LHC Morning Meeting - G. Arduini

Slides:



Advertisements
Similar presentations
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Advertisements

CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Tuesday 22nd January - morning
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday morning 09:30 Dump of pPb fill.
Coordination by E. B. Holzer & J. Wenninger Production
LHC Morning Meeting - G. Arduini
Mike Lamont, Jorg Wenninger
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Yesterday’s morning’s controls issues
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

LHC Morning Meeting - G. Arduini Tue 05/02 7:35 dump by BPMS in IP6 Filling rather slow due to frequent latches of the injection quality check due to position at BPMI.87204 Attempts to improve the situation by steering the transfer line not successful 09:36 ready to ramp Capture losses at ~50% at the beginning of the ramp B1H B1V 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 10:04 Beam dump when switching ON the OFB after cogging. Structure appeared in point 8 likely resulting from bad BPM readings (BPMS.2L8.B1 – V- reading between 0 and 2 mm) 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 Some non closure in the attempt of the OFB to correct it resulting in higher losses at the collimators and beam dump due BLMQI.11R7B1E10_MQ (0.65 ms running sum) Analysis of the orbit at the end of the cogging process for the previous two fill (including the dump over night) indicated similar behaviour. Decide to run without BPMS.2L8.B1 (V) and unchanged OFB bandwidth 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 BLM Monitor factor (MF) change as agreed by rMPP meeting this morning: - BLMQI.11R7.B1E10_MQ from 0.3 -> 0.45 - BLMQI.09R7.B1E10_MQ from 0.3 -> 0.45 - BLMEI.09R7.B1E21_MBA from 0.1 -> 0.3 - BLMEI.09R7.B1E22_MBA from 0.1 -> 0.3 - BLMEI.09R7.B1E22_MBB from 0.1 -> 0.3 - BLMEI.09R7.B1E23_MBB from 0.1 -> 0.3 - BLMEI.09R7.B1E24_MBB from 0.1 -> 0.3 to give some more margin IQC BPM tolerances updated. Injection oscillations and losses OK  no more systematic latches Filling slowed down by QPS communication problems (not understood) and poor ion beam quality (LEIR) 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 Again important losses at the beginning of the ramp likely exacerbated by the long time spent at injection This time no structure on the orbit in point 8 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 13:48 Stable beams #3529 15:57 Trip of Sector 12 (RB.A12). End of fill #3529. From R. Denz: Stuck bit in interlock driver circuit identified as possible source (=radiation induced fault). LHCb polarity switch to positive UA23.RCD.A12B2 - EE system did not open on FPA request during event of 15:57:02. At 18:30 a PIC test was performed and the system reacted normally but origin of the problem not understood leave this circuit off until further analysis of the problem. 19:39 Start filling. Injection frequency for protons and ions to minimize losses in the ramp 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Tue 5/2 – Wed 6/2 21:35 PS RF problem during filling 22:30 Beam back. Dump and refill 23:59 Still important capture losses at the beginning of the ramp inspite of the capture tuning. Beam dump (BLMs in point 3). Disable the batch by batch longitudinal blow-up at injection. Longer bunches from the SPS? 02:36: Large OFB correction at flat-top BPMS.2L8.B1 (V) was misteriously enabled!!. Beam dump. 18/11/2018 LHC Morning Meeting - G. Arduini

LHC Morning Meeting - G. Arduini Wed 6/2 Again issues with the quality of the ion beam in the injectors. Several injections are inhibited. Lengthy filling. Had to dump and refill. 05:20 Ramp. This time with acceptable losses (35 %) 06:08 STABLE BEAMS #3533. 18/11/2018 LHC Morning Meeting - G. Arduini

Stable Beams Statistics Fill Day Peak L [1028 cm-2s-1] Stable beam [h] Int L [nb-1] Dump reason # bunches [Pb/p] 3523 Mon 4/2 7.2 4:22 0.74 BPMs IP6 192/216 3524 7.4 3:14 (+0:33) 0.43 3525 10 2:09 0.64 Trip of RQTL9.R3B2 338/338 3527 Tue 5/2 1.04 3529 2:08 S12 trip 3533 Wed 6/2 10.7

Plan VdM scan for ALICE and time permitting CMS: 200ns_338Pb_272p_15inj_24bpi Second fill for VdM to be confirmed (ATLAS) Go back to physics 338/338 Wait for confirmation of rest of the programme (ALICE polarity switch and pp intermediate energy run)

Pending Access to install attenuators for BBQ/HT and other instrumentation (2 hours) BSRT test with high intensity 50 ns proton beam (up to 1380 bunches with >1.4x1011 p/b) – 4 hours Accesses for quench test: Scope installation in IP6 (12L6). 2 hours. It has priority over Q6L8 scope installation because we will need it on Monday morning (the first quench test). To be confirmed whether it can be done before high intensity tests/pp physics at intermediate energy Fast measurement system on RQ6.L8 (30 min in the UA83 by Jaromir Ludwig). Ramp to 300 A afterwards.

Setup J. Wenninger Offline: Online: Prepare ramp to 1.38 TeV based on truncated 4 TeV ramp. Collision BP. Settings of IR7(3) collimators to be defined. Online: Reverting to high-intensity proton OP  1 shift ? 1 cycle with probes for checkout, optics measurements. 1 cycle with 3 nominal bunches for collimator setup (TCTs), collision setup, first loss maps & asynch. dump test in collision.  1½ - 2 shifts. 2 cycles to complete off-p /betatron loss maps  1 shift. Setup time ~ 24+ hours. Plus 2 hours of access to set-up for the higher intensity LHC 8:30 meeting 11/18/2018