ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto

Slides:



Advertisements
Similar presentations
Sander Klous on behalf of the ATLAS Collaboration Real-Time May /5/20101.
Advertisements

ATLAS LHCC 28/11/00 A. Henriques/CERN 1 H8 : Pixel, SCT, TRT, Tiles, LAr em barrel, Muons SPS H6: EMEC, HEC, FCAL, Background studies GIF: Muons (MDT,
10/26/2005 ATLAS Visit Dr Pierre Coulombe President, National Research Council Canada Short introduction by Peter Jenni and Robert Orr.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
1 Introduction to Geneva ATLAS High Level Trigger Activities Xin Wu Journée de réflexion du DPNC, 11 septembre, 2007 Participants Assitant(e)s: Gauthier.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Status of Eric Kajfasz CPPM/Fermilab GDR-Susy, Lyon - 26 novembre 2001.
October 20 th, 2000Lyon - DAQ2000HP Beck ATLAS Trigger & Data Acquisition Requirements and Concepts Hanspeter Beck LHEP - Bern for the ATLAS T/DAQ Group.
Pascal PERRODO, ATLAS-LAPP
The ATLAS B physics trigger
Kostas KORDAS INFN – Frascati XI Bruno Touschek spring school, Frascati,19 May 2006 Higgs → 2e+2  O (1/hr) Higgs → 2e+2  O (1/hr) ~25 min bias events.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
Chris Bee ATLAS High Level Trigger Introduction System Scalability Trigger Core Software Development Trigger Selection Algorithms Commissioning & Preparation.
The ATLAS trigger Ricardo Gonçalo Royal Holloway University of London.
ATLAS Liquid Argon Calorimeters Geneva Group Alain BLONDEL Arno STRAESSNER Ahmed ABDELALIM Daniel LA MARRA Eric PERRIN Gabriel PELLERITI Gilbert VIOLLAT.
Recirculation Concept - Cyclotron Radio frequency alternating voltage Hollow metal drift tubes time t =0 time t =½ RF period D-shaped.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
1 Modelling parameters Jos Vermeulen, 2 June 1999.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
October 16th 2000 NSERC Site Visit M. Lefebvre1 ATLAS at the University of Victoria M. Lefebvre NSERC Site Visit October 16th 2000 The ATLAS Experiment.
Large Hadron Collider and ATLAS in Canada First beam circulation 10 September 2008 Rob McPherson Canadian Institute of Particle Physics and the University.
The ATLAS Trigger and Data Acquisition: a brief overview of concept, design and realization John Erik Sloper ATLAS TDAQ group CERN - Physics Dept. April.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
The ATLAS Trigger: High-Level Trigger Commissioning and Operation During Early Data Taking Ricardo Gonçalo, Royal Holloway University of London On behalf.
January 12th 2009MICINN-IN2P3 meeting1 ATLAS and CMS in France Construction Integration and Commissioning Test beam LHC computing Physics Plans for sLHC.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
2003 Conference for Computing in High Energy and Nuclear Physics La Jolla, California Giovanna Lehmann - CERN EP/ATD The DataFlow of the ATLAS Trigger.
CHEP March 2003 Sarah Wheeler 1 Supervision of the ATLAS High Level Triggers Sarah Wheeler on behalf of the ATLAS Trigger/DAQ High Level Trigger.
Pixel-Tilecal-MDT Combined Run E. Pasqualucci INFN Roma.
Artemis School On Calibration and Performance of ATLAS Detectors Jörg Stelzer / David Berge.
R.S. Orr 2009 TRIUMF Summer Institute
Tev4LHC Workshop 28 April th April Tev4LHC 28 th April 2005 ATLAS: detector status Test beams and Plans for Commissioning Detector status.
ATLAS TDAQ RoI Builder and the Level 2 Supervisor system R. E. Blair, J. Dawson, G. Drake, W. Haberichter, J. Schlereth, M. Abolins, Y. Ermoline, B. G.
Kostas KORDAS INFN – Frascati 10th Topical Seminar on Innovative Particle & Radiation Detectors (IPRD06) Siena, 1-5 Oct The ATLAS Data Acquisition.
Trigger/DAQ/DCS. LVL1 Trigger Calorimeter trigger Muon trigger Central Trigger Processor (CTP) Timing, Trigger, Control (TTC) Germany, Sweden, UK Italy.
1 Cosmic commissioning Milestone runs Jamie Boyd (CERN) ATLAS UK Physics Meeting-- J Boyd Jan
ANDREA NEGRI, INFN PAVIA – NUCLEAR SCIENCE SYMPOSIUM – ROME 20th October
The ATLAS Trigger System 1.Global Requirements for the ATLAS trigger system 2.Trigger/DAQ Architecture 3.LVL1 system 4.HLT System 5.Some results from LHC.
The ATLAS detector … … is composed of cylindrical layers: Tracking detector: Pixel, SCT, TRT (Solenoid magnetic field) Calorimeter: Liquid Argon, Tile.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Commissioning of the ATLAS High Level Trigger with Single Beam and Cosmic Rays 1.Review of HLT architecture 2.Tools needed for Commissioning 3.Operational.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
The ATLAS Collaboration
5/14/2018 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
Installation and Commissioning of the ATLAS LAr Readout Electronics
U.S. ATLAS TDAQ FY06 M&O Planning
Ricardo Gonçalo, RHUL BNL Analysis Jamboree – Aug. 6, 2007
2018/6/15 The Fast Tracker Real Time Processor and Its Impact on the Muon Isolation, Tau & b-Jet Online Selections at ATLAS Francesco Crescioli1 1University.
Risultati del run di integrazione M4
Optical data transmission for
Japan Participation in Phase-II TDAQ Upgrade
High Level Triggering Fred Wickens.
Operating the ATLAS Data-Flow System with the First LHC Collisions
Toward a costing model What next? Technology decision n Schedule
VELO readout On detector electronics Off detector electronics to DAQ
High Level Trigger Studies for the Efstathios (Stathis) Stefanidis
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Collaboration
Trigger commissioning and early running strategy
The First-Level Trigger of ATLAS
New Calorimeter Trigger Receiver Card (U. Wisconsin)
12/3/2018 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
1/2/2019 The ATLAS Trigger and Data Acquisition Architecture & Status Benedetto Gorini CERN - Physics Department on behalf of the ATLAS TDAQ community.
LHCb Trigger, Online and related Electronics
The CMS Tracking Readout and Front End Driver Testing
Presentation transcript:

ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto TRIUMF UBC Victoria York 33 University/Lab.physicists Over 88 people, including Engineers, Technicians, Students Includes 3 IPP Research Scientists Educational Role 20 UG Summer Students 21 Graduate Students 13 Post Docs Focus on Liquid Argon Calorimetry 4 NSERC Funded Construction Projects Endcap Hadronic Calorimeter Forward Hadronic Calorimeter Front-End-Board Electronics Endcap Signal Cryogenics Feedthroughs Construction completed last year End of Installation this year Commissioning in 2006 Ongoing/Future Activities Analysis of Beam Tests Calorimeter Calibration Preparation for Physics Event Filter Algorithms/Ops Computing - soft/hard Beam Condition Monitors 11/18/2018

Why Is It Called a Calorimeter? Liquid Argon/Metal Charged Particle Kinetic Energy of Particle Converted to Ionization Of Liquid Argon Electrical Signal Proportional to Incoming Energy Why Is It Called a Calorimeter? Readout Electronics 11/18/2018

Calorimeters as Physics Tools Forward Jet Identification

University of Victoria Cryogenic Signal Feedthroughs Over 180k signal channels in the LAr calorimeter High density and reliability required: 1920 pins per feedthrough unit University of Victoria TRIUMF 11/18/2018

Hadronic Endcap Calorimeter Front Wheel 2 Front and Rear Modules Rear Wheel Wheel Assembly Composed of 2 wheels per end Front wheel:67 t 25 mm Cu plates Back wheel:90 t 50 mm Cu plates TRIUMF, Alberta 11/18/2018

