Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
DRAFT HCAL digital optic link and trigger mapping DRAFT.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
US LHC Detector M&O Evaluation Group, February 5-6, 2004: Trigger1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
US CMS DOE/NSF Review, May Trigger C&S Parallel - W. Smith1 Trigger Cost, Schedule Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Wesley SmithAug. 18, 2010 Trigger Budget Review: Labor & M&S - 1 US CMS FY 2011 Budget Review Trigger Labor & M&S Wesley Smith Aug. 18, 2010 Outline Overview.
W. Smith, US LHC Detector M&O Evaluation Group, January 18, 2006CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
W. Smith, LPC Meeting, February 17, 2006 CMS Trigger - 1 US CMS Trigger 2006 LPC Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
W. Smith, U. Wisconsin, IEEE, November 1, 2006 CMS Regional Calorimeter Trigger - 1 The CMS Regional Calorimeter Trigger Electronics Integration W. H.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
W. Smith, US LHC Detector M&O Evaluation Group, January 28, 2005CMS Trigger - 1 US CMS Trigger DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
W. Smith, US CMS Meeting, April 8, 2006 CMS Trigger - 1 Click to edit Master title style US CMS TriDAS 2006 US CMS Meeting Wesley H. Smith, U. Wisconsin.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
19 Apr 2007DAQ Readiness1 Paul Dauncey. 19 Apr 2007DAQ Readiness2 DAQ hardware layout ? More CRCs New HCAL stage May not be used.
CMS DAQ project at Fermilab
University of Wisconsin
TOTEM Electronics Status
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
CMS EMU TRIGGER ELECTRONICS
Electrical and electronic systems projects
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
SLB Synchronization in H4 Beam (LIP - Lisbon)
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Status of CO2 Cooling tests at CERN for Pixel phase 1
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
UK CMS Oversight Committee Mtg
Equipment Management DB Rack Wizard USC55 Underground Counting Room
Plans for the 2004 CSC Beam Test
Agenda modifications.
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
ME I&C -- PC Electronics
Presentation transcript:

Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin Back of Regional Cal Trigger crate Front of EMU Track-Finder crate L1A signal out of crate Fully functional EMU track finder trigger running at CERN Triggered EMU, RPC, HCAL in structured test beam Fully functional complete Regional Cal Trigger Crate running at CERN Ready for integration with HCAL, ECAL, Global Cal Trigger

Trigger M&O Plans -- Florida, Rice, UCLA, Wisconsin Operate fully functional trigger electronics at CERN Both CAL and EMU trigger systems Employed in myriad tests & preparation activities Tests in Electronics Integration Center Labs & row of racks for all electronics subsystems Test interfaces & integration as much as possible before move to USC55 Surface & “Magnet” tests in SX5 With both HCAL and EMU More during magnet test Verify trigger functions & interfaces w/detectors on surface. Final trigger & timing infrastructure Installation in Underground Counting Room (USC55) Expect start by Nov 30 ‘05 --”ready for crates” Racks & Infrastructure installed Trigger Upgrade R&D Start initial design work & technology investigations Underground Counting Room