UnFramed Canopy Fitting Instructions V3.0 Contents – 1 x handle pack 12 x 30mm Wood Screws 4 x M8 flat washers 3 keys 1x door 4 x M8 - 50mm coach screws.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Filter Changing Procedures For TEOM Series 1400ab and Model 8500 FDMS (B & C Types)
Opening/Closing Rail Car Plug and Sliding Doors
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Interior Wall and Ceiling Finish
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Zebra® 105SL™ * Removing and Installing Printhead
  Module 4: Hacksaws Mechanical Workshop.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
CORDLESS DRILL WHAT IS IT ? WHAT IS IT USED FOR ? click here
Safely Using Drill Collar Clamps
Wellhead Recovery System The wellhead system that fits the application. (Patent Pending)
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Installing a double Dreamscreen. Check measurement Left.
Optical Manufacturing Solutions 1 Probe Assembly.
Service Brake Adjustments Eric Shogren. Tools Must Haves Wrench 4 Jack Stands Nice to Have Adjusting Board.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Cutting With a Jeweler’s Saw
Volvo 270 Outdrive R&R (for bellows replacement)
Yamaha oil pump rebuild
Split steering gaiter (nearside) this is an MoT failure.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Mortise Locks Created by M.Martin 9/05. Types - your Ref: P45 of textbook.
MyLock 644D Service Seminar.
Typical Walk-in Closet with elfa® décor
Memory Craft Feed Dog Drop Step Motor Adjustments.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
Instructions 1.  SITING YOUR TRAMPOLINE  Your trampoline works best and is safest if it is dead level. If your trampoline is fitted.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Repairing and Reconditioning Tools Tool Fitting. Objectives: 1)Identify and remove rust from tools in the lab with 100% accuracy 2)Demonstrate the application.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
WRENCHES.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Installation. Indoor Unit Installation Typical Installation.
Basic Tool Safety and Equipment
SAFETY RULES Follow all directions the first time they are given. Be courteous in language and actions. Be on time and prepared to participate. Respect.
Installing Dutch Doors…
The most common problem is for a mouthpiece to get stuck. Try not to use force to remove. Try gripping the mouthpiece and turning the instrument. We have.
Module-6 Drilling.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Safety Rules for 9 th Grade Shop Radial Arm Saw: Safety Rules Never cut a board that is less than 12 inches long. Always pull the saw using the handle;
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
Clearing Procedures. DISASSEMBLY Major Groups Barrel Group Turn the cover latch and raise the cover group Grasp the retracting slide handle with the.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
Main Parts of a Drilling Machine
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
VIEW SERIES with Sliding Door
Internal and External Screw Threads
Installation Walkthrough Image Guide
Minimizer Confidential
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Bilge Pump Service Project Model Service Kit
Minimizer Confidential
Step-by-step assembly instructions
CL4NX +Dispenser (KITTING MANUAL)
Building Construction I Sofia Sebastian 1
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
1/17/2019.
Presentation transcript:

UnFramed Canopy Fitting Instructions V3.0 Contents – 1 x handle pack 12 x 30mm Wood Screws 4 x M8 flat washers 3 keys 1x door 4 x M8 - 50mm coach screws. This door is delivered with a protective film To the Frame only and should be removed now if fixing the frame to the back of the brick opening. This door is CE Marked and comes with a Europe wide 2 year warranty, the warranty is subject to conditions please see your dealer or visit doors.co.uk for terms. doors.co.uk Caution Garage doors Are heavy and we recommend that this item be installed by two persons Do not allow children to assist in the installation of this product or use the product un-assisted, garage doors can inflict severe injury if not used correctly. Always ensure the door is correctly adjusted and serviced failure to do so may invalidate the warranty. This does not effect your statutory rights. Wear eye protection and gloves as garage doors have sharp edges. Before you start !! Measure Check measure the door and frame against the brick opening to ensure the door will fit into the opening and then open when installed, also check the frame is square. Check the space required inside the garage that the door will not be impeded by anything in the garage. Frame Requirement This door is ready to install to your timber frame, this must be a minimum 60mm square (ideal size 70mm square ). It must also be sound and free from any rot, splits or damage, garage doors are under extreme pressure from the spring system and a poor frame condition could lead to serious injury if the frame breaks or fails in any way. Tools required Cordless Drill. (or powered) Phillips screwdriver. 10mm socket 10mm ring spanner. Timber wedges for levelling Spirit level Set of Alen keys (if adjustment to spring required) Fixings not supplied Light Oil (3in1) Slamming strip 1 x 1 timber

