GLAST Large Area Telescope

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 6.1 Ground Operations Software 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ISOCMonthly Status Review - ISOC, 1 August GLAST Large Area Telescope Instrument Science Operations Center Monthly Status Review 1 August.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
RFA 18 – Automation of Operations Software Specific Request –Specify plans and requirements for automation of operations software, and describe the software.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
LAT ISOCDOE Status Review, 12 Oct GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center.
GLAST LAT Project ISOC Subsystem1 Response to Peer Review RFA 6  Request: –Need to provide more information on the planned and actual staffing profiles.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
GLAST LAT ProjectMonthly Status Review - ISOC, 1 September GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status.
At A Glance VOLT is a freeware, platform independent tool set that coordinates cross-mission observation planning and scheduling among one or more space.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center ISOC Staffing and Costs Rob Cameron Stanford Linear.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project SLAC-NRL Data Connection for GLAST Environmental Test 3/15/05 1 GLAST Large Area Telescope: SLAC – NRL Data Connection for the GLAST.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
SCT Project Management Issues
JSOC Status at SDO PSR-1 January 21-22, 2009 GSFC
Systems Analysis and Design in a Changing World, 4th Edition
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
Lessons Learned and Earned Value Management System Assessment
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
LAT Operations Scenario Subsystem Meetings
Integration and Test Organization Chart
GLAST Large Area Telescope: I&T Test Readiness Review
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review 27 January 2005 Rob Cameron rac@slac.stanford.edu 650-926-2989

Management Staffing and budget plans for ISOC being reviewed for FY2005, 2006 and beyond Offices in Building 210 almost ready for ISOC occupancy First 2 ISOC development workstations have been delivered, and will be installed in 210 in the next week 2 more offices in 210 will be available in about 1 month, for ISOC use as staff offices: Culp; Bator/Cameron Scoping ultimate workstation and other equip needs for ISOC operations area: UPS, firewall, servers. Facility space: costing process going ahead for ISOC facility in KAVLI layout details resolved with Stanford Dept. of Capital Planning, who oversee KAVLI project layout will be costed by KAVLI construction contractor; expect result in 2 weeks Plan B: working with SLAC management to use office space in Building 84 vacated by KIPAC, plus additional lab space for operations area

ISOC Ops Facility Concept - KAVLI

RFAs 6 of the 8 CDR RFAs now closed Remaining RFAs Red and yellow limit definition: ISOC still working with Systems Eng to obtain limits Launch critical support plan: concept has been distributed to Group Ops, and details will be coordinated

Fastcopy Installation Received 2 Fastcopy licenses for ISOC Installation on LAT servers GLAST02 and GLAST03 in SCS had problems, perhaps related to dual-processor servers. ISOC had been testing Fastcopy on single processor machines using temporary licenses without problem. Problem has been reported to vendor.

ISOC Design Progress ISOC Data Flow review Internal ISOC review completed for data flow designs "External" reviews with SLAC staff completed: Mission Planning L0 File Ingest L0 Data Processing Logging Remaining external reviews: LAT Configuration L1 & L2 Data Processing L1 & L2 Transmission to GSSC Telemetry Monitoring Trending These reviews resolve issues between ISOC designs and other related planning

ISOC Data Flows (1)

ISOC Data Flows (2)

SAA Boundary Definition for LAT Recap from last month Uses AP8MIN trapped radiation model from NSSDC SAA boundary defined by 12-segment polygon hand fit to proton flux = 1 p/cm^2/s for protons with E > 10MeV. This roughly corresponds to ~doubled LAT background rate of 10kHz, for Aeff = 10,000cm^2 Based on IGRF for 2005 epoch study details at http://www.slac.stanford.edu/~rac/SAA This month Obtained and installed TPM radiation model from SEE group at MSFC Reported as providing improved trapped proton modeling source code not available; executables designed for calculating orbit dosages, not well structured for boundary mapping latest IGRF epoch still 2005 Coefficients for 2005-2010 epoch IGRF now available at http://www.ngdc.noaa.gov/IAGA/vmod/igrf.html

SAA region boundary

Database Development Interface improvements Static trending web pages generated from Perl replaced with dynamic ColdFusion pages Now can use JAS3/AIDA tags in ColdFusion web pages, to include better plotting and graphics capability (ColdFusion graphics are too primitive for LAT needs) I&T support Still waiting for real data from Flight Calorimeter testing to appear To assist this process and help SVAC and other LAT elements, ISOC is cooperating with I&T/Online to have I&T data transferred in flight-like CCSDS format, to exercise realistic data ingest and distribution. This process is just starting: requires LATTE mods and additional pipeline tasks, but has payoff of producing flight-like tools for flight-like data

Other January Activity Ops Data Products ICD FITS message builder developed and used to deliver prototype LAT timeline package to GSSC: several ICD issues revealed ICD scrubbed and comments submitted Supported Pipeline and Data Server workshop ISOC test planning Supporting I&T planning for EGSE needs Draft developed for ISOC test environment phases, to help alleviate schedule pressure on LAT testbed, for FSW benefit ISOC sees a real benefit in VSC model for EGSE interface, and supports a VSC-based test environment A dedicated VSC test-stand for the ISOC?

Near Future Activities Ground Operations TIM at GSFC, 1-2 February 2005 Some topics: Ground system test plan and schedule review Data flow Network security PROC development and test MOC facilities and L&EO planning Fastcopy ITOS Data integrity Key near-term milestones for ISOC: ISOC s/w release 1: 28 April 2005 GRT#2: 15 June 2005