid Education Begins/cmgt410aid.com
WP3 - Evaluation and proposal selection
ICD Revision Process: Moving Towards ICD-11
Software Project Configuration Management
Teacher Evaluation Timeline
Working in Groups in Canvas
Overview of Project Planning
Performance Development Plan (PDP) Training
Rapid Application Development
OpenSAF Developer Days 2008 OpenSAF Release Management Session 15-07
UK Link Programme Update to PNUNC August 13th, 2013
Unified Process Source & Courtesy: Jing Zou.
Life Cycle Models PPT By :Dr. R. Mall.
UK Link Technology Refresh
Configuration Management (managing change)
United Nations Statistics Division
CMGT 410 HOMEWORK Education Your Life--cmgt410homework.com.
BSA 413 RANK Education for Service-- bsa413rank.com.
Review of Professional Standards A National Conversation
Theory, Tools, and Obstacles
Building Disaster-Resilient Places
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
SCC P2P – Collaboration Made Easy Contract Management training
Instructional Learning Cycle:
All in the family: ICD-11 and ICF Functioning TAG (fTAG)
IOF Event Overview Tool – status Feb 2018
Documentation Requirements of an IT Audit including Audit Management System (Area: Audit Process) A presentation by SAIs AFROSAI-E, Bangladesh, China,
TGac Ad-hoc lifecycle model
Diagnostic accreditation and the quality agenda – CQC’s perspective
CS 8532: Advanced Software Engineering
Software Engineering I Fall 2017
Evolutionary Software Process Models
CAD DESK PRIMAVERA PRESENTATION.
Structural Funds: Investing in Roma
Solving Problems in Groups
Overview of the recommendations on software updates
Time Scheduling and Project management
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
CIM Cooperative Work Program (COOP)
Project LocatePortland Team Pistol River Pocket Gopher
CMGT 410 HOMEWORK best future education / cmgt410homework.com.
Session 3.7: Implementing the geospatial data management cycle (Part 6): Data distribution, use, and update MODULE 3: GEOSPATIAL DATA MANAGEMENT Session.
Presentation transcript:

Project Plan V3.0 for the ICD Revision ICD Revision Process: Beta Phase and Finalization Dr. Anni Preisler Dr. Molly Meri Robinson Nicol

Introduction As per the meeting on the Joint Linearization for Mortality and Morbidity Statistics (December 2013), WHO decided to update the Project Plan based on new information and timelines Key documents ”ICD Revison Process: Beta Phase and Finalization” ”ICD-11 BETA 2013 Annotation Document” Previous Project Plan Drafts (2007-2010-2012)

Methods Software program: Microsoft Project The Project Plan was designed backwards An inflexible deadline of submitting the revised ICD in May 2017 Potential issues: the fact that tasks often take longer than originally projected Identifying those tasks that are most essential to completing the core requirements of the project on time A single, joint Project Plan To maintain a common, high-level overview, to allow for the identification of the interdependencies To limit the need to review multiple documents This was decided even though there are some tasks so complex and detailed that they might easily constitute a project plan in and of themselves, such as the review process or field trials

Results A document that suits multiple use cases, and that can be provided in a variety of formats One slide overview (a.k.a. Gantt/Calendar View) Task version(s) Useful, particularly for tasks 2 and 6, each of which include a very high level of granularity, number of subtasks, and associated details. Each TASK has an individual output. Master version All tasks together (13 major tasks, at present) Comprehensive overview This includes all of the detail from the Project Plan together with references to previous iterations, history of the revision, and other relevant and associated information

Conclusion The purpose of the project plan update was: Detailed information on new and modified streams of work, activities and tasks Updated start and finish dates as well as intermediate milestones Fully specified interdependencies between tasks Formal designation of responsible persons/required resources Updated mechanisms for reporting results and deliverables As a living document, update of the Project Plan will remain an ongoing process

Acknowledgments We would like to specifically acknowledge and thank The different Collaborating Centres and the RSG-SEG who participated in the development of the Project Plan, and gave their constructive feedback.