Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for.

Slides:



Advertisements
Similar presentations
Looks normal Elevated scan readings suggest other wise.
Advertisements

Peterson Product Support
RISER SETUP NOTE: All levels of the riser are connected using the same method:
Off Highway Truck Wheel Retracting Chock Holder. Purpose To have wheel chocks readily available on each truck To have wheel chocks readily available on.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Product Description: The “Encompass” Enclosure “A unique, patent pending, stylish enclosure system that enhances the appearance of your golf car and offers.
Vent window installed. Install door frame side latch.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
November 11,2004 Piston Temperature Profile CAT-1P & C13 James McCord.
ER-2 Briefing. ER-2 Specifications ER-2 Typical Flight Profile.
Fuser Oil Replacement Instructions for replacing the fuser oil cartridge for your Ricoh 2232 / 2238 (takes about 5 minutes) Click your mouse or press your.
Network Storage and Appliance Box Build By: Cubatic Engineering 01/09/2015.
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
Election Commission of India
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
National Aeronautics and Space Administration (NASA) Glenn Research Center Space Acceleration Measurement System (SAMS) Support for 3D Printing in Zero-G.
Equipment and Tool Institute June 18, Challenger Body Structure Diane Coopmans, Body Structures Engineering.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Colorado Chapter #5 REALTORS ® Land Institute Replace this text with Property Name Have: Replace this text with property description Acres:Replace this.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
400A & 600A Heavy Duty Safety Switch NEMA 4X, NEMA 12 Replacement Instructions for Vault Handle and Linkage Assembly.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Thomas Jefferson National Accelerator Facility. Actions: Procedures For IOC Application Development, Testing, and Installation Tools: Shell scripts, Perl.
A View from my window STEP1: Taking photos for views from classrooms windows STEP2: Writing descriptions for the views. STEP3: Sending the students written.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Lock change and lock box photo requirements All rights to this document are reserved by North Georgia Services. Following this procedure will ensure that.
Mission Integration OZ2/Susan Lufkin/(281) Page No. 1 International Space Station Cube Lab Cube Lab Ops TIM - Ops Assessment Status 11/19/2009.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #34 July 23, 2013 Tim Horvath Payload Ops Director
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
Baseline Review 05/20/14 PARC/Martha Cash RapidScat EPF-SDX INSTALLATION-HEATERS ON ADAPTER and INSTRUMENT Crew Commanding Unattended Time Critical External.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
MSG Laptop Computer (MLC) Transition to A31p Thinkpad.
National Aeronautics and Space Administration Microgravity Science Glovebox (MSG) Seal Exchange Overview February 2, 2006.
Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S.
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Maintenance of, or to Change a faulty MCB (motor control board) 2010 models onwards.
Colorado Chapter #5 REALTORS® Land Institute
Replace this text with Property Name
Hybrid Electric/Hydraulic Vehicles
Changing Combinations on a Security Container
External Payload Installation Challenges
1. Open any Office 2016 app, such as Word, and create a new document.
International User’s Conference September 2017
Easycliner (Motorized Version) Assembly Instruction
Heavy Duty Safety Switch Replacement Instructions for
BUY FURNITURE ONLINE  HOME FURNITURE  OFFICE FURNITURE  BEDROOM FURNITURE  CONSOLE TABLE & C TABLE  PHOTO FRAME.
Why We Arrived With Windows Upgrade Support ?
Adjusting Tilt and Turn Inswing Door or Window
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
LF856 2½”-10”.
Ашық сабақ 7 сынып Файлдар мен қапшықтар Сабақтың тақырыбы:
Windows басқару элементтері
Replace this text with Property Name
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Installation of New Officers
Презентация құру тәсілдері
Қош келдіңіздер!.
Информатика пән мұғалімі : Аитова Карима.
PPB1 B6 B5 B4 B3 B*s*, B*s* long, short rear, front front rear 1 1 1
Presentation transcript:

Description of RFW Removable Front Window (RFW) will replace current window with no modification to the MSG Work Volume Structure (estimate 1.5 Hours for installation of RFW).

Description of RFW Removable Front Window can be removed with the release of 8 latches during nominal payload operations. RFW Installed on Frame RFW Frame

RFW IVT/HFIT Removable Front Window (RFW) IVT and HFIT was completed with no issues using the MSG Engineering Unit (EU) at MSFC on 03/31/2016. Installation procedure used by HFIT & Crew Office representatives. RFW Installed on Frame

RFW IVT Installation and Removal Photos RFW Frame Prior to Installation Front View of Window (latch pins retracted) RFW Frame installed RFW Latch Pin “Engaged/ Sealed” Rear View of Window (latch pins retracted) RFW Latch Pin “Located”