A. Herlert, CERN PH-SME-IS

Slides:



Advertisements
Similar presentations
PH Dept News Fellows and associate committee Dec 2011: 12 fellow candidates for ISOLDE (on par with LHC experiments) 2 new fellows hired – Susanne Kreim.
Advertisements

Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, July 6, 2011 Beam requests and schedule 2011 Experimental statistics.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
K. Riisager, TA8 ISOLDEEURONS PCC-Meeting, Mainz (Germany), April 2006 Recent highlights from ISOLDE News from the facility –Users meeting, February.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
EBIS ARR Jim Alessi May 4- 7, 2010 Technical Overview.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report INTC meeting, 15 February 2007 ISOLDE scientific coordinator’s report INTC meeting, 15 February.
PH Dept and Section News New Organization Group budget Technician Fellows, associates and students Workshop on non LHC Physics (11-13 May) Isolde Workshop.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Scheduling News. Magdalena Kowalska. Injector schedule since last meeting 2 Confirmation of 2 week proton prolongation – until December 17 th : 35 ->
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Magdalena Kowalska, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 4, 2010 Running period 2010 Status of INTC shifts Accelerator.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, February 11, 2008 ISOLDE scientific coordinator’s report INTC meeting, February.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Schedule Access to the hall b508. Magdalena Kowalska.
1 NA61/SHINE Collaboration Metting, Dubna, April 7-11, 2014 NA61/SHINE news and plans (October 2013-February 2014) Published papers: Measurements of production.
PH Department News Discussion with management
NA61 news and plans (May 2013-October 2013) Publications:
EYETS David Hay EN-OSS.
A. Martynov on behalf of accelerator division.
Online check lists Half Sector Test
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Status of the BI Work Package in the LIU-PSB frame
Target and Horn status report
Renovation of the 45-year old PS magnets
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Alexander Herlert, CERN (PH-SME-IS)
Introduction to ISOLDE RFQ
A. Herlert, CERN PH-SME-IS
Magdalena Kowalska, CERN PH-SME-IS
Scheduling News . Magdalena Kowalska.
Magdalena Kowalska, CERN PH-SME-IS
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Thomas Nilsson, CERN EP/IS
Magdalena Kowalska, CERN PH-SME-IS
Report on HIE-ISOLDE Status
Present and Future test facilities for High-intensity Targetry CERN
Mats Lindroos for The ISOLDE team
66th ISOLDE Collaboration Committee meeting
Coordinator’s report . Magdalena Kowalska.
Thomas Nilsson, CERN EP/IS
Ciprian Plostinar Workshop on Testing and Commissioning
INTC matters . Magdalena Kowalska.
Beam Transfer Line Stage 1:
Magdalena Kowalska, CERN PH-SME-IS
Thomas Nilsson, CERN EP/IS
A. Herlert, CERN PH-SME-IS
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
ThomX – Commissioning Meeting – 25/01/2018
Polarized 3He target installation
Alexander Herlert, CERN (PH-SME-IS)
Presentation transcript:

A. Herlert, CERN PH-SME-IS ISOLDE scientific coordinator’s report ISCC meeting, November 16, 2009 A. Herlert, CERN PH-SME-IS Running period 2009 Status of experiments New ISOLDE web page

ISOLDE experiments and requests 2009 INTC February 2009 10 new experiments: IS484 - IS493 363 approved RIB shifts 83 experiments after February meeting Beam requests 2009 11 completed experiments 51 experiments out of 72 requested beam (627 shifts) Requests for REX-ISOLDE 273 shifts INTC May 2009 1 new experiment: IS494 21 approved RIB shifts

ISOLDE schedule 2009 (Apr 20 - Nov 23) Requested shifts: 662 in total 96 different beams 627 for 51 experiments Scheduled shifts (~70%): 463 in total 62 different beams 437 for 39 experiments REX-ISOLDE: 273 shifts requested 140 shifts scheduled 9 experiments (8 runs) additional WITCH runs (need REXTRAP) GPS HRS

Main problems in 2009 (I) Wk 15: Startup problems - beam to users (COLLAPS) very much delayed (off-line tests possible) Wk 17/18: Vacuum problems, target performance not ok, power cut, controls problems ... debugging run Wk 19: Target change delayed due to PISOMOVE problems, 11Li yields not sufficient but detector tests possible (IS417) Wk 20: PSB injection septum broken IS457 has to run with limited intensity Wk 22/23: REXLINAC 9-gap failure no beam for IS485 Wk 25/26: YO target not ready for IS478 (cancelled). Rescheduled IS485 takes beam until several power cuts on June 18 eliminate ISOLDE operation (vacuum etc.) GPS HRS

