Status Report on the Alignment Activities at SLAC

Slides:



Advertisements
Similar presentations
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Advertisements

Procedure for GPS Height Transformation within a Small Local Area
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
LCLS LCLS-II Survey & Alignment
1 Conventional Alignment Now and in the Future Catherine Le Cocq SLAC Metrology Department Alignment Engineering Group NPSS Snowmass Technology School,
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
Prepared using support of U.S. Department of Energy under Contract No. DE-AC02-76SF00515 by the Stanford Linear Accelerator Center, Stanford, California.
BY: FAHEEM MUHAMMAD AUGUST 16,2012 SAVANNAH STATE UNIVERSITY SLAC NATIONAL ACCELERATOR LABORATORY To Develop a Method Using Surveying Techniques & Instruments.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
Topology Cleanup Evaluating MicroStation GeoGraphics GIS Prepared using support of U.S. Department of Energy under Contract No. DE-AC02-76SF00515 by the.
ESR 1.3: status & next steps Vasileios Vlachakis PACMAN meeting 25 June 2015 CERN, Geneva, Switzerland.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
Use of Object-Oriented Programming in Particle Accelerator Alignment* Class Diagram (Booch notation) feedback project input resect interplus closedphoto.
Calibration of the Nikon D200 for Close-Range Photogrammetry
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Catherine LeCocq SLAC USPAS, Cornell University Large Scale Metrology of Accelerators June 27 - July 1, 2005 Coordinate Systems 1 Coordinate Systems Purpose:
KML Placemark Example... BTH / LTU #FEATURES5 1 absolute , , , ,
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg June 18-20, SLAC Tune Tracker/Feedback Mike Laznovsky.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Magnetic Measurements At SLAC
Workshop on Tau-Charm at High Luminosity
LUSI Coordination with LCLS
Remote Sensing, GPS, GIS.
Status Report on the Alignment Activities at SLAC
The SPEAR3 Upgrade Project at SLAC
Maintain a single control room for all accelerator programs
GLAST Large Area Telescope:
The SPEAR3 Upgrade Project at SLAC
LEGO: A Modular Approach to Accelerator Alignment Data Analysis
Barron Montgomery1,2, Christopher O’Grady2, Chuck Yoon2, Mark Hunter2+
CF Organization & Schedule
Network Design What is network design? What are the methods?
Investigations of Digital Levels for High Precision Measurements
SPEAR Summer/Fall Downtime Alignment Schedule
Status Report on the Alignment Activities at SLAC
A summary of world-wide test beam facilities
The 13th International Workshop on Accelerator Alignment (IWAA 2014) Institute of High Energy Physics (IHEP), Chinese Academy of Sciences October
SLAC ARD Test Facilities
Robert Pushor, Catherine LeCocq, Brian Fuss, Georg Gassner
Automatic compression control for the LCLS injector laser
Overview of Alignment Engineering Group Downtime Activities
End Station Test Beam (ESTB) at SLAC
Stanford Linear Accelerator Center
Welcome to the Stanford Synchrotron Radiation Laboratory (SSRL) at the Stanford Linear Accelerator Center (SLAC) * 2575 Sand Hill Road, Menlo Park, CA.
PH3520 / Particle Physics Autumn term 2010 – week 4
Tidal Corrections to Direction Observations
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
PMCS Approach - Past and Current Projects
DOE Review 7-9 February, 2006 Steve Lewis
Undulator Alignment Plan
LCLS Undulator Magnetic Measurements
DYNAMIC APERTURE OF JLEIC ELECTRON COLLIDER
Presentation transcript:

Status Report on the Alignment Activities at SLAC Catherine Le Cocq, Brian Fuss, Robert Ruland Stanford Linear Accelerator Center, Stanford, CA, USA The Stanford Linear Accelerator Center is operated by Stanford University for the U.S. Department of Energy.

Metrology Department Goals Support SLAC physics experiments. Guide all surveying and mapping efforts at SLAC. Promote accelerator alignment technologies inside and outside the laboratory. http://www.slac.stanford.edu/grp/met 11-12-02 Catherine Le Cocq

Current Experiments Future Developments PEP II http://www.slac.stanford.edu/accel/pepii E158 http://www.slac.stanford.edu/exp/e158 SPEAR 2 http://www-ssrl.slac.stanford.edu Future Developments SPEAR 3 http://ssrl.slac.stanford.edu/spear3 LCLS http://www-ssrl.slac.stanford.edu/lcls GLAST http://www-glast.stanford.edu NLC http://www-project.slac.stanford.edu/lc/nlc

SLAC/SSRL Site SPEAR LCLS PEP II e- injector ESA FFTB NLCTA BSY ESB Not to scale! 11-12-02 Catherine Le Cocq

PEP II & BABAR 2000 2002 Stations 604 359 Points 3636 3507 Tracker Triplets 13699 10446 Height Differences 1109 1311 Unknowns 15140 12679 2000 2002 D m 30 50 h m / D 40 v m / D 100 h m 11-12-02 Catherine Le Cocq

SPEAR: Mapping-Fiducialization-Assembly 11-12-02 Catherine Le Cocq

Future 11-12-02 Catherine Le Cocq Clean Room Tower Grid Far hall Undulator Far hall Near hall Clean Room Tower Grid 11-12-02 Catherine Le Cocq

Instrumentation Studies Classical Surveying Instruments Trackers / Total Stations Leveling Gyrotheodolites Others Devices: Offset Tilt Straightness… 11-12-02 Catherine Le Cocq

Model / Software Developments Network Analysis: LEGO Approximate Coordinates Determination New Type of Observation Error Checking Visualization Tool: SIMS Software Packaging: WinGEONET Others: Refraction Studies 11-12-02 Catherine Le Cocq

Mapping Effort X_global Z_SLAC Y_global X_SLAC Z_global ITRF2000 GPS: 3 Leica SR-530 receivers X_global Z_SLAC Y_global X_SLAC Z_global ITRF2000 -2703115.873 -4291767.294 3854247.829 NAD83 -2703115.209 -4291768.558 3854247.785 SLAC 60.54993 -2.41754 * Epoch of ITRF2000 and NAD83: 2002.36 GIS: MicroStation v8 with GeoGraphics 11-12-02 Catherine Le Cocq

Conclusion 11-12-02 Catherine Le Cocq