1 Wire Harness Sealing Technology CTIS # 29951 Prepared By John Yurtin Updated 1-20-2005 Connection Systems Training.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
UNITED NATIONS Shipment Details Report – January 2006.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
“KB” - “KM” SERIES LIMIT SWITCHES
Disassemble, Assemble and Perform a Function Check on the M249
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
1 CTIS # Prepared By John Yurtin Updated Connection Systems Training Electrical Performance & De-Rating.
Automotive Chassis Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Automotive Technology
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Intracellular Compartments and Transport
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Immunobiology: The Immune System in Health & Disease Sixth Edition
CpSc 3220 Designing a Database
Presentation transcript:

1 Wire Harness Sealing Technology CTIS # Prepared By John Yurtin Updated Connection Systems Training

2 Having a good technical understanding of the products and the technology behind them will help in choosing the right product for the application This training help you understand harness sealing, and the products and technologies available so you can make better harness sealing decisions.. Excellence Performance Goal: Do it right the first time, every time Method: Innovation and continuous improvement

3 Wire Harness Sealing Methods

4 Harness - Sealing Splash Water Sealing Injection Moulding Loose Piece Grommets (Rubber EPDM) Shrinking Grommets Bulkhead Connectors Coverings (tubes, tapes, etc.) Splash Water Sealing Injection Moulding Loose Piece Grommets (Rubber EPDM) Shrinking Grommets Bulkhead Connectors Coverings (tubes, tapes, etc.) Longitudinal / Bundle Sealing Cold Pasticine Hot Melt PUR Foaming Capillary Action Prevention SLS Process Longitudinal / Bundle Sealing Cold Pasticine Hot Melt PUR Foaming Capillary Action Prevention SLS Process Overview

5 A. Cold Plasticine (Butylene rubber) A1. - Manual Assembly (Terostat) A2. - With Auxiliary Devices A2.1 Tyton A2.2 Cold Melt 1 A2.3 Cold Melt 2 B. Hot Melt B1. - Overmoulding B2. - Hot Melt + Shrinking Procedure (Rayblock LMX) C. PUR Foaming Methods For Bundle Sealing

6 Pro´s: - low price - no capital expenditure - simple method - usable for rework Con´s: - no reliable process - depends on operator - maybe sealing A. Cold Plasticine (Butylene rubber) A1. - Manual Assembly (Terostat) Longitudinal / Bundle Sealing

7 Pro´s: - very low capital expenditure - in comparison to Method A1: easier Handling Con´s: - Process Reliability - costly Handling A. Cold Plasticine (Butylene rubber) A2. - With Auxiliary Devices A2.1 Tyton Longitudinal / Bundle Sealing

8 Pro´s: - very low capital expenditure - in comparison to Method A1: easier Handling Con´s: Process Reliability - costly Handling A. Cold Plasticine (Butylene rubber) A2. - With Auxiliary Devices A2.2 Cold Melt 1 Longitudinal / Bundle Sealing

9 Pro´s: - Grommet assembeled on harness - very low capital expenditure - in comparison to Method A1: easier Handling Con´s: - high material price depends on design - Process Reliability - costly Handling A. Cold Plasticine (Butylene rubber) A2. - With Auxiliary Devices A2.3 Cold Melt 2 Longitudinal / Bundle Sealing

10 Pro´s: - Controlled Process - Easy Handling - High Capital Expenditure (~40Thd DM per Machine plus Mould) Con´s: - only for small wire bundles (less than 10 wires) B. Hot Melt B1. - Overmoulding Longitudinal / Bundle Sealing

11 Pro´s: - see A2.2 Con´s: - see A2.2 B. Hot Melt B2. - Hot Melt + Shrinking Procedure (Rayblock LMX) Longitudinal / Bundle Sealing

12 Pro´s: - Combination of 2 Operations (Sealing + Grommet) in one Process Step - Noise Reduction - Reduction of Manual Worktime - Reliability Con´s: - High Capital expenditure (~160thd DM per machine w/o Tools) C. PUR Foaming Longitudinal / Bundle Sealing

13 Capillary Action Preventer

14 13 way sealed Door connection Advantages: New locking system with spring One hand mounting For left or right doors Easy assembly and dis-assembly Doors-Off Connections

15 Grommet/connector retainer Provides positive, one-handed installation of the grommet to the sheetmetal Pre-staged MBS Protects blades during shipment and vehicle assembly plant processing and handling Positive Lever Lock Out Assures that the lever is in the proper position at the time of assembly u Doors-off connections provide an easy means of connecting body wiring to door wiring, especially if the doors are assembled off-line – The system incorporates many patented Delphi design features – Lever Lock mechanical assist means that high circuit count connections can be mated with the fingers Doors-Off Connections

16 ConnectorGrommet/Connector Retainer Design Versatility u Systems are designed to have the connector snap into the grommet/connector retainer – Allows the connector to be used elsewhere in the vehicle as part of an in- line connection system – Also allows the same connector to be used in a different door application by simply changing the grommet/connector retainer geometry Doors-Off Connections

17 u Connection system combines best in class features for mechanical assist sealing, and contact technology u Unique design provides tight contact packaging for optimum use of space u Custom designed to enable improvements in vehicle assembly plant process Doors-Off Connections

18 Doors-Off Connections

19 Custom designed to enable vehicle assembly plant process improvements Connection system technology combines best in class feature for mechanical assist, sealing, and contact technology Mechanical assist feature is contained within the protective door grommet, optimizing the space required Doors-Off Connections

20 Double Click on Photo to Activate Video Clip Doors-Off Connections

21 Compression Gasket Male Terminals Sealed Mating Connector Metal Plate Fuel Tank Pass-Through

22 Grommets

23 Multi-Piece Grommets

24 Grommets

25 Door Grommets

26 Validated to Toyota TSC1156G and passed all the tests. Completed December Build will start at the end of Jan in Japan TOYOTA RAV 4 FOD Grommet Revised opening Larger core out for tooling Extended tube with 15mm Toyota 635N Dash Grommet

27 44mm 30mm A A B B Section A-A Section B-B Core out for tooling 63.5mm Toyota 635N Dash Grommet

28 Additional Changes » Harness branch location in the grommet is critical. The Branch must be centered during the dispensing of the polyurethane. » Polyurethane sealant and grommet (EPDM) are NOT chemically bonded. Gaps between grommet and sealant might be a leak pass. »The rib inside the tube helps cables being centered. »Thinner portion of the tube provides space between cables and the grommet. Cable Toyota 635N Dash Grommet

29 Objectives » To examine whether the revised grommet could accept One-shot application without overflow. To examine the revised opening could accept one-shot application. To examine if upper level of sealants could reach here. Primary Sealing SLS Grommet

30 Click picture below to activate video SLS Grommet Process