GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
Quality Management System
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
ISO 9000 Certification ISO 9001 and ISO
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
GLAST Large Area Telescope:
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
Office of Human Research Protection Georgia Health Sciences University.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Controlled Storage Training Presented by Marcie Dickson Honeywell Quality Engineer NASA Safety and Mission Assurance
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
I&T&C Organization Chart
GLAST Large Area Telescope:
Software and Systems Integration
GLAST Large Area Telescope:
THEMIS Mission Assurance
Mechanical Integration
GLAST Large Area Telescope:
Integration and Test GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Integration and Test Organization Chart
LAT Environmental Test Planning and Design Review
Introduction and Overview
PSS verification and validation
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Quality Assurance Doug Bartholomew LAT Quality Engineering

Role of QA in I&T Complete incoming receiving inspections per LAT- TD-02797 Receipt of flight, MGSE, and EGSE hardware will include the following checks; ID&D (identification and damage), visual inspection, cleanliness, documentation, and acceptance tests. Review I&T MGSE and EGSE Ensure MGSE equipment has appropriate identification. (LAT-MD-01462) Audit EGSE racks for validation and verification. (LAT-MD-01533) Witness all lifting and hoisting operations. (ES&H Bulletin 71) Witness all hardware torque operations per hardware installation procedure and drawing. Monitor effective contamination controls are in place (LAT-MD-00404) Monitor compliant ESD controls. (NASA-STD-8739.7) Witness connector mate/demate. Inspect pre and post mate/demate Develop and approve I&T procedures, work orders (AIDS), and process improvements Monitor current certification of all personnel working on the LAT

Roles and Responsibilities Quality Assurance Engineer (QE) The QE is required to attend the Test Readiness Review (TRR), Daily Test Coordination meetings and the Post Test Review (PTR). The QE has signature authority on the procedures and work order (AIDS) authorizations. The QE signature is required on any black or red lines made to the procedure. (LAT-MD-03474) The QE is an active participant in the test operations but only in an oversight role. The QE is responsible for the oversight of the following; Ensure that all hardware and test logs are maintained. Ensure that all requirements are accurately met Ensure that any deviations are approved and documented prior to performance

Facility Audits and Surveillance Facility Readiness Review (SLAC I&T Facility – Building 33) was performed to evaluate readiness of the facility to receive, store, assemble and test flight hardware. 4 findings and 22 observations were identified and documented. All findings and observations were closed Weekly surveillance of I&T Facility operations are performed by LAT QA and I&T personnel to verify compliance to requirements and procedures 4 observations currently open

NCR Process All nonconformances will be documented in the SLAC GLAST LAT Nonconformance Reporting System Nonconformance are to be documented immediately SLAC QA will segregate or identify nonconforming material or hardware until nonconformance is dispositioned All nonconformance reports shall have complete, concise problem identification, cause and corrective action Open NCRs will be reported daily to I&T and reported weekly to the effected LAT management.

Nonconformance Reporting process The assigned LAT Quality Engineer will coordinate appropriate MRB activities based on Subsystem and classification of nonconformance. Anti-Coincidence Detector (ACD), Calorimeter (CAL), Electronics (ELEC), Integration & Test (I&T), Instrument Ops Ctr (IOC), Mechanical Systems (MECH), Management (MNG), Performance & Safety Assurance (PSA), Science Software Sys Eng (SE). Emphasis will be placed on working with applicable I&T Subsystem Engineers throughout disposition effort. All rework or retest will be completed on the appropriate I&T documentation. Dispositions explain what actions will be taken or what information will be researched to resolve a nonconformance. The disposition also serves as a means to record information discovered as a result or inspections or troubleshooting actions. QA will assure that appropriate actions are taken to correct the discrepancy and return the product to an acceptable state prior to closing the NC.

Open Liens to flight hardware Subsystem liens will be documented on an NC as part of the receiving inspection process. NCRs will be reviewed daily with I&T and reported weekly to the effected LAT management. Open Grid liens (11/16/04): 1. NCR #147: Need to perform final measurement of Tracker bushing locations during alignment ops Need to verify Spacecraft attach holes true positions on +X/-X sides are acceptable 2. Complete end item data package from Tapemation expected 11/18/04