Network Code on Capacity Allocation Mechanisms (Reg.984/2013)

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

15 November th SG meeting Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
15 November th SG meeting Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms.
1 13 th December 2013 Teleconference 25 th IG Meeting South Gas Regional Initiative.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Proposer: Matthew Hatch Panel Date: 15 th May : EU Capacity Regulations – Capacity Allocation Mechanisms with Congestion Management Procedures.
EU Workgroup – Mod 500 Action 703 – confirm current capacity surrender process.
Draft CMP ROADMAP 19 SG meeting 30 th April 2013.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
25 th IG meeting 13 th December 2013 Enagás, REN and TIGF Issues to be discussed.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
CMP PROPOSAL FOR HARMONISATION Madrid 11 th July 2011.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
EU Phase 3 Customer communications
29th November 2016 Teleconference
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Public Consultation : main conclusions (1/2)
GRI North-West Meeting
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
25th IG meeting 13th December 2013
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
EU Tariffs Code Update Based on Refined Draft as of 30th October
Proposer: Matthew Hatch Panel Date: 20/10/16
13th December 2013 Teleconference
RO-HU-AT - a pilot project for incremental capacity
20th April 2016 Teleconference
26th IG meeting 23th January 2014
4th October 2016 Teleconference
Allocation of Capacity in Portugal Under the New Regulation
Background and Process
CMP Transparency Requirements
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
37th IG Meeting South Gas Regional Initiative
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
GRI North-West Meeting
20th April 2016 Teleconference
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
RO-HU-AT - a pilot project for incremental capacity
EWRC-RAE MUTUAL PROJECTS
Transparency in the Energy Community Contracting Parties
20th April 2016 Teleconference
29th April 2014 Teleconference
RO-HU-AT - a pilot project for incremental capacity
4th October 2016 Teleconference
Questionnaire for the assessment of the main features of
37th IG Meeting South Gas Regional Initiative
RO-HU-AT - a pilot project for incremental capacity
GRI North-West Meeting
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
EWRC-RAE MUTUAL PROJECTS
EURELECTRIC transparency requirements
EWRC-RAE MUTUAL PROJECTS
Presentation transcript:

Network Code on Capacity Allocation Mechanisms (Reg.984/2013) Overview and forthcoming updates

Outline General provisions i.e. applicability Principles of cooperation Allocation of firm capacity Bundling of capacity Incremental capacity process Interruptible capacity Capacity booking platforms

General provisions Applicability: as in CMP Annex to Regulation 715/2009! for existing (technical and interruptible as well as additional capacity released through CMP measures) and incremental capacity Incremental capacity: possible future increase via market- based procedures in technical capacity or possible new capacity…that may be offered based on investment in physical infrastructure or long- term capacity optimization and subsequently allocated subject to positive outcome of an economic test, in the following cases: at existing IPs, by establishing a new IP, as physical reverse flow capacity at IPs, which has not been offered before

Principles of cooperation coordination of maintenance standardization of communication capacity calculation and maximization: TSOs shall establish and apply joint method to calculate maximum technical bundled capacity Exchange of information between adjacent TSOs (nomination, re-nomination, matching and confirmation, maintenance; link to IO NC)

Allocation of firm capacity (1) auctions to be used at all IPs, except where alternative allocation methodology is applied (Artr.30, for incremental capacity) 20% of technical capacity to be set aside (if available): 10% to be offered not earlier than in the annual yearly capacity auction, 10% no earlier than the annual quarterly capacity auction for incremental capacity: 10% not earlier than quarterly capacity auction capacity created via non- market based procedures and for which the FID has been taken without prior commitments from network users shall be allocated as available standard capacity products (as described in the CAM Regulation)

Allocation of firm capacity (2) standard capacity products: yearly, quarterly, monthly, day- ahead and within day applied capacity unit: kWh/h or kWh/d Auctions: annual yearly (for 5 to 15 years, for incremental capacity 15 years after the start of operational use), annual quarterly, rolling monthly, rolling day- ahead and within- day Auction algorithms: ascending clock for yearly, quarterly and monthly uniform price auction for day- ahead and within- day

Bundling of capacity TSOs to bundle firm or incremental capacity available at both sides of the IP single allocation and nomination resold as bundled on secondary market virtual interconnection point: where 2 or more IPs connect the same 2 adjacent entry- exit systems alignment of terms and conditions for bundled capacity products bundling in case of existing transport contracts (network users shall aim to reach an agreement on bundling of capacities; existing transport contracts for unbundled capacity cannot be renewed, prolonged or rolled over after their expiration date)

Incremental capacity process Source: ENTSOG

Interruptible capacity offered if firm capacity is not available, via auction (except within- day interruptible- only nomination) minimum interruption lead times coordination of interruption process sequence of interruptions reasons for interruptions

Capacity booking platforms (1) TSOs to offer capacity by means of one or a limited number of joint web- based booking platforms if TSO cannot decide within 3 months after new CAM NC entries into force which platform to use for an IP, NRAs will need to decide; if NRAs cannot agree, ACER will decide (for the period not longer than 3 years)

Capacity booking platforms (2) Source: ENTSOG

Thank you for your attention! www.energy-community.org

Annex 1 Source: ENTSOG Name of the Event

Annex 1 Source: ENTSOG Name of the Event

Annex 2 Source: ENTSOG Name of the Event