Until all parts of the installation are finished theres a possibility of being locked out, always ensure someone is inside until you have checked the operation of the locking and adjusted as required. Remove the side tracks by cutting the cable ties note the correct arrangement of the bottom wheel as this is vital later. (Fig1)Note the square holes are at the upper part of the track not the bottom. Measure the door panel and the precise location of the top latch assembly, now fit two spring holders as shown (Fig 2) using 3 x 30mm wood screws. (alternatively place door in opening and mark where latches are to be fitted ). Offer the door up to the opening (two persons required ) and wedge in to place,hook the spring over the spring holders and wedge the door in position, remove the spring transit bracket (fig 3) use a spirit level to ensure the overall satisfactory look of the installation and in particular the level of the frame head is correct. Now check the following – the red and white drum do not foul the brickwork either side. The cables run from the back of the cones against the frame to the wheel assembly. When satisfied with the door position move the spring left or right so that the side arms are level either side (ensure the black side seal on the door can pass through the arms (Fig 3) the bracket on the left is not fixed and you should ensure this is pushed tight against the white drum Now using the 2 x 50mm coach screws fix the top spring assembly into place the bottom edge of the bracket should be in line with the bottom edge of the frame head. Slide the left and right side track over the wheel and anti drop device as shown in fig 1 the bottom edge of the track should be around 35mm below the bottom edge of the wheel, fix the track in place ! Caution if this is not level the door will be difficult to operate, this can be adjusted later if required. Installation Fig 1 Fig 2 Fig 3

Fit the outer handle to the outside of the door, fit the inner lock and the moulded fixing using an Alan key and tighten (Caution !! only tighten enough to remove play from handle, over tightening can damage the outer panel ) Open the door fully and oil the side runners and the wheels / cables and top latches. If 4 point locking purchased see separate sheet and fit now. Caution !!Check the locking works correctly from the inside by closing the door and opening again, do not do this from the outside as if adjustment is required you may not be able to open the door again.Although adjusted in the factory the cables can be disturbed during transport and it is the responsibility of the installer to correct the cables as required. Now oil the tracks / lock and latches and all moving parts – do not grease any part. Adjustment – if the door is opening too slowly or too quickly increase the tension on the spring.Call for advice.This element should only be performed by competent persons. Finish the door frame with trim as required. Locking cables and lifting cables are subject to wear and tear and should be examined regularly, tangling of cables through poor maintenance / adjustment does not constitute as a manufacturing defect. Technical helpline Now pull the pin that is used to secure the tension during transport, this can be quite stiff as it holds the spring pressure, work it side to side to ease it free. Now slowly open the door and check that the side runners are positioned correctly at the top as shown in fig 1. If not positioned correctly the door will not be smooth in operation. Now fit the handle as shown.

Removal. To remove the door you first must replace the spring tension holder shown on page 3. Remove side track screws and slide out the tracks, undo the spring holder bracket screws x 4 and lift the entire spring spring assembly off the locking point/ spring holder and lower the spring to the mid point of the door. Ease the door out of the opening. Every 3 months you must oil all pivot points with 3 in 1 oil, you must check tension of the door ( open the door and ensure it holds in place if it falls contact your dealer or the helpline for more advice ) Clean the paint finish and touch up any marks with the correct Ral colour stick available from your dealer. Refer to the door label for more advice.