Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems

Slides:



Advertisements
Similar presentations
Beckett Energy Systems
Advertisements

LP33 Series UPS kVA 400Vac/CE
Net Metering and Utility Interconnection Presented by : Bill Brooks Brooks Engineering.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, 8・5 - Field Inspection Items Visual inspection and verification.
Sustainable Energy Systems Engineering Peter Gevorkian Ch 2: Solar Power Generation Design Brevard Community College EST1830 Bruce Hesher.
Farid Katiraei Ph.D. Candidate
POWER PLANT USED IN TELECOM
InnovationValueTeamwork SHENZHEN INVT ELECTRIC CO., LTD.
IEEE 1547: The DG Interconnection Standard
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
المــــركــز الوطنــــــي لبحــــــوث الطـــاقــــــة National Energy Research Center Commissioning Tests & Inspection of PV Systems According to IEC
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
05/18/001 N.Treadway Distributed Resources and Competitive Energy Markets in Illinois Workshop Session III, “Interconnection Issues” Thursday, May 18,
Designing Solar PV Systems ( Utility Scale). Module 1 : Solar Technology Basics Module 2: Solar Photo Voltaic Module Technologies Module 3: Designing.
Grid connection of distributed generation
Powered by the Sun, Sustainable through Quality. Who is Suncolect Suncolect provides Solar electricity solutions to entrepreneurs in small, medium and.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
1. 2 PRODUCTS OF C.E.L Solar Photovoltaic Cells Solar Photovoltaic Modules Cathodic Protection Electronic Ceramics Railway Electronics Microwave Electronics.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Creating sustainable change through education, communication and leadership© 2016 GSES P/L Training Consulting Engineering Publications Inspections of.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
Common Problems with Performance/Testing of Batteries
Ground Bond and Ground Continuity Testing
Renewable energy support schemes in the Republic of Moldova
Chapter 8. Electrical Systems
ROOFTOP SOLAR PHOTOVOLTAIC SYSTEM
Sub Station.
SOLAR GRID-TIE SYSTEM
Photovoltaic Systems Engineering Session 21
Photovoltaic Systems Engineering Session 19
Photovoltaic Systems Engineering Session 27
Basics of interfacing PV to the Grid
PV System Quality and Performance
One Line Diagram Example
[Project Name] One-Line Drawing
Solar Rooftop Types and Standards Dr
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Rooftop Solar Net Metering: Regulatory Impact Dr
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Indian Grid Code and Commissioning Test Procedure Dr
Photovoltaic (PV) Systems
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Personal Protective Equipment
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Net Metering John McComb: P.E.
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
Interconnection of AES With The Grid
Photovoltaic Systems Engineering Session 16 Solar+Storage Systems
Photovoltaic Systems Engineering Session 12
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Net Metering John McComb: P.E.
Waleed Iftikhar Michel Mabano
Stand alone vs. interconnected
Components inverters Except where otherwise noted these materials are licensed Creative Commons Attribution 4.0 (CC BY)
Solar Energy Commercialization Utility Scale Solar Development
SMART Program Specific Metering Wiring Diagrams May 2019
Photovoltaic Systems Engineering Session 23
Electrical components and systems
Dominion Energy South Carolina: Solar Equipment Requirements
National Institute of Wind Energy(NIWE)
Presentation transcript:

Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems Technical & Economic Fundamentals 2018-Ahmadabad, Jammu, Shimla, Dehradun www.renac.de In cooperation with: In cooperation with: 4 Dr. Sudhir Kumar

Indian Grid Code and Commissioning Test Procedure 4 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Large SPV Power Projects Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

IEC – 62446 - Grid connected photovoltaic systems IEC 62446 standard consists of two parts System documentation requirements: Details the information that has to be provided, as a minimum, within the documentation provided to the customer following the installation of a grid connected PV system Verification Provides the information expected to be provided following initial (or periodic) verification of an installed system. It includes requirements for inspection and testing. Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

IEC – 62446 - System documentation requirements Single wiring diagram Array general specifications PV string information Array electrical details Earthing and overvoltage protection AC system Module datasheet for all types of modules used in the system – to the requirements of IEC 61730-1 Verification Inverter datasheet for all types of inverters used in the system Datasheet for array mounting system Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

IEC – 62446 - System verification DC system inspection Protection against overvoltage/electric shock AC system Labeling and identification All these may not be applicable for Rooftop Solar They are more relevant to commercial projects However, basic principles are same Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Rooftop Solar Power Projects (Guideline by respective SERCs) Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Documentation Checking Whether proper site survey has been done? Check site feasibility report. Check technical pre-feasibility report e.g. PVSyst etc. Whether the materials fulfill the IEC, IS or MNRE specifications? Check module IEC certificates. Check mounting structure certifications. Check all electrical items certifications. Check on-site monitoring and remote monitoring system specifications. Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Pre-commissioning tests of all electrical equipments Specific points to be considered during commissioning are: Continuity checking and insulation resistance measurement of cables. Proper crimping, lugging and glanding of cables before final terminations. Checking of all electrical terminations for any loose contacts. Proper earthing of electric equipment & solar array to be ensured. At junction box in solar array, voltage levels to be checked (between positive & negative terminal, positive to earth and negative to earth) in consultation with inverter OEM. Inverter to be checked in testing mode and after No Fault indication is displayed on LCD it is to be connected to grid/battery. Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

