Melanie Garrick Barry Mullins Nihar Patel Jason Young

Slides:



Advertisements
Similar presentations
Presenter: Kenny Haulk
Advertisements

Gigabit Ethernet PMD Opto-Link, Inc. – Progress Summary Vinh Nguyen, Clifton Kerr, Andrew Meyerson, Bryan Justice April 21, 2005.
Senior Design Project: Group IV Gigabit Ethernet Optical Transceiver Group Members: Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Presenter: Nassisa-Geda Techane. 2 This Week’s Highlights The optical link budget almost finished Website up on the ECE domainWebsite Yahoo Group set.
1 Labs 1 Prop-TX PA Coupler RF S W I T C H Components to be purchased Labs built 30 dB PNA Reference Input PNA RF Output RF/Attenuator Switch Controller.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
Presenter: Kenny Haulk. 2 This Week’s Highlights Tested Receiver with attenuation and shielding Measured power output from GDS1250 TX and our own VCSEL.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
ECE 135 – Group 3 Presentation 4 Bryan Chavez with Pat Cleary & Kevin Parker February 10 th, 2005 February 10 th, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
מהפכות באנגליה.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
ECE 135 – Group 3 Presentation 1-2
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Project GabE ECE 135 – Spring 2005
Capstone Design Update
ECE 135 – VCSEL Kings Presentation 5
Optical Gigabit Ethernet
Status Presentation February 20-27, 2003 Michelle Middleton.
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
GROUP 1 FINAL PRESENTATION
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Group 5 – ECE 4006: Week 2 Jason Young 5/2/2019.
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
ECE 135 – The Three Presentation 9
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Melanie Garrick Barry Mullins Nihar Patel Jason Young Group 5 – ECE 4006: Week 16 Melanie Garrick Barry Mullins Nihar Patel Jason Young 11/18/2018

Semester Summary Started off clueless Got hope after testing the practice board Worked on OLB Designed the transceiver and did the layout Tested and debugged It works!!! 11/18/2018

From laser driver specs Optical Link Budget From graph From Standard From Standard From schematics From laser driver specs 11/18/2018

Optical Link Budget 11/18/2018

Schematics 11/18/2018

Design Layout 11/18/2018

Test Results – Baseline Rx PRBS7 11/18/2018

Test Results – Baseline Tx PRBS7 11/18/2018

Test Results – Loopback PRBS7 11/18/2018

Test Results – Attenuated Tx PRBS7 – 5dB PRBS7 – 10dB 11/18/2018

Test Results – Attenuated Rx PRBS7 – 5dB PRBS7 – 10dB 11/18/2018

Test Results – Att. Loopback PRBS7 – 5dB Unshielded PRBS7 – 5dB Shielded 11/18/2018

Test Results – Att. Loopback D21.5 – 10dB Shielded 11/18/2018

Test Results – Alignment Rx PRBS7 11/18/2018

Test Results – Algn. Loopback PRBS7 11/18/2018

Test Results – Algn. Tolerance PRBS7 In x-direction ~ 0.5 μm tolerance Thanks to Group 2 for letting us borrow your PD! In y-direction ~ 0.75 μm tolerance In z-direction ~ 2 μm tolerance 11/18/2018

Monetary Budget 11/18/2018

Bill of Materials 11/18/2018

Final Gantt Chart 11/18/2018

Results Summary Baseline Rx, Tx, and Loopback successful Attenuation testing successful after discovery of fiber voodoo PRBS7 Loopback works for 5 dB, while D21.5 works until 10 dB attenuation Alignment testing cut short due to limited lab time 11/18/2018

Anticipated Progress for Week 17 HUH !! What progress ?? We done 11/18/2018