ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11

Slides:



Advertisements
Similar presentations
Presenter: Kenny Haulk
Advertisements

Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet Design ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
ECE 101 Innovative Education-- snaptutorial.com
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Progress Report ECE 4006 Harsh Sopory
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Status update and testing
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11 PROGRESS First Rx Board Assembled Started first TX Board Assembly Trouble shooting Getting a signal !!!!!!!! Received connectorized VCSEL (Thank you G5!) Meeting w/ Dr. Brooke TX and RX modifications Order connectorized PD PLANNED WORK week #Nov. 18th – Nov. 25th Complete Assembly Continue trouble shooting Finish TX and RX alignment tolerance testing Complete TX and RX error rate testing (connectorized) Start 2nd Build ????? Start Final paper Presented by: Casey Brister

TX Board Issues

RX Board Issues

TX Schematic View of Changes

RX Schematic View of Changes

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10