HEC 2 A-wheel on the insertion stand, Aug. 2004 11/18/2018

Tungsten-Copper Internal Structure Forward Calorimeter Four Modules Each 0.9 m Diam, 0.45 m long Total 20 Tonnes Tungsten Carleton, Toronto FCAL1 FCAL3 FCAL2 Plug3 Completed Module Tungsten-Copper Internal Structure 11/18/2018

LAr Forward Calorimeters FCAL Carleton, Toronto 11/18/2018

EndCap A Last HEC wheel inserted Oct 04, FCal insertion early 2005 11/18/2018

EndCap C … Final Integration Closed Aug 04, cold tested in B180, now at Point 1 11/18/2018

Trigger, DAQ and Detector Control Calo MuTrCh Other detectors 40 MHz 40 MHz 75 kHz ~2 kHz ~ 200 Hz LV L1 D E T R/O Read-Out Drivers FE Pipelines Read-Out Sub-systems Read-Out Buffers Read-Out Links 2.5 ms LVL2 ~ 10 ms ROIB L2P L2SV L2N RoI RoI data = 1-2% requests Lvl1 acc = 75 kHz ROD ROD ROD 120 GB/s ~ 300 MB/s ~2+4 GB/s ROS 120 GB/s ROB H L T D A T F L O W RoI Builder L2 Supervisor L2 N/work L2 Proc Unit EB SFI EBN DFM Lvl2 acc = ~2 kHz Event Building N/work Dataflow Manager Sub-Farm Input Event Builder EFN SFO Event Filter EFP ~ sec ~4 GB/s EFacc = ~0.2 kHz Event Filter N/work Sub-Farm Output Event Filter Processors 11/18/2018

High Level Trigger Principal focus Combined Testbeam LVL2 muon slice fully integrated in H8 combined testbeam Fast LVL2 m reconstruction, and detector description infrastructure integrated TrigMoore EF m reconstruction integrated Steering of TrigMoore from LVL2 result implemented These integration tests are the first demonstration of a complete HLT chain with algorithms in an online setup, reading out directly detectors ID LVL2 tracking algorithms integrated and run in the testbeam CaloRec in EF Timing algorithm & data preparation timing studies Extensive testing of the event selection steering component Online histogramming 11/18/2018

TDAQ Setup in Combined Test Beam LVL1 DFM gateway in bdg.513 SFI Tracker Calo Muon det. LVL1 calo ROS RPC TGC CSC LVL1 mu Tile TRT SCT Pixel LAr MDT monitoring run control pROS data network (GbE) MAGNI farm in bdg. 513 SFO remote farms storage CASTOR (IT) LVL2 farm in H8 EF farm Compared to ATLAS ~10% of DAQ ~2% of HLT just counting PCs… 11/18/2018

LAr Front End Electronics Development and fabrication on track for most components, boards Issues: - Still have a delay in the rad-hard ST negative voltage regulators. - Rad-tolerant low voltage power supplies finally in fabrication - Problem encountered with a special timing circuit (QPLL) FE board production is currently stopped Rad-tolerant FE board (1524 boards, each 128 channels) Power supply Front-end crate electronics 11/18/2018

Front-End Board Schedule Switched Capacitor Array Light Blue is schedule before Delay at Bottom 2003 October: full 14 board test. 2004 March: start of front-end board production 2004 November: begin front-end board installation (1.25 days/crate) Stopped late summer due to QPLL problems Solution found – mezzanine board Resume Production Feb 2005 Six Month Delay No Final Schedule at present for Installation Not affected by production delay Jan 05 – Aug 05: Phase 1 – EM barrel at truck Aug 05 – Sep 05 : Phase 2 – EM Barrel at IP Dec 05 – Jul 06: Endcap C Feb 06 – Aug 06: Endcap A SCA Controller 11/18/2018

Calorimeter Front-End-Board Electronics Radiation Hard Logic to Control Calorimeter Signal Readout Design, Testing, Implementation Alberta 11/18/2018