CSEP NExA Update Marie Clark ScottishPower 28th September 2006.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

Application of User Pays Principles to Existing Service Lines 22nd November 2006.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
THEFT OF GAS TEAM. THEFT OF GAS TEAM PO Box 6803, 31 Homer Road, Solihull, B91 3LT Fax : Free Phone : Seamus Rogers Account.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Nexus Workgroup CSEP Transition Topic June
IGT Single Service Provision Requirements Update – 27 th March 2013.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Proposer: Mark Jones, SSE Panel Date: 20 th February : Mod Title: Amendment to AQ Values Present within Annex A of the CSEP NExA AQ Table Following.
PN UNC Workgroup iGT Services 7 th February 2012.
Distribution Network Interruption - Initialisation 28 September 2010.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Industry Dialogue on xoserve Services 14 th September 2007.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
Customer Charge On behalf of all DNs 19 November 2010.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
User Pays User Committee 12th November 2013
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Introduction of Code Contingency Guidelines Document
Market Trials ChMC 8th August 2018.
Must Read Process Guide For Shippers
Modification Proposal 0192 – Draft Business Rules.
Incentives 26 September 2018.
Modification th July 2008.
UNC Mod 273 – Governance of Feasibility Studies
Connected System Exit Points Administration Options
New project process – timescales
CSEPs Reconciliation Proposals
Exit Capacity Substitution and Revision
Code Administration Code of Practice
Proposer: Marie Clark, ScottishPower Panel Date: 16th January 2014
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
Joint Office Presentation for Modification 0678
UNC Modification Proposal 0362
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Introduction of Code Contingency Guidelines Document
AUG Query Responses 21st November 2013.
Proposed Transitional Gas Exit Arrangements
Connected System Exit Points - Update
Richard Fairholme Transmission Workstream 4th September 2008
UK Link Replacement Programme additional supporting UNC modifications
Lessons Learnt UKLC - November 2015
CSEPs SPA Rejections November 2007 update
Modification 421 – Updates and Benefits Case
AQ BTU Form – Process & Timeline 29th September 2009
CSEPs SPA Rejections December 2007 update
Modification Proposal 136
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Modification 440 Project Nexus iGT Single Service Provision
Customer Issue Management CoMC Update
CSEPs SPA Rejections January – August 2007
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Customer Issue Management CoMC Update for June 2019
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
DSC Change Committee Update
Customer Issue Management Dashboard CoMC
Presentation transcript:

CSEP NExA Update Marie Clark ScottishPower 28th September 2006

Current Situation – Annex A Modifications iGT Network Codes FMRs produced – overwhelming Shipper support Only one iGT has provided legal text Follow-up communication sent to remaining iGTs requesting suitable legal text - limited response iGT UNC – iGT request for suspension of “live” Modifications Ofgem confirmation that Modifications should proceed UNC Modifications Mod 83 implementation effective from 1/10/06 CSEP NExA Approach made by National Grid on behalf of DN Owners to obtain agreement from iGTs to remove Annex A obligations Revised AQ Table not yet implemented (Mod 75) NOTES:

Further Modifications Live Modifications – iGT Network Codes Obligation to provide complete, timely and accurate data updates to Large Transporters where Nested CSEPs exist – Issued 22/9/06 Draft Modifications – iGT Network Codes Insert Obligation for iGTs to publish and maintain a coordinated register of pipes LMN AQ Updates - Rejection Resolution LMN AQ Updates - Reporting Requirements Future Modifications – UNC Introduce Standard of Service for Resolution of iGT LMN AQ Update Rejections

UNC Modification - Introduce Standard of Service for Resolution of iGT LMN AQ Update Rejections Current Situation NExA does not include any obligations or incentives in relation to data submission or rejection resolution xoserve rejection analysis demonstrates large scale issues with quality and accuracy of iGT updates i.e Aug 06 records submitted - 16687 Accepted – 9402 Rejected - 7285 No incentives to resolve rejections within reasonable timescales Impact Misallocation of gas and transportation charges across market participants