State Electricity Regulatory Commissions: Guidelines 23 states and 6 UTs issued rooftop net metering orders Points common to all: DISCOMs to permit on a nondiscriminatory and ‘first come, first serve’ basis All residential, commercial and industrial consumers are eligible MNRE/State subsidy if available may be availed SPV plant as per MNRE tech spec Energy Injection Voltage Restriction: As per SERC Interconnection as per CEA Tech Spec No banking, wheeling and cross subsidy charges Tariff as per SERC in a given year Interconnection agreement for 20-25 yrs RPO to be claimed by utility Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Energy Injection Voltage Restriction: Example Uttarakhand Every State has its own regulation Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Energy injection voltage restriction: Example HP Every State has its own regulation Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Applicable standards & regulations for grid connectivity Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013 IEEE 1547 – Standard for Interconnecting Distributed Resources with Electric Power System, 2011 Central Electricity Authority (Measures Relating to Safety and Electricity Supply) Regulations, 2010 Central Electricity Authority (Technical Standards for Connectivity to the grid) Regulations 2007 IEEE 519: Recommended Practice and Requirements for Harmonic Control in Electric Power Systems, 2014 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Consumer Meter and Net-Meter (RE meter) Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 and Amendment, 2014 Amended applicability – Applicable to all grid interactive RE plants seeking connectivity with the grid at 415 V and below voltage level RE meter concept: RE meter means a meter used for accounting and billing of electricity supplied to and from the consumer. Above 415 V grid meters: The regulation of 2006 applicable Location of Meter – Gross Meter at outgoing feeder from RE plant. Net-meter at location of consumer meter RE Plant with battery - RE plant can supply the consumer load if grid fails. Automatic isolating mechanism is must for islanding from the grid Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection technical specifications and requirements General requirements: Voltage Regulations – The distributed resources shall not actively regulate the voltage at the point of interconnection. Synchronization – The distributed resource synchronised with electric system shall not cause a voltage fluctuations at the point of interconnection greater then ±5 % . Monitoring Provision – Each distributed resource of 250 kVA or more at a single point of interconnection shall have provisions for monitoring its connections status, real power output, reactive power output and voltages at the point of interconnection. IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection technical specification and requirements General requirements: Isolation device – there should be a manually operating isolating switch between distributed generation resource and electric system, which shall meet following requirements: allow visible verification that separation has been established Indicators to show clearly closed and open position Be capable of readily accessible and be capable of being locked in open position May not be rated for load-break nor have feature of over current protection Be located at height of 2.44 m above ground level IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection technical specification and requirements General requirements: Interconnect integrity Interconnection system shall have the capability to withstand electromagnetic interference Paralleling device shall withstand 220% of interconnection system rated voltage Interconnection system shall have the capability to withstand voltage and current surge IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection technical specification and requirements Response to abnormal conditions : Voltage – Inverter must have over and under voltage trip functions if voltage reaches above 110% or below 80% respectively with clearing time up to two seconds. Frequency – Inverter must have over and under frequency trip functions if frequency reaches 50.5 Hz and below 47.5 Hz with a clearing time of 0.2 seconds Islanding – Inverter must have function to prevent formation of unintended island, and cease to energize the electricity system within 2 seconds IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection technical specification and requirements Power quality: Limitation on DC injection – The rooftop solar and its interconnection system shall not inject dc current greater than 0.5% of the full rated output current Limitation of flicker – The distributed resource shall not cause objectionable flicker on the electric system (IEC 61000) Harmonics – The distributed resource shall not inject harmonic current greater than 5% at the electric system (IEEE 519) IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Interconnection test specification and requirements Interconnection installation evaluation: Isolation device – A system design verification shall be made to ensure that the requirements have been met Monitoring provision – A system design verification shall be made to ensure that the provisions for monitoring are in accordance with the requirements Grid fault – A system design verification shall be made to ensure that in case of grid fault the solar inverter shall cease to energize the grid to which it is connected. Grounding integration with grid – A system design verification shall be made to ensure that solar inverter shall not cause over voltage and shall not disrupt the coordination of the ground fault protection connected to the grid. IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Commissioning tests All commissioning tests shall be performed based on written test procedures of equipment manufacturer/ system integrator. A visual inspection shall be made to ensure that the system earthing is adequate as per standard/ regulation. A visual inspection shall be made to confirm the presence of the isolation device as required by standard/ regulation. The following initial commissioning tests shall be performed on the installed solar system and grid connected inverter prior to the initial parallel connection to the grid. Operability test on the isolation device Unintentional-islanding functionality Cease to energize functionality IEEE 1547/ CEA Regulation 2013 Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Unintentional islanding functionality test This test must be conducted during noon time in a sunny day. PV system shall produce more than 20% of the rated output of the PV array or the inverter – whichever is less. If there is more than one inverter, tests should be carried out for each inverter. Test 1: inverter must cease supplying power within two seconds of a loss of mains STEP 1: Keep DC supply from the solar array connected to the inverter STEP 2: Place the voltage probe in the inverter side of the AC main switch STEP 3: Turn OFF the AC main switch through which inverter is connected to grid STEP 4: Measure the time taken for the inverter to cease attempting to export power with a timing device and record. Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Unintentional islanding functionality test Test 2: inverter must not resume supplying power until mains have been present for more than 60 seconds. STEP 1: Keep DC supply from the solar array connected to the inverter STEP 2: Place the current probe in the inverter side of the AC main switch STEP 3: Turn ON the AC main switch through which inverter is connected to grid STEP 4: Measure the time taken for the inverter to re-energize and start export power with a timing device and record Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com

Thank You Network Centre of Steinbeis GmbH & Co. (KGfur Technologietransfer, Germany). www.2eskills.com | www.steinbeis.in | www.steinbeisindia.com