Data Link Advanced Operations

Slides:



Advertisements
Similar presentations
Air Traffic Management
Advertisements

SOCM-2 Seminar Data Link Benefits Presented By: Dennis Addison, FAA
SOCM-2 Seminar Data Link Advanced Operations Presented By: Dennis Addison, FAA Date: February 8, 2012.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
#4407. When may ATC request a detailed report of an emergency even though a rule has not been violated? A- When priority has been given. B- Anytime an.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
1 Tailored Arrivals & the En Route/ Descent Advisor Rich Coppenbarger Automation Concepts Research Branch (AFC) NASA Ames Research Center Moffett Field,
VISUAL APPROACHES.
Standard Terminal Arrival Routes STARs
Fuel Efficient Air Traffic Control Maryam Kamgarpour, PhD Student Claire Tomlin, Research Adviser John Robinson, NASA Ames Research Center December 17,
DARP.
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 IP09: LOST FUEL SAVINGS DUE TO LACK OF.
AIR TRAFFIC ROUTES.
02/10/08 NextGen dependence on GPS! Captain Joe Burns Managing Director Flight Standards, Technology, Flight Test United Airlines.
Tower Enroute Control Procedures
1 Las Vegas Operations Briefing 2011 NetJets Poker Invitational Presentation.
Sep 2012 Lesson 3.4 Air Law Air Traffic Rules. Reference From the Ground Up Chapter 5.1: Air Traffic Rules and Procedures Pages
AIRSPACE What’s old –What’s new!.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
Chapter 6 Section A. STAR Standard Terminal Arrival Route –Depart the enroute structure –Navigate to destination –Terminate with an instrument approach.
Data Link Communications
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
By: Date: Federal Aviation Administration Surveillance and Broadcast Services November 12, 2008 Merging and Spacing Enabling Continuous Descent Arrivals.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
ATC1 Air Traffic Control ATC2 Purpose of ATC Safety — Conflict Avoidance — Separation of aircraft Visual Flight Rules Instrument Flight Rules Efficiency.
Presented to: By: Date: Federal Aviation Administration ADS-C CDP Climb/Descend Procedure Implementation Project Update IPACG/39 Keith Dutch, FAA 03 –
LECTURE 4: ICAO CHART requirements
A Cockpit Display Designed to Enable Limited Flight Deck Separation Responsibility Walter W. Johnson & Vernol Battiste NASA Ames Research Center Sheila.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Federal Aviation Administration APEC Seminar on Practical Measures to Manage Aviation Emissions Collaboration on Aviation Emissions Reduction Partnerships.
National Airspace System
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
Arrival Charts and Procedures
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
1 International Flight Operations Efficiency Enhancements: Oceanic Navigation and the North Atlantic Track System (NATS) Presented by Frank Ketcham.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Flight Operations.
Vertical, lateral separations based on time / distance
FAA Flight Standards AFS-220/430 FPAW 2017 Summer
AIR TRAFFIC ONTROL.
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
U.S. AIRSPACE.
Airports, Airspace, & Radio Communication
Portland Tower/TRACON UAO Customer Briefing July 2010
VARIOUS KINDS OF SEPARATION
Basic Principle An altimeter measures air pressure, decreasing with increasing altitude ( barometric formula), and from the surrounding's pressure calculated.
longitudinal separations based on time / distance
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Rome November 2008 Johan Martensson, CASCADE
FANS (Future Air Navigation System) Flight Crew Procedures
Data Communications Program
Continuous Descent Operations (CDO) Saulo Da Silva
Continuous Climb Operations (CCO) Saulo Da Silva
Airport engineering.
RNAV and RNP Strategy in Japan
Magesh Mani BSACIST.
Airspace Volumes and Sectorisation Good Design Practice
ATC Clearances Chapter 3 Section C.
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

Data Link Advanced Operations SOCM-2 Seminar Data Link Advanced Operations Presented By: Dennis Addison, FAA Date: February 8, 2012

KSFO Tailored Arrival (TA) Trials Initial TA Trials began in 2006 Early Morning Traffic with little airport demand. UAL aircraft only Latest TA Trials began December 2007 Expanded beyond early morning flights Refined arrival routing and renamed the arrival Added additional operators Reduced coordination requirements for controllers

KSFO Tailored Arrival Profiles Determining the TA profile CREAN CINNY 3657N12335W AOB FL250 RAINS AOB FL200 PIRAT AOB 150 3722N12223W AOA 060 BRINY AOB 120 OSI MENLO AOA 040 Initial Altitude Descent Speed Winds Drawings not to scale Aircraft type CREAN CINNY 3657/12335 RAINS PIRAT BRINY 3722/12223 OSI MENLO KSFO

Profile Development Goals Meet ATC requirements Minimum IFR Altitudes Noise Abatement ATC Altitude Crossing Requirements Continuous Descent Idle Power Descent Keep aircraft within the expected descent profile.

TAILORED ARRIVAL UPLINK A COMPLEX 4D TRAJECTORY PROFILE CLEARANCE IS UPLINKED TO THE AIRCRAFT FMS

Tailored Arrival Route Clearance Element One: Clearance Name (freetext) PACIFIC TWO TA

Tailored Arrival Clearance Controller constructs the TA clearance using MOPS Element 83 Route Clearance

Tailored Arrival Clearance KSFO 28R ILS28R MENLO CINNY 3657N12335W/F250B RAINS/F210B PIRAT/N0250A150B BRINY/N0250A120B 3722N12223W/A060A OSI MENLO/N0210A040A

Tailored Arrival Route Clearance The clearance is constructed to clear the flight via the TA route and to maintain current altitude. The clearance is probed for conflicts and then sent to the aircraft. (freetext) PACIFIC TWO TA (83) AT COSTS CLEARED ROUTE (19) MAINTAIN F330

TAILORED ARRIVAL UPLINK Tailored Arrivals enable VNAV path to the Localizer. FMS determines most efficient aircraft descent profile

TA Radar Vectoring/Routing The goal of the controller is to let the aircraft fly the TA without intervention, however at times it may be necessary to change an aircraft’s flight path. To do this, the controller must: Issue a radar vector for traffic. When the vector is complete or to shortcut an aircraft, the following instructions are issued: "Call Sign, cleared direct (waypoint on the TA) the remainder of the Pacific Two TA. Comply with Restrictions."

Termination of Tailored Arrival At any time the Tailored Arrival may be terminated by the aircraft or ATC. If the flight crew replies “UNABLE” to any TA clearance, or requests cancellation of the TA, the TA is terminated for that flight. If the Tailored Arrival is terminated. Advise the aircraft “Tailored Arrival is terminated”. Issue a new Route and Altitude clearance to the aircraft. Notify the downstream controller of OTA cancellation.

Fuel Savings from Top of Descent Cruise to Landing 777-200/GE90-85B 747-400/PW4056 Full TA 1,303 lbs 2,291 lbs Partial TA 379 lbs 1,100 lbs Fuel consumption was calculated using the Boeing Climbout Program (BCOP) for low speed performance below 10,000 ft altitude. Fuel consumption above 10,000 ft altitude was calculated using the Boeing INFLT tool for cruise and descent. The vertical profile generated from BCOP and INFLT was matched to the mean descent paths of the collective ANOMS8 radar data.

Dynamic Airborne Reroute Procedure (DARP)

Dynamic Airborne Reroutes Allows Airborne Rerouting of Aircraft When Winds Indicate a More Fuel Efficient Route is Available Reduce Operating Costs by Taking Advantage of Updated Winds FANS and Air Traffic Services Inter-facility Data Communications (AIDC) Required Ongoing Trials in the South Pacific

Dynamic Airborne Reroute Procedure ZOA New Weather Forecast AOC User Preferred Route Dynamic Reroute Msg 24 Route Req Auckland UM83 Route Clrce AIDC New Route

Dynamic Airborne Reroutes ZSE, ZOA, ZLA DARPS have saved flights 2000 pounds of fuel burn and 7 minutes flying time RJTG NTTT YBBB NFFF NZZO

ADS-C CDP Clearances Procedure is based on in-trail Distance Measuring Equipment (DME) rules in ICAO Doc 4444, paragraph 5.4.2.3.2. *Near Simultaneous ADS-C Demand Reports *Climb/Descend an aircraft through the altitude of a blocking aircraft