Main problems in 2009 (II) Wk 31: IS443 stopped due to HV tripping ... some data obtained Wk 35: LINAC2 vacuum probem, IS480 stopped shortly after start of run - no data Wk 42: REXEBIS cathode broken, IS430 resumes measurements after very fast repair Wk 44: HV problems, wrongly set extraction electrode and ripple on HV (missing ground) - no beam for IS413 Wk 47: HRS front-end blocked, no target change possible - IS433 cannot take beam from HRS but from GPS as scheduled GPS HRS

Accelerator schedule 2010 (draft) ISOLDE dates: protons from PSB April 12 physics start ISOLDE April 29 protons stop November 22 (i.e. 29.5 weeks for physics as compared with 31 weeks in 2009) Longer shutdown period due to new HRS front-end and new vacuum system Several long periods of MD partly with parasitic beam to ISOLDE (not guaranteed)

Follow up: Reallocation of floor space for experiments 2008 HV PLAT- FORM ISOLTRAP MISTRAL COLLAPS COMPLIS MINIBALL ECR NICOLE ASPIC TAgS ? WITCH

Follow up: Reallocation of floor space for experiments - present HV PLAT- FORM ISOLTRAP MISTRAL COLLAPS CRIS MINIBALL EC NICOLE ASPIC TAgS WITCH b

Status of experiments - ECR Aug 2009 ECR removal and new GHM experiment ECR experiment before removal

Status of experiments - ECR removed Aug 2009 Parts to be shipped to Grenoble and GANIL Some equipment belongs to ISOLDE and can be used by other users and experiments GHM collection chamber removed, new chamber to be designed and installed

Status of experiments - EC Aug 2009 New experiment: On-line emission channeling

Status of experiments - MISTRAL Clean-up has started RFQ buncher and cooler of MISTRAL removed (shipped to University Mainz) Looking into the removal of 22t magnet difficult! Oct 2009

Status of experiments - Beta-NMR Two PhD students: Hans Tornqvist (CERN - supervisor Thomas Nilsson) Christophe Sotty (Orsay - supervisor Georgi Georgiev) setup progressing well Nov 2009 mailing list and web page available Initial safety discussion to be done soon Support from W.-D. Zeitz Tilted foil polarization First test in week 48 with stable Ne beam from EBIS

Status of experiments - CRIS Installation ongoing Prototype experiment for new safety structure Ready for off-line beam during Summer First on-line run planned for October 2010 Nov 2009

Status of experiments - WITCH New shielding installed (to prevent influence of WITCH magenetic field on HCI beam steering) Not enough (scaling not working) Vacuum system of WITCH and almost all electrodes of the spectrometer improved Commissioning run in week 47 Permanent crew (post-doc Martin Breitenfeldt and technician Julien Thiboud) Nov 2009

Status of experiments - HV Platform Nov 2009 Can only be used for collections Acceleration stage not functional Need new transformer? Check vacuum system Renovation of HV platform needed

Status of experiments - GLM Nov 2009 Heavily used by solid state physics community New setup available and to be installed soon Improvement of concrete shielding planned

Status of experiments - ASPIC Future of ASPIC under discussion Former HMI Berlin (now HZ for material science) would like to pass on the equipment to the ISOLDE Collaboration until new user takes over responsibility (no additional funds expected) Kay Potzger showed interest, tries to obtain German BMBF funds to revive research program: quote from a recent email: "[...] I decided to write the application for re-installation of ASPIC. My boss (J. Fassbender) in FZD finally agrees and supports the project by involving our workshop, i.e. the new ASPIC chamber will be set up at FZD. Consequently, we will be main users but share the system with all the other groups from ISOLDE (unlike old ASPIC). [...]"

New ISOLDE web page ALL Files and content transferred by Albert Deh Hwa Taureg (August 2009, "enfants de fonctionnairs" program at CERN) IT Security issues checked New web page located at: http://isolde.web.cern.ch/ISOLDE/ isoldenewweb Many files need to be updated and new pages have to be created (e.g. for safety)