TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.

Slides:



Advertisements
Similar presentations
How to commence the IT Modernization Process?
Advertisements

Course: e-Governance Project Lifecycle Day 1
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
1 AO Milan 40MM Manufacturing Support Capabilities J. Fine & J. Solgaard January 28, 2004.
A framework for describing IT Project Management Processes and Tool Set Features Enterprise Project Management Framework.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
First Article Inspection
Introduction to ISO New and modified requirements.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
From Research Prototype to Production
Kimball Bullington, Ph.D. - MGMT Materials Management Systems Purchasing Chapter 7.
12-1 Project Management from Simple to Complex This work is licensed under the Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Category #2 Bundling and Unbundling Workgroup September 24, 2007.
OGS Procurement Services Group 2007 State Purchasing Forum IT Procurement.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
TIER IT Inventory CITI Meeting November 6,
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
Global Sourcing Strategies to Achieve Long-Term Success
Food Suppliers Implementation of EDI &PAV March 2010
DLA Contracting for New Suppliers
TeleManagement Forum The voice of the OSS/BSS industry.
Route 2: Strategy Document Template (Powerpoint format)
Software and Systems Integration
Purchasing supplies at CERN
Applying Business Process Re-engineering
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
WSATA = Buy vs Build Software
Health Supply Chain Management: Session 6: Facilities, Staffing and Procurement Ghana Nursing Schools.
Achieving synchronisation through shared information
Procurement’s Impact on Logistics.
First Article Inspection
Application Engineering Role
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
First Article Inspection (Per AS9102)
MRL Assessment Thread A Evaluation
Presented By: Daniel J. Brown, CQA
DoD Automatic Test Systems (ATS) Strategies
AM Intellectual Property Management Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Product Development Scenario Overview
Engineering Services PWS/SOO IP Escrow / Licensing Agreement
Project Ideation Agile Down-to-Earth © 2016.
MARKETING, PURCHASING AND PRODUCTION (7 - 9%)
CIS12-3 IT Project Management
Life Cycle Part & Component Knowledge Sharing Portal
First Article Inspection
Purchasing a Solution Chapter 9.
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
How to conduct Effective Stage-1 Audit
ESA's TEC Directorate Asset Management - Present and Future
Managing Project Risks and Opportunities
Data Provenance in the Additive Manufacturing (AM) Thread Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
First Article Inspection (Per AS9102)
Full Workforce Working Group Full Workforce Working Group
AM Supply Chain Integration
Standards Working Group
CEM 515 Done by: Abdulkarim Sulais
‘Delivering better value from professional services’
DLAD Procurement Notes & Tech/Quality Requirements
Bridging the ITSM Information Gap
Purchasing Overview Purchasing Purchasing Activity
Presentation transcript:

TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018

TEAM NAME

TEAM NAME

TEAM NAME

Engineering Process (include all users) System Level Design Exhaust Logistics options, look at conventional approaches Services Engineering (PMA / PEO) provide historical data Go back to prime (Drawings, Design Notebooks, Test reports, etc) Determine Loads and Environmental Conditions (Conditional) Engineering Assessment – Model and Test (Engineering Review) Evaluate for materials impact Special conditions for Additive Manufacturing Evaluate for conventional alternatives Air Worthiness (Ground / Flight test) Engineering Process has Not Changed TEAM NAME

Manufacturing & Quality Manufacturing process development (Engineering Review) Proof of manufacturing Verification & Validation Approval of the manufacturing process Material qualification / specification Quality Plan / Acceptance AM process control (machine calibration, training, prevent maintenance) – lock down Machine Qualification / Reliability / Repeatability Process control on dimensions (4 sigma) Manufacturing & Quality Processes Unchanged TEAM NAME

Supply Chain Management Appropriately catalog Seek concurrence if multiple users Standard Procurement Activity Digital data - Digital definition (1D, 2D and 3D digital) Design, Modeling & Sim, Production Licensing options Manufacturing Schedule Delivery Supply Chain Management is Unchanged TEAM NAME

Key Takeaways (Day 2): (Blue Box) Working AM technology with the current processes in place Same engineering processes Similar procurement Similar qualification and testing

GAPS Material Allowable / Material Specifications Allocation of IP concerns Digital thread definition with minimal data schema Data repository Cybersecurity Communicating need to industry Standardizing the AM process Industry standards Distributed AM printing network Lack of government equipment, skills and knowledge Industrial equipment Funding for NRE / part cost TEAM NAME

Backup

Digital Network Define a framework for a qualification process for government / supplier and part. A comparable supply chain management system …. All within the context of a digital network with interoperable capability TEAM NAME

TEAM NAME

TEAM NAME

Mask Valve (Green Valve) Requirements: Functional performance document provided Design interfaces and functional requirements Use of Non- qualified materials of COTS parts / ASTM & SAE standards required 300 assy, 800 total, 2 AM, 2 Non-AM parts 100% Quality Assurance Total Time: 15 days (Design to Delivery) Ground Test, Flight Test 30 to 60 days of use $250 unit cost Build schedule, time line for test. TEAM NAME

Request Request came in from PMA 202 Need to bridge DOD need to industry DLA Internet Bid Board System (DIBBS) / GSA Network of service bureaus Multiple members of network (tiered) AM designers AM producers Testing / Qualification Quick First Article Inspection Funding: 1. USG, 2. Vendor Off-shelf, 3. Hybrid TEAM NAME

Parking lot Component delivery- Acceptance Design downselect Configuration / data management of non-winners Bid vs contract design Intellectual property – limited rights Government Purpose, license as needed T/C’s agreed to ahead of time Credit Card / Purchase Card Data Transfer/ Data Management- Interface defined here Update / Feedback user experience In scale with Quick Reaction Time, immediate Component delivery- Acceptance Program office determines – Transportation method, destination inspection, customer direct. Payment strategy (vendor tier) TEAM NAME

CSI Part- UH-1 Engine Apex Fitting (Blue Box) Requirements: Redesign allowed- Meet Form, Fit Function Part Consolidation ? Material change allowed (criteria provided) Functional performance document provided Design interfaces and functional requirements Performance Requirements (Structural, fatique) Have report, no load data- system level analysis required Navy has GPR to data accepted PGI 217.7504 Acquisition of parts (when data is not available) TEAM NAME

Request Request came in from PMA 202 Need to bridge DOD need to industry DLA Internet Bid Board System (DIBBS) / GSA Network of service bureaus Multiple members of network (tiered) AM designers AM producers Testing / Qualification Quick First Article Inspection Funding: 1. USG, 2. Vendor Off-shelf, 3. Hybrid TEAM NAME

Parking lot Component delivery- Acceptance Counterfeit Design downselect Configuration / data management of non-winners Bid vs contract design Intellectual property – limited rights Government Purpose, license as needed T/C’s agreed to ahead of time Credit Card / Purchase Card Data Transfer/ Data Management- Interface defined here Update / Feedback user experience In scale with Quick Reaction Time, immediate Component delivery- Acceptance Program office determines – Transportation method, destination inspection, customer direct. Payment strategy (vendor tier) Counterfeit Standardization across services on criticality or air worthiness (Function Driven) – missing category Identify opportunities for upgrades How do prime solicit AM support - VECP TEAM NAME

Objectives (Day 1): TEAM NAME Solve mask valve problem with in industry (Green Box)

Steps to Achieve Day 1 Objectives: TEAM NAME Steps to Achieve Day 1 Objectives:

Challenges / Gaps Identified (Day 1): TEAM NAME Challenges / Gaps Identified (Day 1):

TEAM NAME Goals for Day 2: